Other: L-88-510, Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date, L-89-124, Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing, L-90-160, Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion, L-90-196, Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info, L-90-277, Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request, ML17347A954, ML17348A231, ML17348A906
|
MONTHYEARML17345A3591988-09-0707 September 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Enhancement of Emergency Electrical Power Sys.Attendance List,Meeting Agenda & Handouts Encl Project stage: Meeting L-88-510, Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date1988-12-14014 December 1988 Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date Project stage: Other ML17345A6291989-01-0606 January 1989 Forwards Request for Addl Info Re Util 880623 Emergency Power Sys Enhancement Project & 881019 Testing Program of New Diesel Generators,In Order to Complete Review in Timely Manner.Response Requested within 30 Days of Ltr Date Project stage: RAI ML17347A9541989-02-0303 February 1989 Requests Extension of Time Until 890206 to Provide Addl Info Re Emergency Power Sys Enhancement Project Project stage: Other ML17347A9901989-02-24024 February 1989 Forwards Response to 890106 Request for Addl Info Re Emergency Power Sys Enhancement Project.Responses to Listed Questions & All Requests Dealing W/Emergency Diesel Generator Qualification Testing Will Be Provided by 890320 Project stage: Request L-89-107, Forwards Supplemental Responses to NRC 890106 Request for Addl Info Re Emergency Power Sys Enhancement Project1989-03-20020 March 1989 Forwards Supplemental Responses to NRC 890106 Request for Addl Info Re Emergency Power Sys Enhancement Project Project stage: Supplement L-89-124, Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing1989-04-0303 April 1989 Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing Project stage: Other ML17347B2491989-08-10010 August 1989 Forwards Safety Evaluation Supporting Qualification of New Emergency Diesel Generators Being Installed as Part of Emergency Power Sys enhancement.Morrison-Knudsen Proposed 30 Start & Load Acceptance Test Acceptable Project stage: Approval ML17347B6241990-03-16016 March 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project to Continue Review of 890403 Submittal. Response Requested within 30 Days of Ltr Date Project stage: RAI L-90-140, Forwards Response to 900316 Request for Addl Info Re Emergency Power Sys Enhancement project,specifically,1986 Edition of ANSI B31.1 Code Design Basis Code for Diesel Generator Piping1990-04-16016 April 1990 Forwards Response to 900316 Request for Addl Info Re Emergency Power Sys Enhancement project,specifically,1986 Edition of ANSI B31.1 Code Design Basis Code for Diesel Generator Piping Project stage: Request ML17348A2101990-04-25025 April 1990 Summary of 900409-11 Meeting W/Util in Rockville,Md Re Emergency Power Sys Enhancement.Agenda & List of Attendees Encl Project stage: Meeting L-90-160, Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion1990-05-0202 May 1990 Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion Project stage: Other ML17348A2311990-05-0404 May 1990 Forwards Proof & Review Tech Specs for Emergency Power Enhancement Program for Comment by 900509 Project stage: Other L-90-196, Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info1990-06-0404 June 1990 Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info Project stage: Other ML17348A3171990-06-15015 June 1990 Forwards Final Draft of Tech Specs for Emergency Power Sys Enhancement Project,For Review & Certification That Final Draft Consistent W/Updated FSAR & w/as-built Plant. Certification Should Be Provided Under Oath & Affirmation Project stage: Draft Other ML17348A2951990-06-15015 June 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project Project stage: RAI ML17348A3741990-07-0202 July 1990 Application for Amend to Licenses DPR-31 & DPR-41,approving Design for Mod of Emergency Power Sys (Eps).Eps Enhancement Project Design Will Add Two New Class IE Emergency Diesel Generators & Make Improvements to Electrical Power Sys Project stage: Request ML17348A3721990-07-0505 July 1990 Requests Addl Info on Emergency Power Sys Enhancement Project by 900723,in Order to Complete Review of Rept,Per 880623 Submittal,As Supplemented 890403 & 900604 Project stage: Approval L-90-277, Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request1990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request Project stage: Other ML17348A5491990-09-10010 September 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project.Response Requested by 900924 Project stage: RAI ML17348A9061991-03-12012 March 1991 Forwards Revised Safety Analysis for Emergency Power Sys Enhancement Project,Concluding That Proposed Emergency Diesel Generator Loading Scheme & Sequencer Changes Acceptable Project stage: Other L-91-089, Application for Amends to Licenses DPR-31 & DPR-41,changing TS 3.3.2 Re ESFAS,3.3.3.4 Re Fire Detection Instrumentation, 3/4.7.8.3 Re Fire Hose Stations & 3.8.3 Re Onsite Power Distribution Per Emergency Power Enhancement Project1991-04-0404 April 1991 Application for Amends to Licenses DPR-31 & DPR-41,changing TS 3.3.2 Re ESFAS,3.3.3.4 Re Fire Detection Instrumentation, 3/4.7.8.3 Re Fire Hose Stations & 3.8.3 Re Onsite Power Distribution Per Emergency Power Enhancement Project Project stage: Request 1990-04-25
[Table View] |
Text
~ ~$ REoy,
'(4 P0 Cy
~c lu OO
/+
4.
0
+w*e+
Docket Nos.
50-250 and 50-251 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 16, 1990 Mr. J.
H. Goldberg Executive Vice President - Nuclear Florida Power an d Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420
Dear Mr. Goldberg:
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - RE(VEST FOR ADDITIONAL INFORMATION ON EMERGENCY POWER SYSTEt<
ENHANCEMENT PROJECT (TAC NOS.
69023 AND 69024)
The purpose of this letter is to request additional information regarding the Emergency Power System (EPS)
Enhancement Project so that we can complete our review in a timely manner.
In your submittal dated June 23, 1988, as supplemented April 3, 1989, you provided the EPS Enhancement Report to the NRC staff.
Your subsequent letter dated December 14, 1988 detailed the FPL licensing approach for this Project and made clear that NRC review of the June 23, 1988 submittal was desired.
Our earlier request for additional information, dated January 6,
- 1989, was followed by your responses dated February 24 and March 20, 1989.
In order to complete our review, we require the additional information described in the enclosure.
This information was discussed ear lier with Mr. T. Grozan of your staff.
Please provide your responses to the requests in the enclosure within 30 d@s of the date of this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.
col 9003230286 900316 PDR ADOCK 05000250 PDC
8
~'E
'V
ftr. J.
H. Goldberg March 16, 1990 Any questions concerning the enclosed comments should be directed to the me.
Sincerely, Enc losure:
As stated cc w/enclosure:
See next page D.ISTR IBUT.ION (Docket File I
t~RC 8 Local PDRs PD22 Rdg
- SVarga, 14/E/4
- GLainas, 14/H/3 DMi 1 ler GEdison
- LOlshan, 13/D/1 OGC
- EJordan, 3302 MNBB BGrimes, 9/A/2 HBer kow TMarsh GBagchi C.
Y.
Cheng K. Manoly H. Asher M. Hartzman ACRS (IO)
Original Signed By Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation FC WWWt W
-2
- PM: PD II-2:D' WI WWWWWWW NAME :
DATE :3/1 /90
- GEdison: sl:
erk w
- 3/~~/90:3/fP/90
~
~ W WWWWO OFFICIAL RECORD COPY Document Name:
LETTER TO GOLDBERG
~8 I
II I
II I I I
~
'I I',
I
~
'4 I
4'l II N
)
~
~ /I
~
I
,I e
C I '
II il'(..J,i,
~
Mr. J.
H. Goldberg Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tal 1 ahassee, Flori da 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Flori da 33131-2398 Mr. K.
N. Harris, Yice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128
'enior Resident Inspector Turkey Point Nuclear Generating Station U.S.
Nuclear Regulatory Comnission Post Office Box 57-1185 Miami, Flori da 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Serv ices 1317 Winewood Blvd.
Ta1 laha ssee, Flori da 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Flori da 32301 Administrator Department of Environoantal Reg u 1ati on Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Flori da 32301 Regional Administrator, Region II U.S.
Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Ta 1 1 aha ssee, Flori da 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102
~
I A
~
~ 1
~
'CR ENCLOSURE RE VEST FOR ADDITIONAL INFORINTION EthER C
R EN E
JECT The following applies to the new structures, systems and components (SSC) that are to be added for the proposed Emergency Power System Enhancement
- Project, to the interfaces of the SSC with the existing p1ant, and to the interfaces with the existing plant of those SSC that are to be relocated or reconnected.
1.
Your response dated March 20, 1989 (letter L-89-107) repeatedly referenced the ANSI B31.1 code as a design basis for diesel generator'iping.
Please specify the edition of this code on which you rely.
2.
Please specify the criteria for acceptability of the piping vibration (during testing) for piping attached to the diesel generators.
3.
In the structural area, please address the seismic input used in the ana lysi s.
4.'lease discuss how the soil structure interaction (SSI) effects were con si dered.
5.
Please address how structural load combinations were considered.
6.
Please address how the common foundation was analyzed.