Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project to Continue Review of 890403 Submittal. Response Requested within 30 Days of Ltr Date
ML17347B624
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/16/1990
From: Edison G
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
TAC-69023, TAC-69024, NUDOCS 9003230286
Download: ML17347B624 (8)


Text

~ ~$ REoy,

'(4 P0 Cy

~c lu OO

/+

4.

0

+w*e+

Docket Nos.

50-250 and 50-251 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 16, 1990 Mr. J.

H. Goldberg Executive Vice President - Nuclear Florida Power an d Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420

Dear Mr. Goldberg:

SUBJECT:

TURKEY POINT UNITS 3 AND 4 - RE(VEST FOR ADDITIONAL INFORMATION ON EMERGENCY POWER SYSTEt<

ENHANCEMENT PROJECT (TAC NOS.

69023 AND 69024)

The purpose of this letter is to request additional information regarding the Emergency Power System (EPS)

Enhancement Project so that we can complete our review in a timely manner.

In your submittal dated June 23, 1988, as supplemented April 3, 1989, you provided the EPS Enhancement Report to the NRC staff.

Your subsequent letter dated December 14, 1988 detailed the FPL licensing approach for this Project and made clear that NRC review of the June 23, 1988 submittal was desired.

Our earlier request for additional information, dated January 6,

1989, was followed by your responses dated February 24 and March 20, 1989.

In order to complete our review, we require the additional information described in the enclosure.

This information was discussed ear lier with Mr. T. Grozan of your staff.

Please provide your responses to the requests in the enclosure within 30 d@s of the date of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

col 9003230286 900316 PDR ADOCK 05000250 PDC

8

~'E

'V

ftr. J.

H. Goldberg March 16, 1990 Any questions concerning the enclosed comments should be directed to the me.

Sincerely, Enc losure:

As stated cc w/enclosure:

See next page D.ISTR IBUT.ION (Docket File I

t~RC 8 Local PDRs PD22 Rdg

SVarga, 14/E/4
GLainas, 14/H/3 DMi 1 ler GEdison
LOlshan, 13/D/1 OGC
EJordan, 3302 MNBB BGrimes, 9/A/2 HBer kow TMarsh GBagchi C.

Y.

Cheng K. Manoly H. Asher M. Hartzman ACRS (IO)

Original Signed By Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation FC WWWt W

-2

PM: PD II-2:D' WI WWWWWWW NAME :

DATE :3/1 /90

GEdison: sl:

erk w

3/~~/90:3/fP/90

~

~ W WWWWO OFFICIAL RECORD COPY Document Name:

LETTER TO GOLDBERG

~8 I

II I

II I I I

~

'I I',

I

~

'4 I

4'l II N

)

~

~ /I

~

I

,I e

C I '

II il'(..J,i,

~

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tal 1 ahassee, Flori da 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Flori da 33131-2398 Mr. K.

N. Harris, Yice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128

'enior Resident Inspector Turkey Point Nuclear Generating Station U.S.

Nuclear Regulatory Comnission Post Office Box 57-1185 Miami, Flori da 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Serv ices 1317 Winewood Blvd.

Ta1 laha ssee, Flori da 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Flori da 32301 Administrator Department of Environoantal Reg u 1ati on Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Flori da 32301 Regional Administrator, Region II U.S.

Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Ta 1 1 aha ssee, Flori da 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102

~

I A

~

~ 1

~

'CR ENCLOSURE RE VEST FOR ADDITIONAL INFORINTION EthER C

R EN E

JECT The following applies to the new structures, systems and components (SSC) that are to be added for the proposed Emergency Power System Enhancement

Project, to the interfaces of the SSC with the existing p1ant, and to the interfaces with the existing plant of those SSC that are to be relocated or reconnected.

1.

Your response dated March 20, 1989 (letter L-89-107) repeatedly referenced the ANSI B31.1 code as a design basis for diesel generator'iping.

Please specify the edition of this code on which you rely.

2.

Please specify the criteria for acceptability of the piping vibration (during testing) for piping attached to the diesel generators.

3.

In the structural area, please address the seismic input used in the ana lysi s.

4.'lease discuss how the soil structure interaction (SSI) effects were con si dered.

5.

Please address how structural load combinations were considered.

6.

Please address how the common foundation was analyzed.