Letter Sequence RAI |
|---|
|
Results
Other: L-88-510, Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date, L-89-124, Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing, L-90-160, Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion, L-90-196, Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info, L-90-277, Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request, ML17347A954, ML17348A231, ML17348A906
|
MONTHYEARML17345A3591988-09-0707 September 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Enhancement of Emergency Electrical Power Sys.Attendance List,Meeting Agenda & Handouts Encl Project stage: Meeting L-88-510, Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date1988-12-14014 December 1988 Submits Requested Addl Info Re Emergency Power Sys Enhancement Project.Project Will Be Implemented in Two Phases Consisting of Outage & pre-outage Activities to Meet Integrated Schedule 1990 Completion Date Project stage: Other ML17345A6291989-01-0606 January 1989 Forwards Request for Addl Info Re Util 880623 Emergency Power Sys Enhancement Project & 881019 Testing Program of New Diesel Generators,In Order to Complete Review in Timely Manner.Response Requested within 30 Days of Ltr Date Project stage: RAI ML17347A9541989-02-0303 February 1989 Requests Extension of Time Until 890206 to Provide Addl Info Re Emergency Power Sys Enhancement Project Project stage: Other ML17347A9901989-02-24024 February 1989 Forwards Response to 890106 Request for Addl Info Re Emergency Power Sys Enhancement Project.Responses to Listed Questions & All Requests Dealing W/Emergency Diesel Generator Qualification Testing Will Be Provided by 890320 Project stage: Request L-89-107, Forwards Supplemental Responses to NRC 890106 Request for Addl Info Re Emergency Power Sys Enhancement Project1989-03-20020 March 1989 Forwards Supplemental Responses to NRC 890106 Request for Addl Info Re Emergency Power Sys Enhancement Project Project stage: Supplement L-89-124, Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing1989-04-0303 April 1989 Forwards Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing, Providing Addl Info Re Testing on Various Components & Sys During Turnover & Startup During Preoperational Testing Project stage: Other ML17347B2491989-08-10010 August 1989 Forwards Safety Evaluation Supporting Qualification of New Emergency Diesel Generators Being Installed as Part of Emergency Power Sys enhancement.Morrison-Knudsen Proposed 30 Start & Load Acceptance Test Acceptable Project stage: Approval ML17347B6241990-03-16016 March 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project to Continue Review of 890403 Submittal. Response Requested within 30 Days of Ltr Date Project stage: RAI L-90-140, Forwards Response to 900316 Request for Addl Info Re Emergency Power Sys Enhancement project,specifically,1986 Edition of ANSI B31.1 Code Design Basis Code for Diesel Generator Piping1990-04-16016 April 1990 Forwards Response to 900316 Request for Addl Info Re Emergency Power Sys Enhancement project,specifically,1986 Edition of ANSI B31.1 Code Design Basis Code for Diesel Generator Piping Project stage: Request ML17348A2101990-04-25025 April 1990 Summary of 900409-11 Meeting W/Util in Rockville,Md Re Emergency Power Sys Enhancement.Agenda & List of Attendees Encl Project stage: Meeting L-90-160, Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion1990-05-0202 May 1990 Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion Project stage: Other ML17348A2311990-05-0404 May 1990 Forwards Proof & Review Tech Specs for Emergency Power Enhancement Program for Comment by 900509 Project stage: Other L-90-196, Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info1990-06-0404 June 1990 Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info Project stage: Other ML17348A3171990-06-15015 June 1990 Forwards Final Draft of Tech Specs for Emergency Power Sys Enhancement Project,For Review & Certification That Final Draft Consistent W/Updated FSAR & w/as-built Plant. Certification Should Be Provided Under Oath & Affirmation Project stage: Draft Other ML17348A2951990-06-15015 June 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project Project stage: RAI ML17348A3741990-07-0202 July 1990 Application for Amend to Licenses DPR-31 & DPR-41,approving Design for Mod of Emergency Power Sys (Eps).Eps Enhancement Project Design Will Add Two New Class IE Emergency Diesel Generators & Make Improvements to Electrical Power Sys Project stage: Request ML17348A3721990-07-0505 July 1990 Requests Addl Info on Emergency Power Sys Enhancement Project by 900723,in Order to Complete Review of Rept,Per 880623 Submittal,As Supplemented 890403 & 900604 Project stage: Approval L-90-277, Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request1990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request Project stage: Other ML17348A5491990-09-10010 September 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project.Response Requested by 900924 Project stage: RAI ML17348A9061991-03-12012 March 1991 Forwards Revised Safety Analysis for Emergency Power Sys Enhancement Project,Concluding That Proposed Emergency Diesel Generator Loading Scheme & Sequencer Changes Acceptable Project stage: Other L-91-089, Application for Amends to Licenses DPR-31 & DPR-41,changing TS 3.3.2 Re ESFAS,3.3.3.4 Re Fire Detection Instrumentation, 3/4.7.8.3 Re Fire Hose Stations & 3.8.3 Re Onsite Power Distribution Per Emergency Power Enhancement Project1991-04-0404 April 1991 Application for Amends to Licenses DPR-31 & DPR-41,changing TS 3.3.2 Re ESFAS,3.3.3.4 Re Fire Detection Instrumentation, 3/4.7.8.3 Re Fire Hose Stations & 3.8.3 Re Onsite Power Distribution Per Emergency Power Enhancement Project Project stage: Request 1990-04-25
[Table View] |
Text
September 10, 1990 Docket Nos.
50-250 and 50-251 Mr. J.
H. Goldberg Executive Vice President Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420
Dear Mr. Goldberg:
DISTRIBUTION:
HBerkow J. Joyce, SICB S.
Newberry,SICB J. Knight Driller SVarga MSinkule, RII GLainas EJokdan OGC ACRS (10)
PD22 Rdg. File GEdison M. Waterman, SICB A. Toalston, SELB F.
Rosa NRC 5 Local PDRs
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION ON EMERGENCY POWER SYSTEM ENHANCEMENT PROJECT (TAC NOS.
69023 AND 69024)
The purpose of this letter is to request additional information regarding the Emergency Power System (EPS)
Enhancement Project.
The staff has reviewed your submittals in support of the Emergency Power System Enhancement Project.
The review indicates that the staff requires additional information described in the enclosure.
Questions Nos.
1 - 4 were discussed by telephone with Dean Baker of your staff on August 27, 1990.
Question No.
5 was discussed by telephone with Tom Grozan of your staff on September 5, 1990.
We request that you provide the responses by September 24,
- 1990, so that the staff can complete its review in a timely manner.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.
Any questions you may have concerning the questions should be directed to me Sincere ly, (Original Signed By)
Encl osur e:
As stated cc w/enclosure:
See next page Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation NAME DATE
- 9/
90
- GEdison:sl
- 9/ y/90
- HB rk
- 9//g /90 OFFICIAL RECORD COPY Document Name:
LETTER51 9005'f70082 5'009i0 PDR ADOCK 05000250 0~'
PDC
r Ct W
e(
)t (l
Mr. J.
H. Goldberg Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Ta 1 1ahassee, Florida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center fliami, Florida 33131-2398 Mr. K. N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County Ill NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office. of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Ta 1 1 ahas see, F lorida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Ta 1 lahassee, F lorida 32301 Reg iona 1 Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102
r.
r
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION REGARDING EMERGENCY POWER SYSTEM ENHANCEMENT PROJECT The following questions relate to the design of the electrical load sequences.
1.
Provide a detailed description of the device(s) used to accomplish electrical isolation, and describe the specific testing performed to demonstrate that the device is acceptable for its application(s).This description should include elementary diagrams to indicate the test configuration and how the maximum credible faults were applied to the device(s).
2.
Provide data to verify that the maximum credible faults applied during the test were the maximum voltage/current to which the device could be
- exposed, and define how the maximum voltage/current was determined.
3.
Provide data to verify that the maximum credible fault was applied to the output of the device in the transverse mode (between signal and return) and to verify that other faults were considered, i.e.
open and short circuits.
4.
Define the pass/fai 1 acceptance criteria for each type of device.
5.
Provide a discussion of protective devices or other means provided to prevent lightning strikes or switching surges from propagating to the solid state programmable logic load sequencer s and causing a
common mode failure of the load sequencers.