MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
CATEGORY 1 t~
REGULA vRY INFORMATION DISTRIBUTION~ SYSTEM (RIDS)
ACCESSION NBR:980 6300511 DOC.DATE: 98/06/25 NOTARIZED: NO DOCKET ¹ FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50;529 .Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE, J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Requests approval of proposed code alternative IAW provisions of 10CFR50.55a(a))3),for installation of in-line safety-related flow measurement instrument in ASME Class 3 pipe. T DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES:STANDARDIZED PLANT 05000528 Standardized plant. l 050005290 Standardized plant. 05000530 R
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RAB 1 1 ENTER 0 1 1 NRR/DE/ECGB 1 1 T C 1 1 OGC/HDS2 1 0 D
RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED B YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LT 14 ENCL 13
I Coemltecat. /nnoetlaa &eryy.
James M. Levine TEL (602)393-5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)3936077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 65072-2034 102-04138-JML/SAB/RKB June 25, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Docket Nos. STN 50-628/629/530 Request for Proposed Alternative to ASME Section III Class 3 Requirements for Installation of Safety-Related Flow Measurement Instrumentation Arizona Public Service Company (APS) hereby requests NRC Staff approval of a proposed code alternative, in accordance with the provisions of 10 CFR 50;-55a (a)(3), for the installation of an in-line safety-related flow measurement instrument in an ASME Class 3 pipe.
The proposed alternative is part of a design modification to the Chemical and Volume Control System (CVCS) to improve overall system performance. Issues regarding the performance of this system have been discussed with the NRC and documented in NRC Inspection Report 97-05.
Part of the solution to correct CVCS makeup components and control issues is to replace the existing flow sensors with Coriolis type flow detectors, which are capable of reliably measuring low flow rates. Because the design of this type of flow measurement device involves 100% of line flow passing through the inst'rument, the proposed flow measurement instrument will also have a pressure retaining function. These flow detection instruments are not currently available under an ASME Section III Quality Assurance program. However, APS has taken significant steps to ensure the level of quality. associated with the flow detector design, manufacture, testing, dedication and installation is commensurate with ASME Section III Class 3 requirements, thereby ensuring that an adequate level of quality and safety is provided. A detailed description of the proposed modification and justification for installation is provided in the attachment.
98063005ii.,980625 PDR ADOCK 05000528 P PD~R
11 '
U.S. Nuclear Regulatory Commission Document Control Desk Request for Proposed Alternative to ASME Section III Class 3 Requirements for Installation of Safety-Related Flow Measurement Instrumentation.
Page 2 The first of three PVNGS modifications is scheduled for the Unit 3 refueling outage, which begins on September 12, 1998. Therefore, APS requests the Staffs review and response by August 31, 1998.
Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions.
Sincerely, JML/SAB/RKB/mah Enclosure cc: E. W. Merschoff M. B. Fields K. E. Perkins J. H. Moorman
ENCLOSURE Proposed Code Alternative for the Installation of Safety-Related Flow Measurement Instrumentation
l
~ ~
Purpose:
The Code of Federal Regulations, Title 10, Part 50.55a, subsection (a)(3) states in part:
Proposed alternatives to the requirements ... may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. The applicant shall demonstrate that:
The proposed alternatives would provide an acceptable level of quality and safety, or Compliance with the specified requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.
In accordance with the provisions of 10 CFR 50.55a (a)(3), APS is requesting NRC Staff approval of a code alternative to ASME Section III, Class 3 requirements for the installation of an in-line safety-related flow sensor instrument, which will provide an adequate level of quality and safety.
Background:
The CVCS allows the operator to control reactor coolant system (RCS) inventory and adjust RCS boron concentration. While the system has generally performed as designed, several operational problems have occurred with this equipment since start-up. Most can be attributed to an original design limitation that neither the borate nor non-borate flow control loops can reliably control the process at flow rates below approximately 17 gpm. As a consequence, PVNGS Operations has had difficulty establishing a smooth power ascension rate after refueling because fuel preconditioning limits typically require dilution flow rates less than 10 gpm. In addition, at end of cycle, RCS boron concentration is so low that boration flow rates of less than 5 gpm are needed to prevent reactivity excursions during automatic makeup to the Volume Control Tank (VCT).
Additional problems stem from low boration flow rate control difficulties, and during the period of 1993 through 1997,numerous Condition Report/Disposition Requests (CRDR's) were generated on malfunctions and operator errors associated with the makeup control. system or its components. Design weaknesses and their consequent impacts on the PVNGS Operations staff were also noted by the NRC in Inspection Report 97-05.
&<a W('%p l
Description of Change:
One part of the solution to correct CVCS makeup components and control is to replace the existing flow sensors (the orifice plate FE-210X and the ultrasonics FE-210Y-1 and FE-210Y-2) with Coriolis type flow sensors, which are capable of reliably measuring low flow rates. The purpose of the flow sensors, CH-FE-210X and CH-FE-210Y, is to provide indication to the control room on the amount of borated water that is being added to the VCT or directly to the suction of the charging pumps. The flow detector is manufactured by MicroMotion Inc. (MMI),
and is an ELITE Model CMF200, capable of measuring the mass flow rate and density of process fluids.
As seen in Figure 1, the flow sensor is installed in-line with the process piping.
Flow is directed into the manifold and split through two stainless steel tubes, both less than one-inch diameter, with the tubes hermetically encapsulated in a stainless steel tube housing to protect the flow detector sensors from harsh environments, as well as capturing any unanticipated tube leakage. Any leakage into the housing and subsequent sensor failure due to water contact is detected immediately through continuous flow monitoring. The Coriolis flow sensor will only be supporting normal operations. Under emergency conditions, the path containing the flow sensor is bypassed and alternate emergency boration paths are used to supply borated water to the suction of the charging system.
Therefore, the detector is not required to function during or after an accident.
- ,,File Path Process Fittintt Se'nsor Housing Figure 1. MMI ELITE Model CMF200 Flow Sensor
~
c~
1
Design Requirements:
The piping for normal borated make-up water to the reactor coolant system, CH line N-152-HCCA-2" has been designated as ASME Section III, Class 3.
Although the MMI flow detector is an instrument, the instrument is installed in-line with the piping and thus proVides a pressure boundary function. The sensor is available only as commercial grade non-ASME quality and is dedicated for safety-related service. However, the flo'w meter will be constructed, tested and dedicated to in accordance with 10 CFR 21 and APS'0 CFR 50, Appendix B Quality Assurance Program and thus represents a code alternative which provides an adequate level of quality and safety.
Manufacturing:
The flow sensor will be manufactured, with a pressure boundary tube (housing) which encases the two stainless steel. flow tubes to contain the process fluid in the unlikely event of leakage. The materials of construction will be stainless steel for the instrument flow tubes, manifold; and the housing. The use of stainless steel is consistent with the system materials and provides corrosion resistance from boric acid. The low carbon grades of stainless steels minimize the potential material sensitization during welding.
Welding of the instrument will be performed using APS approved procedures qualified per ASME Code Section IX. Welder and procedure qualification will also be per Section IX.
Testing:
Flow sensor tubing full penetration butt-welds will be required by APS to be radiographed per ASME Section V. Surface liquid penetrant examinations will also be required to be performed on all welded surfaces. This NDE testing meets the original 1974, W75 ASME Class 3 requirements for tubular products, ND-2560, which requires radiography for welded tubular products and fittings.
Vendor procedures require that NDT personnel (RT, LP, UT 8 visual) be qualified in accordance with ASME Section V, and ASNT-TC-1A-1 992 Ed.
Per the APS approved manufacturer requirements, the flow sensor tubing and the housing will be pressure tested to at least 300 psig; i.e., 1.5 times the pressure rating for the line per Palo Verde Piping and Material Classification.
Installation:
The flow sensor will be installed under Palo Verde'sSection XI Repair and Replacement program. The existing stainless steel piping will be cut, allowing approximately a two-foot gap for the flow meter to be installed. The pipe ends will be modified to allow flanged fittings. Pipe flanges and associated bolting will be ASME Section III qualiTied material. Post installation testing will be per Section XI requirements.
Quality Assurance:
The manufacturer, MMI, has an ISO 9001 Quality Systems Certificate (No. QSC-3040) for the design, manufacturer and service of Coriolis Mass and Density Measurement Equipment, including electronic accessories. This program is being used in lieu of the normal ASME Section III, NCA-4000 Quality Program requirements. However, the manufacturer's quality program, with additional quality requirements imposed by APSwill provide an acceptable level of quality.
The manufacturer has been surveyed by APS during the period of October 22-24, 1997. The purpose of the survey was to evaluate the adequacy and verify implementation of the MMI quality program. Critical characteristics reviewed included:
~ Materials of Construction for pressure boundary components
~ General Configuration
~ Welding of pressure boundary components
~ NDE (liquid penetrant and radiography)
~ Hydrostatic testing, including water purity
~ Cleaning APS also reviewed the manufacturer's design control process, nonconformance control and metrology. APS found that MMI implements the controls required in the Quality Systems Manual Rev. H dated May 1997 with detailed procedures and instructions. The level of detail in the procedures and their ready availability, displayed in the work areas, was considered to be a strong point in the MMI system. This, along with the involvement of supervisory and engineering support personnel, contributes to a controlled system with the capability of producing reliable quality results.
4 e~
t f
f
Supplemental Quality Requirements:
APS will require additional materials testing and verification for pressure boundary materials. MMI has the ability to take traceable samples for testing and to maintain the traceability of materials once it has been verified. Testing will be performed in accordance with 10 CFR 21 and 10 CFR 50, Appendix B Quality Assurance Program. Pressure boundary weld filler materials will be supplied to MMI by APS under our Nuclear Quality Assurance program.
APS will require that pressure boundary welds and attachments to pressure boundary material be welded using ASME Section IX qualiTied procedures. AII welding procedures and procedure qualification records will be reviewed and approved by APS prior to fabrication.
APS previously performed independent water quality verification for halogens for MMI hydro-test water and found the water quality to be acceptable. The water used for hydrostatic testing during the manufacturing process will also be tested.
Summary:
The CVCS allows the operator to control reactor coolant system inventory and adjust RCS boron concentration. While the system has generally performed as designed, several operational problems have manifested in this equipment since start-up. Most can be attributed to an original design limitation that neither the borated or non-borated flow control loops can reliably control the process at flow rates below approximately 17 gpm. As a consequence, PVNGS Operations has had difficulty establishing a smooth power ascension rate after refueling because fuel preconditioning limits typically require dilution flow rates less than 10 gpm.
To correct this and other design issues associated with the CVCS, APS is in the process of developing design modifications. A key element of the modiTications is the installation and use of the Micro Motion Inc., (MMI) flow sensor instrument.
This instrument is installed in-line with the pressure retaining ASME Class 3 piping and thus provides a pressure boundary function.
The flow detector is available only as commercial grade and will be dedicated to safety-related quality. However, the flow sensor will be constructed and tested in accordance with 10 CFR 21 and APS',0 CFR 50, Appendix B Quality Assurance Program. The manufacturer has been surveyed by APS and additional quality requirements for material traceability,,fabrication and testing have been imposed.
APS believes that the quality level of,the flow sensor represents an acceptable alternative to ASME Section III, Class 3 pressure boundary quality requirements.
The flow sensor will also provide essential support to the improved operation of reactor coolant make-up and reactivity, control.
In accordance with the provisions of 10 CFR 50.55a (a)(3), APS is requesting NRC Staff approval of a code alternative to ASME Section III, Class 3 requirements for the installation of an in-line safety-related flow sensor instrument, which will provide an adequate level of quality and safety.
0 '4 0