Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17229B067 | 16 March 1999 | Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. | Boric Acid Shutdown Margin Stroke time Incorporated by reference Cold shutdown justification |
ML17355A280 | 30 September 1998 | Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. | Fire Barrier Coatings |
ML17229B001 | 31 January 1998 | Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. | Hot Short Safe Shutdown Boric Acid High winds Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Tornado Generated Missile Design basis earthquake Earthquake Fire Protection Program Fire Watch |
ML17229A415 | 27 May 1997 | Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. | Boric Acid Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment |
ML17228B126 | 31 March 1995 | Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld Scaffolding |
ML17309A747 | 30 September 1994 | Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. | |
ML17228A885 | 30 September 1994 | Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept | |
ML20138E148 | 22 June 1993 | Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept | Boric Acid Stroke time Incorporated by reference Power Operated Valves Backfit |
ML20105D087 | 31 August 1992 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station | Probabilistic Risk Assessment |
ML17309A665 | 30 November 1991 | Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. | Boric Acid Shutdown Margin Stroke time Power-Operated Valves Power Operated Valves |
ML17223B323 | 31 August 1991 | TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). | Anticipated operational occurrence Safe Shutdown Earthquake Earthquake Fuel cladding |
ML17308A504 | 17 August 1990 | Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. | Safe Shutdown Boric Acid |
ML17308A482 | 31 May 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept | |
ML17222A741 | 31 January 1989 | Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. | Hydrostatic Incorporated by reference Liquid penetrant |
ML17223A132 | 31 December 1988 | Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. | Loop seal Anticipated operational occurrence Operating Basis Earthquake Design basis earthquake |
ML17223A129 | 31 December 1988 | Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. | Loop seal Anticipated operational occurrence Operating Basis Earthquake Design basis earthquake |
ML20244C293 | 30 November 1988 | Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept | |
ML17308A446 | 31 March 1988 | Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. | Tornado Missile |
ML20196G292 | 29 February 1988 | Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 | Safe Shutdown Earthquake Earthquake |
ML17347A593 | 31 July 1987 | Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept | |
ML17308A239 | 30 June 1987 | Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept | |
ML17219A687 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept | |
ML20206K633 | 8 April 1987 | Mod 3,changing Billing Address,To Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant | |
ML20206K611 | 8 April 1987 | Notification of Contract Execution,Mod 3,to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant. Contractor:Univ of Tx at Austin Applied Research Labs | |
ML20214R743 | 31 March 1987 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 | |
ML20214R153 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept | |
ML20215G274 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 | |
ML17308A289 | 31 January 1987 | Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept | |
ML20210Q448 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept | |
ML20211L311 | 8 December 1986 | Notification of Contract Execution,Mod 2,to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant. Contractor: Univ of Texas, Applied Research Labs | |
ML20211L338 | 8 December 1986 | Mod 2,extending Period of Performance to 870630 at No Addl Cost, to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant | |
ML20205D358 | 6 August 1986 | Mod 1,extending Period of Performance Until 861130 at No Addl Cost,To Quantify Performance of Waterborne Intruder Detection Sys at St Lucie Nuclear Power Plant | |
ML20205D341 | 6 August 1986 | Notification of Contract Execution,Mod 1,to Quantify Performance of Waterborne Intruder Detection Sys at St Lucie Nuclear Power Plant. Contractor:Univ of Texas | |
ML20206H442 | 23 June 1986 | Contract: Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant, Awarded to Univ of Texas at Austin | |
ML20206H417 | 23 June 1986 | Notification of Contract Execution: Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant, Awarded to Univ of Texas at Austin | |
ML17308A242 | 31 May 1986 | Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. | Grab sample |
ML17308A215 | 30 April 1986 | First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20197C602 | 30 April 1986 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 | |
ML17216A433 | 13 January 1986 | SPDS Progress Review,St Lucie 1 & 2. | Backfit |
ML17301A184 | 17 June 1985 | Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept | Operating Basis Earthquake Finite Element Analysis Tornado Generated Missile |
ML17301A167 | 28 February 1985 | Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. | Grab sample |
ML20080E071 | 13 January 1984 | Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept | Backfit |
ML17214A693 | 31 October 1983 | Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept | |
ML17301A062 | 31 October 1983 | Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). | Safe Shutdown Control of Heavy Loads |
ML17214A204 | 30 April 1983 | Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML17214A158 | 29 April 1983 | Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML17214A155 | 26 April 1983 | Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. | Boric Acid Grab sample Offsite Dose Calculation Manual Process Control Program Power change |
ML17214A454 | 2 March 1983 | Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept | |
ML17301A013 | 24 November 1982 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept | Boric Acid Shutdown Margin |
ML20065U235 | 31 October 1982 | Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 |