ML17229B06716 March 1999Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program.Boric Acid
Shutdown Margin
Stroke time
Incorporated by reference
Cold shutdown justification
ML17355A28030 September 1998Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point.Fire Barrier
Coatings
ML17229B00131 January 1998Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2.Hot Short
Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Tornado Generated Missile
Design basis earthquake
Earthquake
Fire Protection Program
Fire Watch
ML17229A41527 May 1997Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant.Boric Acid
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML17228B12631 March 1995Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan.Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
Scaffolding
ML17309A74730 September 1994Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2.
ML17228A88530 September 1994Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept
ML20138E14822 June 1993Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation ReptBoric Acid
Stroke time
Incorporated by reference
Power Operated Valves
Backfit
ML20105D08731 August 1992Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation StationProbabilistic Risk Assessment
ML17309A66530 November 1991Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1.Boric Acid
Shutdown Margin
Stroke time
Power-Operated Valves
Power Operated Valves
ML17223B32331 August 1991TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2).Anticipated operational occurrence
Safe Shutdown Earthquake
Earthquake
Fuel cladding
ML17308A50417 August 1990Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation.Safe Shutdown
Boric Acid
ML17308A48231 May 1989Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept
ML17222A74131 January 1989Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1.Hydrostatic
Incorporated by reference
Liquid penetrant
ML17223A13231 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2.Loop seal
Anticipated operational occurrence
Operating Basis Earthquake
Design basis earthquake
ML17223A12931 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1.Loop seal
Anticipated operational occurrence
Operating Basis Earthquake
Design basis earthquake
ML20244C29330 November 1988Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept
ML17308A44631 March 1988Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2.Tornado Missile
ML20196G29229 February 1988Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1Safe Shutdown Earthquake
Earthquake
ML17347A59331 July 1987Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept
ML17308A23930 June 1987Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept
ML17219A68730 June 1987Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept
ML20214R15331 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept
ML20215G27431 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML17308A28931 January 1987Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML17308A24231 May 1986Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2.Grab sample
ML17308A21530 April 1986First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation ReptHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20197C60230 April 1986Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3
ML17216A43313 January 1986SPDS Progress Review,St Lucie 1 & 2.Backfit
ML17301A18417 June 1985Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation ReptOperating Basis Earthquake
Finite Element Analysis
Tornado Generated Missile
ML17301A16728 February 1985Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2.Grab sample
ML20080E07113 January 1984Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation ReptBackfit
ML17301A06231 October 1983Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii).Safe Shutdown
Control of Heavy Loads
ML17214A69331 October 1983Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept
ML17214A20430 April 1983Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML17214A15829 April 1983Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML17214A15526 April 1983Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant.Boric Acid
Grab sample
Offsite Dose Calculation Manual
Process Control Program
Power change
ML17214A4542 March 1983Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML17301A01324 November 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20065U23531 October 1982Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML17301A00128 September 1982ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept
ML17213A73217 September 1982Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation ReptEarthquake
Backfit
ML20066B32331 August 1982Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim ReptAnchor Darling
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20062E20431 July 1982Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company)Ultimate heat sink
ML17212B78331 May 1982Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20052B53428 February 1982Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept