Application for Amend to License NPF-21,changing Tech Specs to Allow Operation of Plant Up to Power Level of 75% W/One Recirculation Loop Operating.Repts on Analyses of Single Loop Operation Also Encl.Fee Paid
ML17279A912
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/07/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17279A913 List:
References
GO2-88-053, GO2-88-53, TAC-67538, NUDOCS 8803300288
Download: ML17279A912 (7)


Text

AC CELEBRATED 'ISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8803300288 DOC.DATE: 88/03/07 NOTARIZED- YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) gw~ RqpLr

SUBJECT:

Application for amend to License NPF-21,changing Tech Specs re single loop operation.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ( ENCL ) SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 i SAMWORTH,R 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS7E4 1 1 NRR/DEST/CEB8H7 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB11F 1 1 S/ILRB12 1 1 OGC 15-B-18 1 0 RE 01 1 1 RES/DE/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 pl~

8 D

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 18

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 7, 1988 G02-88"053 Docket No. 50-397

,U. S. Nuclear. Regulatory Commission Attention: Document Control Desk Washington; DC 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF,-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS SINGLE-LOOP OPERATION In accordance with the Code of Federal Regulations, Title 10", Parts 50.90 and 2.101, the Supply System hereby requests an amendment to the HNP-2 Technical Specifications (Tech. Specs.). This amendment is being submitted to allow the operation of HNP-2 up to a power, level of 755 power, with one recirculation loop operating to the design burnup of the reload fuel of 35,000 MHD/MT bundle average. Changes to the following Tech. Specs. are being requested.

INDEX 2.2.1 Reactor, Protection System Instrumentation Setpoints 3/4.2.1 Average Planar Linear Heat Generation Rate 3/4.2.2 APRM Setpoints 3/4.2.3 Minimum Critical Power Ratio 3/4.2.6 Power/Flow Instability (New) 3/4.2.7 Neutron Flux Noise Monitoring (New) 3/4.3.6 Control Rod Block Instrumentation 3/4.3.10 Neutron Flux Monitoring Instrumentation (Delete) 3/4.4.1 Recirculation System B 3/4.2.1 Average Planar Linear Heat Generation Rate B 3/4.2.6 Power/Flow Instability (New)

B 3/4.2.7 Neutron Flux Noise Monitoring (New)

B 3/4.3.10 Neutron Flux Monitoring Instrumentation (Delete)

B 3/4.4.4.1 Recirculation System 8803300288 880307

., PDR ADOCK 05000397 DCD

i U. S. Nuclear Regulatory Commission Page Two REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS SINGLE-LOOP OPERATION The attachments to this letter include a summary of the Single-Loop Operation analyses, marked up Tech. Specs. and plant specific analysis documents and references, all of which provide the basis for the proposed no significant hazards determination.

I. Technical Specification Changes (including justification)

II. Single-Loop Operation Analysis (Summary)

III. WNP-2 LOCA Analysis for Single-Loop Operation (ANF-87-118)

IV. WNP-2 Transient Analysis for Single-Loop Operation (ANF-87-119),

as appended by letter ANF WP-88-0020, dated February 22, 1988.

The requested amendment has been evaluated in accordance with 10CFR50.59 and determined that ther e are no unreviewed safety questions.

The Supply System has reviewed this change per 10CFR50.92 and determined that it does not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated because an analysis has been performed for the pr oposed method of operation, and the analysis demonstrates no significant change in previously evaluated accidents.
2) Create the possibility of a new or different kind of accident from any previously evaluated because the operational limitations applied to the nuclear plant have not changed. The values were derived from NRC qualified computer codes and by applying the most limiting transients throughout the cycle. These limitations are sufficient to ensure the plant is operated within previously accepted conditions.
3) Create a significant reduction in the margin of safety because the margin to safety is either identical or more conservative than that now used for the plant.

U. S. Nuclear Regulatory Commission Page Three RE()UEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS SINGLE-LOOP OPERATION As discussed above, the Supply System considers that this change does not involve a significant hazards consideration, nor is there a potential for significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does it involve a significant increase in individual or cummulative occupational radiation exposure.

Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9) and therefore, per 10CFR 51.22(b), an environmental assessment of the change is not required.

This Technical Specification change has been reviewed and approved by the WNP-2 Plant Operations Committee (POC) and the Supply System Corporate Nuclear Safety Review Board (CNSRB).

In accordance with 10CFR170.21, an application fee of One hundred fifty dollars ($ 150.00) accompanies this request. In accordance with 10CFR50.91, the State of Washington has been provided a copy of this letter, Should you have any questions. please contact Manager, WNP-2 Licensing.

Very truly yours, G.~ C.~ Sorensen, Manager Regulatory Programs PLP/bk Attachments cc: C Eschels EFSEC JB Martin - NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A

STATE OF WASHINGTON )

Subject:

Amen TS - Sin le-Loo 0 eration

)

COUNTY OF BENTON )

I, R. B. GLASSCOCK, being duly sworn, subscribe to and say that I am the Director, Licensing and Assurance, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE 1988 R. B. GLASSCOCK, Director Licensing and Assurance On this day personally appeared before me R. B. GLASSCOCK to me known to be the

~

individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under fny hand and seal this day of fU ,1988.

No ary Public in and or the State of Washington Residing at

.I f

4

(