ML17279A913

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-21,changing Tech Specs to Allow Operation of Plant Up to Power Level of 75% W/One Recirculation Loop Operating.Repts on Analyses of Single Loop Operation Also Encl.Fee Paid
Date released: 06/27/2018 Download: ML17279A913


Proposed Tech Specs Re single-loop Operation
ML17279A919
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/07/1988
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17279A919 (69)
Washington Nuclear Plant 2 Single-Loop Operation Summary Rept.
ML17279A918
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/29/1988
From: Humphreys M, Talbert J, Wolkenhauer W
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17279A918 (32)
Washington Nuclear Plant 2 LOCA Analysis for Single-Loop Operation.
ML17279A917
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1988
From: Krajicek J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
References
Download: ML17279A917 (70)
Washington Nuclear Plant 2 Single-Loop Operation Analysis.
ML17279A916
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1987
From: Krajicek J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
References
Download: ML17279A916 (35)
Application for Amend to License NPF-21,changing Tech Specs to Allow Operation of Plant Up to Power Level of 75% W/One Recirculation Loop Operating.Repts on Analyses of Single Loop Operation Also Encl.Fee Paid
ML17279A912
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/07/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML17279A912 (7)