ML17279A550

From kanterella
Jump to navigation Jump to search

Proposed Tech Specs,Reflecting Change of Trip Setpoint for Item 1.d, Main Steam Line Tunnel Temp-High of Table 3.3.2-2, Isolation Actuation Instrumentation Setpoints. to Indicate Max Trip Setpoint Value
ML17279A550
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/01/1987
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17279A549 List:
References
TAC-55579, TAC-66074, NUDOCS 8709100183
Download: ML17279A550 (2)


Text

TRIP FUNCTION TABLE 3.3.2-2 ISOLATION ACTUATIOH IHSTRUHEHTATION SETPOINTS TRIP SETPOINT ALLOWABLE VALUE 1.

PRIORY CONTAINMENT ISOLATION a.

b.

C.

Reactor Vessel Water Level-1)

Low, Level 3

2)

Low Low, Level 2

Drywell Pressure

- High Hain Steam Line 1)

Radiation - lligh 2)

Pressure

- Low 3)

Flow - lligh d.

Hain Steam Line Tunnel Temperature - lligh e.

Hain Steam Line Tunnel h Temperature - High f.

, Condenser Vacuum - Low a.

Reactor Building Vent Exhaust Plenum Radiation - High Orywell Pressure

- High Reactor.Vessel Water Level - Low Low, Level 2

d.'anual Initiation b.

C.

g.

Hanual Initiation 2.

SECOHOARY COHTAINNENT ISOLATION

> 13.0 inches*

> -50 inches"

< 1.68 psig

< 3.0 x full power background

> 831 psig

< 105 5 psid

~50~

<BOF

> 23 inches llg absolute pressure H.A.

< 13.0 mR/h

< 1.68 psig

> "50 inches*

N.A.

> 11.0 inches

> -57 inches

< 1.88 psig

< 3.6 x full power background

> 811 psig

< 108 psid

< 170 F

<90F

> 24.5 inches Hg absolute pressure H.A.

< 16.0 mR/h

< 1.88 psig

> -57 inches N.A.

~

~

4

~

~ ~

CCl tl LO C".

CA tel

'l