LER 78-034/03L-0 and LER 78-038/03L-0 for Dresden, Unit 2 Re Main Steam Line Temperature Isolation Switch 2-261-1BA Initiated a Group I Isolation Signal on Channel a
ML17252B499
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/01/1978
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
NRC/RGN-III
References
BBS LTR 78-1132 LER 78-034/03L-0, LER 78-038/03L-0
Download: ML17252B499 (3)


Text

.. ~ *- **...

r!'r**

..~* ~'!,

,9 Commonwe~Edison Dresden Nuclea;wer Station R.R. #1 Morris, Illinois 60450 Telephone 815/942-2920

  • 1 r .

I f :)  !  !

r *1 ~~..
  • _.. ; 1*~ :

August 1, 1978 .' ._ t .'-'I .::~1..::

c.i:-:-J f~~:~;%I  ;~~-:z0 c~*;J

J BBS Ltr. //78-11'32 .
:c-;;

c;*

James G. Keppler, Regional Director Director of Regulatory Operations - Region III U.S. Nucle~r: Regulatory Cormnission 799 Roosevelt Road Glen Eilyn, IL 60137

.occurrence Reports #78-034/03L-0 and 78-038/03L-0, Docket ere or.iginally evaluated as reguiring submittal to your office ccordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2.(b), conditions leading to operation in a degraded mode permitted by a limiting condition for operation or pla~t shutdown required by a limiting condit*ion for op.e:i;::attd:o.n. After further discussion on July 21, 1978, with our Region III NRC inspect6'I!r,,":t:fr. J. Barker, the events have been reclass:i,fied as non-repor.trable because no limiting. condition for ope~ation was approached and the instrument switch failures were conservative.

We request that the reports previously mentioned be J:"emoved from the Licensee Event Report File. Copies of the reports are attached.

ens on Station Sup~rintendent Dresden Nuclear Power Station

~

BBS/deb Enclosure cc: Director of Inspection & Enforcement Director of Management Information & Program Control File/NRC 71978

NRC FORM 366 u. s. NucLeAit R~GuLA'roilv~tsii.~1Jn!;~10~

17-771

  • *l
  • .LICENSEE EVENT REPORT *

-~

CONTROL BLOCK:

~-'-~-'--'-~~--'~~6\..:.)

!  ! f"0 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI C£:I~J I r I L I nl RI sl 2101 ol ol-:-1 ol ol ol ol ol -I ol olG)I 4l 1j 1l 1I 1101 I 10 7 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T

.CIT!]  :~~~~~ UJ© I o I s I o I o I 0I 21 3 I 1 101 o I s I 2 I 8 I 71 8 *01 o ' 6 I 2 I 2 I 1 I 8 IG) 7 8 60

  • 61 DOCKET NUMBER 68 69 EVENT DATE  ;, 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

. @TI] 2-261-18A initiated a Group I Isolation signal on Channel "A". Plant operation conti11ued

[ill] as permitted by .-Technical Specification 3. 2.A. This type of event* last occurred on

[ill] 9/08/77 report number 77-034. Plant safety:was not degraded because the switch failu~e

[ill] was in t*he conservative direction.

[9TI

.[QJ]J 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUB CODE SUBCODE

[ill] I s1 nl@ ~@ UJ@ , r, w1 s 1T1R1 u 1e ~@ UJ@

7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION

,,.-:;., LER'RO LVENT YE.II.A REPORT NO. * :, CODE TYPE NO.

~ REPORT NUMBER I7I8I I 1* Io I 3 I 41 1.....-1* I 01 31 LlJ L2J 21 22 23 24 26 27 28 . 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN (':;:;\ ATTACHMENT NPRD-4 PRIME COMP. COMPONENT TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED FORM :;us. SUPPLIER .MANUFACTURER W@W@)

33 34 W@

35 .

w 36 10101010 37 40 I *L!J@

41 W

42 Ll!J@

43 I u Io I 1 ls J@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

I Control room instrumentation indicated no abnormal temperature existed in the MSL Tunnel area. A visual inspection revealed no steam leaks and that the area coolers we~e functioning properly. The 2~261-18A switch, which is (1) of (16) installed SW. 's, was!

[JJJ::l jumpered to clear* the isolation signal and will* be calibrated at the earliest possible rr:m 7 8 9 date.

80 FACILITY METHOD OF ~

STATUS  % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION ~

[2E] UJ@ I 0 I 8 I 1 l@).._I-"'N=-A_ _ _ __. Lb.JG2)1 Operational Event s 9 10. 12 n 44 45 46 80 ACTIVITY CONTENT r:;;;..

RELEASED OF RELEASE AMOUNT OF ~CTIVITY LOCATION OF RELEASE @

  • Gill 7 8 LLI@

9 w@L...'_...:..NA~--------1 10 11 44 45 NA 80 PERSONNEL EXPOSURES . r:;;:;.,

NUMBER TYPE

  • DESCRIPT;ON 8?J 7 8 I9 HOI 0I QJ@UJ@I.....- - - - - - N = A " - - - - - - - - - - - - - - - - - - - - - -*so' 11 12 13 PERSONNEL INJURIES (;;"";\

NUMBER . DESCRIPTION~

~1 8 9 lo lo lo l@).__~~~~~---'N=A"--~~~~~~-~~~~~-~------

. 11 12 . 80 LOSS OF OR DAMAGE TO FACILITY f4J°'

TYPE DESCRIPTION ~

.ITEJ

  • s l!_J@

9 . ~lo~~~~~~~~~~~~~=-='--~~~~~~~~'--~~~~~~~~~~~~~~~~~~~-iso NA PUBLICITY C\ NRC USE ONLY iSSUEDQ DESCRIPTION~ oO

~8 LlLJ6* 9 ~10~~~~~~~~~~~~~"'"-~~~~ II 11111111111~

68 69 80*;

NAMEOFPREPARER~~~~_....Du*--=S~a~n~t~a~n:.:.:..:n=a'--~~~~~~~ PHONE: 421 ~

,,/

~

I ATTACHMENT TO LICENSEE EVENT REPORT 78-034/031-0 COMMONWEALTH EDISON COMPANY (CWE)

DRESDEN UNIT-2 (ILDRS-2)

DOCKET II 050-237 During normal plant operation the Main Steam Line (MSL) Tunnel high temperature alarm annunciated in the control room and a half Group I Isolation resulted (Channel A). Control room instrumentation indicated that the MSL Tunnel area temperature was normal (approximately 1250F).

A visual inspection of the MSL Tunnel area revealed no steam leaks which would cause the temperature to reach the 180°F high temperature

  • alarm or exceed the Technical Specification Limit (Table 3.2.1) of 200°F.

The MSL Tunnel area coolers were als.o functioning normally. A MSL Tunnel area temperature switch 2-261-18A was jumpered in order to remove the half Group I Isolation. The te.mperature switch is a United Electric coil bulb type F7 Model 76B. Work request was initiated to calibrate' the temperature switch at the earliest possible date. There is no degradation of plant saf~ty since the remaining redundant switches were operable in Channel "A" to perform the Group I Isolation function as required by the Technical Specifications.