ML17214A682

From kanterella
Jump to navigation Jump to search
Rev 25 to Emergency Plan Implementing Procedure 3100023E, Onsite Emergency Organization & Roster.
ML17214A682
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/09/1984
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17214A680 List:
References
3100023E, NUDOCS 8402070385
Download: ML17214A682 (23)


Text

Page 1 of 15 FLORIDA POWER & LIGHT COMPANY ST ~ LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO ~ 3100023E REVISION 25

1.0 TITLE

ON-SITE EMERGENCY ORGANIZATION AND ROSTER 2 ' REVIEW AND APPROVAL:

Reviewed by Facility Review Croup July 25 1975 Approved by K. N. Harris Plant Manager Jul 29, 1975 Revision 25 iewed by FRG

'3 8 xc6w y z lqR3 Approved by Vice-Pres. Nuc. Eng. 19+

3.0 SCOPE

3.1 Purpose This procedure describes the members and duties of the On-Site Emergency Organization (see Figure 1).

I 3.2 Discussion During the period immediately following the declaration of an emergency, the shift operating staff constitutes the immediate response organization, i.e., the Interim Emergency Teams. Emergency requirements take immediate precedence over normal operating responsibilities (as determined by Emergency Procedures or at the direction of the Emergency Coordinator). Subsequent to the immediate response actions and notifications, off-duty plant staff will begin arriving to form the Primary Emergency Teams and to staff the On-Site Support Centers. The On-Site Emergency Organization reports to and supports the Emergency Coordinator.

3.3 ~Authorit This procedure implements the St. Lucie Plant Radiological Emergency Plan.

8402070385 840202 PDR ADOCX OS000SS5 PDR I,'

I

Page 2 of 15 ST ~ LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 EMERGENCY ROSTER I

3.0 SCOPE

(continued) 3.4 Definitions 3.4.1 Emergenc Coordinator Responsible for notifying off-site authorities, both inside and outside the Company, and has full authority and responsibility for on-site emergency response actions. This function is performed by the, Nuclear Plant Supervisor. His alternate is the Assistant Nuclear Plant Supervisor. At the discretion of high level plant management, the Plant Manager, Operations Superintendent, Operations Supervisor, or an offMuty NPS can carry out this function following a proper turnover. /R25 3.4.2 Interim Emer ency Teams The Interim Emergency Teams are composed of members chosen from plant shift personnel. All are qualified in procedures and practices required for the performances of their duties as team leaders or members.

3.4.3 Prima Emer ency Teams The Primary Emergency Teams are composed of first line management personnel and others who normally work a regular Monday through Friday day shift schedule.

3.4.4 Technical Support Center Supervisor The person who supervises the personnel and manages the technical support activities in the Technical Support Center. This function is performed by one of the following:

Primary: Technical Supervisor Alternates Off&uty Shift Technical Advisors 3.4.5 Operations Duty Call Supervisor An on-call supervisor assigned on a rotating basis from the plant management staff with responsibility for assisting the Emergency Coordinator in notifying off-duty plant staff and the company 's off>>site emergency organization in the event of an emergency.

3.4e6 Operations Su port Center Supervisor The person who supervises tbe personnel and manages the maintenance and operations support activities from the Operations Support Center. This function is performed by one of the following:

Primary: Assistant Superintendent-Mechanical-Nuclear Alternates: Mechanical Maintenance Supervisors

Page 3 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023K, REVISION 25 EMERGENCY ROSTER 4 ' PRECAUTIONS:

4.1 The Interim Teams should take action regardless of the fact that the Primary Emergency Team members may be present.

Members of an Interim Emergency Team may consider themselves relieved ~onl upon the specific instructions of a recognized superior or the Primary Emergency Team Leader. Merely knowing that a superior or a Primary Fmergency Team Leader is present does not constitute a release from emergency duties and responsibilities.

4.2 At their own option, and with the concurrence of the Emergency Coordinator, Primary Emergency Team Leader of that team may relieve their counterpart on the Interim Emergency Teams.

5 ' RESPONSIBILITIES:

5.1 Emer enc Direction and Control The Emergency Coordinator shall be responsible for direction and control, as described in E-Plan Implementing Procedure 310002j,E, Duties of Emergency Coordinator.

5.2 Notification and Communication The Emergency Coordinator shall be responsible for notification and communications as described in E-Plan Implementing Procedure 3100021E, Duties of Emergency Coordinator. The Duty Call Supervisor shall be responsible for initial notification assistance. When the TSC is declared activated, notification communications may be delegated to the TSC. /R25 5.3 Radiation Team The Health Physics Supervisor shall be the Primary Radiation Team Leader. He shall direct the actions of the Health Physics technicians under the orders of the Emergency Coordinator. The Senior Health Physics representative on site is designated as the Interim Radiation Team Leader. /R25 5.4 Plant S stem Engineerin The Shift Technical Advisor shall provide the initial technical support necessary for repair or corrective action and shall be primarily responsible for accident assessment.

5.5 Fire Team The Watch Engineer is the, Fire Team Leader. This position is manned continuously, but, if he is not available, the Turbine Operator acts Pierce Fire District as his alternate. The St. Lucie County Ft.

may respond to fires on-site, if requested. /R25

Page 4 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 EMERGENCY ROSTER

5.0 RESPONSIBILITIES

(continued) 5.6 First Aid/Decontamination Team The Chemistry Supervisor shall be the Primary= Team Leader with a Chemistry Technician as his alternate. A Nuclear Operator, trained in first aid and personnel decontamination, shall be the Interim Team Leader. If no Chemistry Department personnel are onmite, any trained employee could act as a First Aid/Decontamination Team member until primary team members can be called in.

The Plant Security Supervisor shall be the Primary Security Team Leader with the Security Force Shift Supervisor as his alternate.

The Security Force Shift Supervisor shall act as the Interim Security Team Leader. Personnel control and accountability are the responsibility of the Security Team. The Security Team Leader shall be responsible for notifying the Emergency Coordinator of unaccounted for personnel. Notification of occupants in the Owner Controlled Area shall take place during the security search.

I 5.8 Rescue 0 erations Rescue Operations shall involve the First Aid/Decontamination Team and the Radiation Team as necessary. Under the control of the Radiation Team Leader, entry to potentially hazardous areas shall be made by the First Aid/Decont'amination Team with assistance from the Radiation Team. Upon notification of the injury, both teams shall respond per the Emergency Coordinator's instructions.

Re-entry teams shall be formed as necessary in accordance with E-Plan Implementing Procedure 3100027E, Re-Entry.

5.10 Recove and Restoration Team Recovery and Restoration Operations shall involve all emergency teams as necessary. Team members shall be assigned from available plant staff.

5.11 Technical Su port Center Staff The TSC shall be used to provide plant management and technical support to plant operations personnel during emergency conditions.

A primary task shall be to relieve the Emergency Coordinator of off-site communications to the state and local agencies, NRC and the FPL Off-Site Emergency Organization. The TSC staff shall provide technical support as requested by the Emergency Coordinator and shall direct itself toward determining current and projected plant status and providing inMepth diagnostic and engineering assistance, as required.

1 I

Page 5 of 15 ST ~ LUCIE PLANT

'-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 EMERGENCY ROSTER

5.0 RESPONSIBILITIES

(continued )

5.12 Operations Su port Center Staff The OSC will be the reporting area (Maintenance Office in Service Building) and activity control/management location for available/called-in operators, Maintenance personnel, HP personnel, Chemistry personnel and other plant support personnel as needed and available. Their activities will be supervised by the OSC Supervisor and requested by the Emergency Coordinator and TSC Supervisor. The Special Crew Supervisor (backshift hours) when on site will be the interim OSC Supervisor. /R25 5.13 Emer enc Roster The OC Supervisor shall be responsible to insure the quarterly verification and updating of the Emergency Roster. Personnel on the Roster shall notify the OC Supervisor when a change pertinent to information appearing on the roster occurs. Changes to names and phone numbers in Appendices A-F may be approved by the Plant Manager (approval of Vice-President of Nuclear Energy not required). /R25 6 '

REFERENCES:

6.1 St. Lucie Plant Radiological Emergency Plan 6.2 E-Plan Implementing Procedure 3100021E, Duties of the Emergency Coordinator 6.3 E-Plan Implementing Procedure 3100027E, Re-Entry 6.4 HP-200 Health Physics Emergency Organization 6.5 HP-203 Personnel Access Control During Emergencies 7+0 RECORDS:

The Emergency Coordinator shall maintain records as described. in E-Plan Implementing Procedure 3100021E, Duties of the Emergency Coordinator.

Page 6 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 EMERGENCY ROSTER 8 ' INSTRUCTIONS:

8.1 Upon declaration of an emergency, the Interim Team Leaders shall contact the Emergency Coordinator to determine the immediate response teams needed.

8.2 The Emergency Coordinator shall notify'the Duty Call Supervisor to inform necessary plant management and Primary Team Leaders to report to the Technical Support Center for assignment, if necessary.

8.3 The Technical Support Center Supervisor shall assist the Emergency Coordinator in assigning personnel to the Technical Support Center or the Operations Support Center.

8.4 Department heads or their designated alternates shall report to'the Technical Support Center where they shall, if necessary, relieve the Interim Leaders, and assume their responsibilities as Primary Team Team Leaders; or staff the Technical Support Center as directed by the Emergency Coordinator.

8.5 Appendix A is the Call List to assist the Emergency Coordinator in initial notifications.

8.6 Appendix 8 is the Operations Duty Call Supervisor's Call List. The Duty Call Supervisor should contact appropriate people when directed by the Emergency Coordinator to do so. l /R25 8.7 Appendix C is the Plant Management Call List. The list is to assist the Plant Management in their notifications.

8.8 Appendix D is the Technical Department Call List to assist in notifying members of the Technical Support Center.

I 8.9 Appendix E is the Maintenance Duty Call Supervisors Call List to assist in notifying members of the Operations Support Center.

8.10 Appendix F is a listing of the phone numbers for the Emergency Response Facilities.

O.

Page 7 of 15 ST ~ LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO ~ 3100023E, REVISION 25 EMERGENCY ROSTER Emergency Coordinator Nuclear Plant Supervisor (Watch Engineer)

Interim (Shift Primary Emergency Team) EMERGENCY TEAMS Emergency Team Health Physics Health Physics Representative RADIATION, Supervisor (Health Physics /R25 Technician)

Watch Engineer Watch Engineer /R25 (Nuclear Turbine Operator) FIRE (Nuclear Turbine Operator)

Nuclear Operator FIRST AID 6 (Auxiliary Equip. PERSONNEL Chemistry Supervisor Operator) DECONTAMINATION (Chemistry Technician)

Security Force Plant Security Supervisor Shif t Supervisor (Assistant Plant Security (Response Team Leader) SECURITY Supervisor)

Member of the Outage Management Security Force ASSEMBLY AREA Supervisor SUPERVISOR RECOVERY AND All Teams and RESTORATION FPL Resources RE-ENTRY 'TEAMS (FORMED AS REOUIRED DURING EMERGENCY)

Shift Technical Advisor TECHNICAL SUPPORT Technical Supervisor (Off duty STA)

Special Crew Supervisor OPERATIONS SUPPORT Asst. Supt. Mechnical (when on site) (Staff Supervisors)

FIGURE 1

I I I II I

I '

I I

I I

~ I

~ I

~ ' '

I ~ I

Page 9 of 15 P

ST ~ LUCIE PLANT F-PLAN' fPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 EMERGENCY ROSTER EMERGENCY ROSTER APPENDIX A EMERGENCY COORDINATORS CALL LIST Bureau of Emergency Management (BEM) Operations DCS Red Phone Dial 2: (Check with Duty Schedule)

Alt. 1 NAWAS Alt. 2 Phone BEM 1-904-488-1320 Alt. 3 Phone Flc rida Marine Patrol 1-904-48n-5757 State of Florida, K,S Office of Radiation Control 1-299W580 24 ).ours Beeper 537 Fire Rescue 911 4 FPL Management Phones (REGS)

Lawnwood Hospital Reef NRC ENS Al't. 1 1-202-95 .&550 Alt. 2 1-301-42'-4056 Alt. 3 1-301-492-7000 System Operations Power Coordinator, State Hot Ring Down State Warning Point Office of Radiation Control PSL P1 CR/TSC PSL P2 CR PSL EOF St. Lucie County EOC Martin County EOC South Florida EOC All Stations

/R25

Page 10 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO ~ 3100023E, REVISION 25 EMERGENCY ROSTER EMERGENCY ROSTER APPENDIX B OPERATIONS DCS CALL LIST TITIZ NAME HOME OFFICE Plant Management Plant Manager Alt. OPRNS Superintendent Alt . OPRNS Supervisor Health Physics DCS (Check DCS Schedule List)

Radiation Team Leader (RTL)

H.P. Supervisor Alt. RTL Alt. RTL Alt. RTL Emergency Control Officer Alt. 1 Alt. 2 Alt. 3 Nuclear Energy Duty Officer Check Duty Schedule Roster Alt. 4 Systems Operations Power Coordinator Tech Department Supervisor (TSC Supervisor)

Alt.

Alt.

Alt.

Securi ty Alt. 1 Alt. 2

0 Page' l of 15 ST ~ LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 El6'RGENCY ROSTER "

APPENDIX B OPERATIONS DCS CALL LIST (Continued NAME HOME OFFICE Maintenance DCS (Check Duty Schedule Roster)

Miscellaneous Off-Site Agencies OF FICE EMERGENCY Law Enforcement St. Lucie County Sheriff 461-7300 911 St. Lucie Civil Defense 461-5201 . 911 Via States Red Phone Dial 26 Martin County Sheriff 77-283-1300 77-911 Martin County Civil Defense 77-287-1652 77-911 Via States Red Phone Dial 27 FBI Local 461-6142 Same Miami 1-573-3333 Same Explosive Ordinance Disposal 66th Ordinance Det., Patrick AFB 1-853-9951 Same NRC Resident Inspectors SITE OFFICE HOME C. Peierabend 3410 464-7822 N/A /R25 H. Bibb 3411 464-7822 878-7356 PSL ¹1 CR Plant PSL ¹2 CR Ebasco, PSL ¹2

Page  ! of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REVISION 25 EMERGENCY ROSTER EMERGENCY ROSTER APPENDIX C PLANT MANAGEMENT CALL LIST TITLE NAME HOMF. OFFICE Plant Manager OPRN Superintendent OPRN Supervisor Training Department EOF Preparation Alt.

Al t.

Assembly Area Supervisor Alt.

Additional NPS

Page 13 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E REVISION 25 EMERGENCY ROSTER EMERGENCY ROSTER APPENDIX D TECHNICAL DEPARTMENT CALL LIS".

TITIZ NAME HOME OFFICE Maintenance Supt.

Tech Department Rep.

Radio Chemistry First Aid/Decon Team Chemistry Supvr.

Alt. 1 Alt. 2 QC Department OC Supervisor Alt. 1 Alt. 2 Reactor Engineering Reactor Engr. Supvr.

Alt. 1 Alt. 2 Alt. 3

Page 14 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO, 3100023E, REVISION 25 EMERGENCY ROSTER EMERGENCY ROSTER APPENDIX E MAIN'"ENANCE DCS CALL LIST TITLE NAME HOME WORK OSC Supvr.

Alt. 1 Alt. 2 Mechanical Maintenance Rep.

Electrical Maintenance Rep.

I & C Department Rep.

Fire Protection Coordinator

Page 15 of 15 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO 3100023K, REVISION 25 EMERGENCY ROSTER APPENDIX F PHONE LIST OF'MERGENCY RESPONSE FACILITIES CONTROL, ROOMS

  • Unit 1
  • Unit 2 Plant . 'lant .

FPL Management (REGS) FPL Management (REGS) P not available State Hot Ring State Hot Ring TECH SUPPORT CENTER TSC Main Room FPL Management (REGS)

State Hot Ring Plant

  • TSC - Off Site Dose Calc, RTL, CTL Plant Omnifax (facsimile)

TSC - NRC Office OPERATIONS SUPPORT CFNTER Plant EMERGENCY OPERATIONS FACILITY Commercial Phone f's the NN for some of "he EOF groups are:

Switch Board Emergency Control Officer Recovery Manager Emergency Technical Manager Dose Assessment Health Physics FPL Management (RECS) , Recovery Manager

, Emergency Control Officer Bull Pen, Status Boards State Hot Ring

  • These areas also have Company Radio and Local Government Radio (LGR).

/R25

<i l'