Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-17-079 June 12, 2017 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Corrected Pages for the Final Environmental Assessment and Finding of No Significant Impact
References:
- 1. Letter from TVA to NRC, CNL-15-169, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)," dated September 21, 2015 (ML15282A152)
- 2. Letter from TVA to NRC, CNL-17-017, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects," dated February 3, 2017 (ML17034A562)
- 3. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3 -
Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate (CAC NOS. MF6741, MF6742, AND MF6743)," dated May 22, 2017 (ML17062A383)
By the Reference 1 letter, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed
U.S. Nuclear Regulatory Commission CNL-17-079 Page 2 June 12, 2017 thermal power of 3458 megawatts to 3952 megawatts. In Reference 2, TVA provided a supplement that incorporated the environmental aspects associated with some proposed EPU-related Transmission System updates. Enclosure 3 of Reference 2 provided markups of the draft Environmental Assessment and Finding of No Significant Impact to reflect the changes associated with the Reference 2 supplement. The Reference 3 letter provided the NRCs final Environmental Assessment and Finding of No Significant Impact related to the proposed BFN EPU.
During a review of the Reference 3 document, TVA noted that some of the markups from of Reference 2 were not fully captured in the Reference 3 final letter. TVA determined that the strike-through mark-ups from Enclosure 3 of Reference 2 were deleted during the PDF creation prior to transmittal and, therefore, on one page, some suggested deletions were left in the Reference 3 document. Additionally, on two pages, markup inserts were not incorporated. A TVA condition report has been created to document this error.
The enclosure to this letter provides the corrected markups to the Final Environmental Assessment and Finding of No Significant Impact to reflect the changes associated with the proposed EPU-related Transmission System update included in Reference 2.
TVA has reviewed the information supporting the environmental consideration provided to the NRC in the Reference 1 letter. The supplemental information in this submittal does not affect the bases for concluding that an environmental impact statement does not need to be prepared in connection with the proposed license amendment. Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter to the Alabama State Department of Public Health.
There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Mr. Edward D. Schrull at (423) 751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of June 2017.
Respectfully, Signing For:
J. W. Shea Vice President, Nuclear Licensing Enclosure cc: See Page 3
U.S. Nuclear Regulatory Commission CNL-17-079 Page 3 June 12, 2017
Enclosure:
Corrected Markup Pages to the Final Environmental Assessment and Finding of No Significant Impact cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health
ENCLOSURE Corrected Markup Pages to the Final Environmental Assessment and Finding of No Significant Impact
Plant Modifications and Upgrades An EPU usually requires significant modifications to major balance-of-plant equipment.
The proposed EPU for BFN would require the modifications described in Attachment 47 to the licensee's application entitled "List and Status of Plant Modifications, Revision 1" (TVA 2017d),
which include replacement of the steam dryers, replacement of the high pressure turbine rotors, replacement of reactor feedwater pumps, installation of higher capacity condensate booster pumps and motors, modifications to the condensate demineralizer system, modifications to the feedwater heaters, and upgrade of miscellaneous instrumentation, setpoint changes, and software modifications.
All onsite modifications associated with the proposed action would be within the existing structures, buildings, and fenced equipment yards. All deliveries of materials to support EPU-related modifications and upgrades would be by truck, and equipment and materials would be temporarily stored in existing storage buildings and laydown areas. TVA anticipates no changes in existing onsite land uses or disturbance of previously undisturbed onsite land (TVA 2017a).
According to TVA's current schedule, modifications and upgrades related to the proposed EPU would be completed at Unit 1 during the fall 2018 refueling outage, at Unit 2 during the spring 2019 outage, and at Unit 3 during the spring 2018 outage. If the NRC approves the proposed EPU, TVA would begin operating each unit at the uprated power level following these outages.
Cooling Tower Operation and Thermal Discharge Operating BFN at the EPU power level of 3,952 MWt per unit would increase the steam flow to the plant's steam turbines, which would in turn increase the amount of waste heat that must be dissipated. TVA would increase its use of the cooling towers (i.e., operate in helper mode) to dissipate some of this additional heat; the remaining heat would be discharged to Wheeler Reservoir. If helper mode operation were to be insufficient to keep the reservoir 11 modifications to the main generator excitation system,
Springs Substation expansion. For the Corinth Substation expansion, TVA would purchase 3.5 ac {1.4 ha) of land and disturb 3 ac {1.2 ha) of land. TVA would complete the SVC and capacitor bank installations by spring 2020, although TVA's transmission system operator does not preclude BFN from operating at EPU levels during the capacitor bank installations (TVA 2017a, 2017c, 2017d, 2017e).
BFN Main Generator Excitation System Modifications TV A would modify the BFN main generator Alterrex excitation system for all three units with a bus-fed static excitation system consisting of a 3-phase power potential transformer, an automatic voltage regulator, and a power section. Physical work to complete these modifications would be performed within existing BFN structures and would not involve any previously undisturbed land. TVA is in the preliminary phase of the design change notice development for these modifications; therefore, TVA has not yet developed a specific timeline for implementation of the main generator excitation system modifications. However, TVA projects that these upgrades would be completed by 2020 {Unit 1 ), 2021 {Unit 2), and 2020 (Unit 3) (TVA 2017c, 2017d).
The Need for the Proposed Action As stated by the licensee in its application, the proposed action would allow TVA to meet the increasing power demand forecasted in TVA service area. TVA estimates that energy consumption in this area will increase at a compound annual growth rate of 1.2 percent until 2020 with additional moderate growth continuing after 2020.
Environmental Impacts of the Proposed Action This section addresses the radiological and non-radiological impacts of the proposed EPU. Separate from this EA, the NRC staff is evaluating the potential radiological 14
and sound attenuators, are incorporated as required to meet the guidelines. In the event that TVA (2016a) finds that the resulting noise levels exceed the FICON guidelines, TVA would develop and implement additional acoustical mitigation, such as modifications to fans and motors or the installation of barriers. TVA will also continue to comply with Occupational Safety and Health Administration (OSHA) regulations to protect worker health onsite.
The NRC staff concludes that the implementation of EPU modifications and upgrades, the capacitor bank installations, and additional operation of the cooling towers following implementation of the EPU would not result in significant noise impacts. Additionally, TVA would continue to comply with FICON guidelines and OSHA regulations regarding noise impacts, which would further ensure that future cooling tower operation would not result in significant impacts on the acoustic environment and human health.
Water Resources Impacts As previously described, EPU-related modifications at BFN to include replacement and upgrades of plant equipment would occur within existing structures, buildings, and fenced equipment yards. TVA does not expect any impact on previously undisturbed land at the BFN site. Any ground-disturbing activity would be subject to BFN's BMP Plan, which TVA must maintain as a condition of the BFN NPDES permit (ADEM 2012). TVA must implement and maintain the BMP Plan to prevent or minimize the potential for the release of pollutants in site runoff, spills, and leaks to waters of the State from site activities and operational areas.
Consequently, the NRC staff concludes that onsite EPU activities at BFN would have no significant effect on surface water runoff and no impact on surface water or groundwater quality.
Implementation of the EPU would also require upgrades to TVA's transmission system, including installation of a minimum of 764 MVAR reactive compensation, consisting of an SVC installation and four capacitor bank installations at five sites throughout TVA service area (see "MVAR Reactive Compensation" under "Description of the Proposed Action"). At two of the 28 SVC and