IR 05000397/2016006

From kanterella
(Redirected from ML17059D545)
Jump to navigation Jump to search
Annual Assessment Letter for Columbia Generating Station (Report 05000397/2016006)
ML17059D545
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/01/2017
From: Jeremy Groom
NRC/RGN-IV/DRP/RPB-A
To: Reddemann M
Energy Northwest
JEREMY GROOM
References
IR 2016006
Download: ML17059D545 (5)


Text

rch 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016006)

Dear Mr. Reddemann:

On February 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Columbia Generating Station, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

M. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/

Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos. 05000397 License Nos. NPF-21 Enclosure:

Columbia Generating Station Inspection/

Activity Plan

ML17059D545 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS DD:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE /RA/ /RA JClark /RA/ /RA/

for/

DATE 02/16/2017 2/23/17 2/27/17 2/13/17

Page 1 of 2 Columbia Generating Stati 02/23/2017 11:42:39 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL EXAM 4 2 01/23/2017 01/27/2017 X02586 INITIAL EXAM CGS (02/2017)

2 02/27/2017 03/09/2017 X02586 INITIAL EXAM CGS (02/2017)

SITSCRAM - SPECIAL INSP - SCRAM W/ COMPLICATIONS 2 2 01/08/2017 06/10/2017 IP 93812 Special Inspection EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 2 01/30/2017 02/03/2017 IP 7111402 Alert and Notification System Testing 2 01/30/2017 02/03/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 01/30/2017 02/03/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 01/30/2017 02/03/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION 1 2 01/30/2017 02/03/2017 IP 71151-EP01 Drill/Exercise Performance 2 01/30/2017 02/03/2017 IP 71151-EP02 ERO Readiness 2 01/30/2017 02/03/2017 IP 71151-EP03 Alert & Notification System Reliability TSB 52B - BIENNIAL PI&R 5 2 02/13/2017 02/17/2017 IP 71152B Problem Identification and Resolution 2 02/27/2017 03/03/2017 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION 1 2 05/22/2017 05/26/2017 IP 7111108G Inservice Inspection Activities - BWR RS 12 PI - RADIATION SAFETY 2 2 05/22/2017 05/26/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 05/22/2017 05/26/2017 IP 71124.02 Occupational ALARA Planning and Controls 2 05/22/2017 05/26/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 2 05/22/2017 05/26/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 5678 - RS TEAM 4 2 09/11/2017 09/15/2017 IP 71124.05 Radiation Monitoring Instrumentation 2 09/11/2017 09/15/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 09/11/2017 09/15/2017 IP 71124.07 Radiological Environmental Monitoring Program 2 09/11/2017 09/15/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-17T - CGS 50.59 EVALUATIONS OF CHANGES, TEST, 3 2 10/02/2017 10/06/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 2 04/09/2018 04/13/2018 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Columbia Generating Stati 02/23/2017 11:42:39 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 2 04/23/2018 04/27/2018 IP 7111105T Fire Protection [Triennial]

EP-1 - EP EXERCISE INSPECTION 4 2 03/26/2018 03/30/2018 IP 7111401 Exercise Evaluation 2 03/26/2018 03/30/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes EP-3 - EP PERFORMANCE INDICATORS 1 2 03/26/2018 03/30/2018 IP 71151-EP01 Drill/Exercise Performance 2 03/26/2018 03/30/2018 IP 71151-EP02 ERO Readiness 2 03/26/2018 03/30/2018 IP 71151-EP03 Alert & Notification System Reliability EB1-07T - CGS HEAT SINK PERFORMANCE 1 2 05/14/2018 05/18/2018 IP 7111107T Heat Sink Performance RS 24 - RAD SAFETY 2 2 05/21/2018 05/25/2018 IP 71124.02 Occupational ALARA Planning and Controls 2 05/21/2018 05/25/2018 IP 71124.04 Occupational Dose Assessment RS 13PI - RAD SAFETY 2 2 09/10/2018 09/14/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 09/10/2018 09/14/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 09/10/2018 09/14/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 2 09/10/2018 09/14/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences BRQ - BRQ INSPECTION 3 2 10/15/2018 12/31/2018 IP 7111111B Licensed Operator Requalification Program EB1-21N - CGS DESIGN BASES PROGRAMS INSPECTION 3 2 10/22/2018 11/09/2018 IP 7111121N Component Design Bases Inspection (Programs)

Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.