ATTACHMENT 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Hatter of PACIFIC GAS AND ELECTRIC CONPANY (Diablo Canyon Kuclear Power
- Plant, Un)ts 1 and 2)
Docket Kos. 50-275 50-323 tConstructkon Quality Assurance)
AFFIDAYIT OF RICHARD D.
ETZLER STATE OF CALIFORNIA COUNTY OF SAK LUIS OBISPO Ss.
I, Richard D. Etzler, being duly sworn, depose and say:
I am currently employed by Pac)fic Gas and Electric Company as F)eld Construct<on Manager at Diablo Canyon
$ n the General Construction Department.
//
I/
I/
//
//
//
//
ATTACHMENT l It is alleged that:
Two p5eces of wood were discovered in the 5ntake structure concrete wa11.
One piece of wood was removed and the hole grouted.
There are numerous deficient concrete pours at the 5ntake structure.
(Stokes ll/17/83 Aff. at 14.)
1.
On July 28, 1983, taro small pieces of wood were found enhedded 5n the concrete at the Intake Structure when Pullman was drilling holes for concrete anchor bolts for a pipe hanger on the center wall between the Auxiliary Saltwater Pumps.
The follow(ng steps were taken when the wood was discovered:
A PGandE Civil Engineering representative had the H. P. Foley Company chip out the wood and two small pieces of wood were removed from the area.
An area of 6 to 10 5nches 5n diameter was chipped out to a depth of less than 3 5nches.
Reinforcing steel was not exposed and the concrete was found to be sound.
Therefore, 5t was determined that repair of the area was of a cosmetic nature.
The concrete surface repairs were'erformed by H. P. Foley.
On December 1, 1983, a sample test program using a Schmidt Concrete Test Hanaer was performed.
The purpose of the test was to compare and verify the concrete strengths 5n areas around the above noted hanger and adjacent walls.
Results showed all concrete tested exceeded design strengths.
On December 5, 1983, a compar5son of the actual concrete strengths was perforaed using a Schmidt Concrete Test Hamner and a Fortney Test Machine.
A coepar5son of the test results 5ndicated that the Schmidt Test Haneer results were running approximately 11% low.
Therefore, the strength of the concrete tested at the Intake Struc..re on December 1, 1983, was greater than 5ndicated by the Sche5dt Test.
ATTACHMENT.1 I'.
The statement that 'there are numerous deffcfent concrete pour s at the Intake Structure'otally fs false.
The qualfty of the concrete ftself was assured by thorough testfng performed at the PGandE concrete testing
'I laboratory.
Iatchfng records and concrete test reports have been etfntafned.
Concrete afx pr opm tfons ~e approved by NandE's Department of Engfneerfng
- Research, and PGandE approval was requfred for all lfftdrawfngs and for all lffts prfor to concrete placement.
PGandE General Constructfon cfvf1 fnspectors observed all concrete placements providfng oversight and assurfng qualfty work.
DATED:
Harch 17, 1984 lc ard tz er Subscrfbed and sworn to before ee thfs 17th day of March, 1984 en y prou kotary Publfc n and for the County of San Lufs Obfspo, State of Calffornfa.
Q comtifssfon expfres June 30, 1986 OFF 1ClAL SEAL WENDY SPROUl o
~
NOEL~ KJSI C
<<~NOON%
QN LUlS OitPO COVNlY Nr~~ M X. lM
I
~
~
ATTACHMENT 2 DEVIATIONREPORT DIABLOCANYONSITE GUY F. ATKINSON COMPANY GFACo No.
42 Data 1>-2-70 ESCRIPTION OF DE VIATION Dn November 2, 1970, during. the second phase pour of Lift C-29 (195
- po - 8o)
A vibrator vas caught on the she-bolts, vas broken off and vas left in the pour.
- 1. Identification One vibrator (2" diameter),
Malan, + 4 Ft. of 2" airhose
- 2. Location Lift C29, 2nd phase, Beam Assembly 815, Approximately 15'rom top of beam 3, Materiai Source Diablo Canyon 1.Current Status Vibrator embedded in place CTION ANO/OR RESOLUTION:.
None required.
Vibrator embedded in the pour vill not affect the performance, reliability, or safety of the structure.
GFACo OA PGSE 0A
/Y /circ..
Date id H7o 9/2/69
L'
ATTACHMENT 3 DEVIATIONREPORT DIABLOCANYONSITE GUY F. ATKINSON COMPANY GFACo No.
pa 12-9-70 RIPTION OF DEVIATION On December 4, 1970, during the first phase pour of Lift C-29 (156
- 195 ) two vibrators were caught on the she-bolts.
hpproximately two hours were spent attempting
'to remove the vibrators from the forms.
Efforts to pull the vibrators free vere unsuccessful, snapping the air hose in each case.
G. Bischel and J.
- pope, pG&E inspectors, were witness to the above sequence of events.
- t. Identification
- 2. Location
- 3. Material Source
'wo vibrators (2" diameter),
balan, + 5 ft. of 2" air hose
~t Lift C-29,1st Phase, at 178 and 194, Approximately two feet from bottom of beams Diablo Canyon
- i. Current Status Vibrators embedded in place.
CTI N AND/OR RESOLUTION:.
None required.
The vibrators embedded in the pour will not affect the performance, reliability, or safety of the structure.
The vibrator fittings (oil pots) were relocated to minimire the possibility of a vibrator getting stuck again.
GFACo QA
@GEE QA g
~
IS'7o nate ~~
9/2/69
$2644~06
~
J 4