WSES-FSAR-UNIT-3 5-i Revision 14 (12/05)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 TABLE OF CONTENTS Section Title Page 5.0 REACTOR COOLANT SYSTEM AND CONNECTED 5.1-1 SYSTEMS 5.1
SUMMARY
DESCRIPTION 5.1-1 5.1.1 SCHEMATIC FLOW DIAGRAM 5.1-1 5.1.2 PIPING AND INSTRUMENT DIAGRAM 5.1-2 5.1.3 ELEVATION DRAWING 5.1-2 5.2 INTEGRITY OF REACTOR COOLANT PRESSURE 5.2-1 BOUNDARY 5.2.1 COMPLIANCE WITH CODES AND CODE CASES 5.2-1 5.2.2 OVERPRESSURIZATION PROTECTION 5.2-4 5.2.3 REACTOR COOLANT PRESSURE BOUNDARY 5.2-6 MATERIALS 5.2.4 INSERVICE INSPECTION AND TESTING 5.2.15 OF REACTOR COOLANT PRESSURE BOUNDARY 5.2.5 DETECTION OF LEAKAGE THROUGH REACTOR 5.2-18 COOLANT PRESSURE BOUNDARY 5.
2.5 REFERENCES
5.2-27
(DRN 03-2059, R14) 5.2A WATERFORD-3 OVERPRESSURE PROTECTION REPORT 5.2A-1 5.2A.1 DELETED 5.2A.2 DELETED 5.2A.3 DELETED 5.2A DELETED
(DRN 03-2059, R14)
WSES-FSAR-UNIT-3 5-ii CHAPTER 5 TABLE OF CONTENTS (Contd)
Section Title Page 5.2B LOW TEMPERATURE OVERPRESSURE PROTECTION 5.2B-1 DURING HEATUP, COOLDOWN, AND COLD SHUTDOWN 5.2B.1 SYSTEM DESCRIPTION 5.2B-1 5.2B.2 DESIGN CRITERIA 5.2B-1 5.2B.3 DESIGN AND ANALYSIS 5.2B-2 5.3 REACTOR VESSEL 5.3-1 5.3.1 REACTOR VESSEL MATERIALS 5.3-1 5.3.2 PRESSURE TEMPERATURE LIMITS 5.3-13 5.3.3 REACTOR VESSEL INTEGRITY 5.3-16
5.3 REFERENCES
5.3-19 5.4 COMPONENT AND SUBSYSTEM DESIGN 5.4-1 5.4.1 REACTOR COOLANT PUMPS 5.4-1 5.4.2 STEAM GENERATORS 5.4-10 5.4.3 REACTOR COOLANT PIPING 5.4-15 5.4.4 MAIN STEAM LINE FLOW RESTRICTIONS 5.4-17 5.4.5 MAIN STEAM LINE ISOLATION SYSTEM 5.4-17 5.4.6 REACTOR CORE ISOLATION COOLING SYSTEM 5.4-18 5.4.7 RESIDUAL HEAT REMOVAL SYSTEM 5.4-18 5.4.8 REACTOR WATER CLEANUP SYSTEM 5.4-18 5.4.9 MAIN STEAM LINE AND FEEDWATER PIPING 5.4-18 5.4.10 PRESSURIZER 5.4-18 5.4.11 QUENCH TANK (PRESSURIZER RELIEF TANK) 5.4-23
WSES-FSAR-UNIT-3 5-iii CHAPTER 5 TABLE OF CONTENTS (Contd)
Section Title Page 5.4.12 VALVES 5.4-25 5.4.13 SAFETY AND RELIEF VALVES 5.4-26 5.4.14 COMPONENTS SUPPORT 5.4-27 5.4.15 REACTOR COOLANT GAS VENTING SYSTEM 5.4-30 5.4.16 REFUELING WATER LEVEL INDICATING SYSTEM 5.4-34 5.4.17 REACTOR COOLANT SHUTDOWN LEVEL 5.4-35 MEASUREMENT SYSTEM (RCSLMS) 5.4A DYNAMIC ANALYSIS FOR THE WATERFORD 3 REACTOR VESSEL 5.4A-i SUPPORT LOADS UNDER LOCA CONDITIONS 5.4A.1 PURPOSE 5.4A-1 5.4A.2 CONCLUSION 5.4A-1 5.4A.3 BACKGROUND 5.4A-1 5.4A.4 MODELS 5.4A-2 5.4A-5 FORCING FUNCTIONS 5.4A-3 5.4A-6 RESULTS 5.4A-3 5.4A REFERENCES
WSES-FSAR-UNIT-3 5-iv Revision 14 (12/05)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF TABLES Table Title 5.1-1 Process Data Point Tabulation
(DRN 05-930, R14) 5.1-2 Parameters of Reactor Coolant System
(DRN 05-930, R14) 5.1-3 Nominal Reactor Coolant System Volumes 5.2-1 Codes and Addenda Applied to the Reactor Coolant Pressure Boundary 5.2-2 Applicable Code Cases 5.2-3 Reactor Coolant System Materials 5.2-4 Weld Materials for Reactor Coolant Pressure Boundary Components 5.2-5 Chemical Analyses of Plate Material in Waterford Unit 3 Reactor Vessel Beltline 5.2-6 Waterford Unit 3 Reactor Vessel Fracture Toughness Data 5.2-7 Waterford Unit 3 Piping Materials Fracture Toughness Data 5.2-8 Waterford 3 Pressurizer Materials Fracture Toughness Data 5.2-9 Waterford Unit 3 Steam Generator Materials Fracture Toughness Data 5.2-10 Reactor Coolant Leak Detection Sensitivity 5.2-11 ISI for Valves which form the Pressure Boundary of the RCS
(DRN 03-2059, R14) 5.2A-1 Deleted
(DRN 03-2059, R14) 5.3-1 Data Points used to Establish C-ERTNDT Shift Vs. Fluence and Percent Cv Upper Shelf Drop Vs. (Fluence) 1/2 Design Curves for A-533-B Reactor Vessel Materials 5.3-2 Literature References for Table 5.3-1 5.3-3 Summary of Surveillance Materials Testing 5.3-4 Total Quantity of Specimens 5.3-5 Type and Quantity of Specimens for Unirradiated Tests 5.3-6 Type and Quantity of Specimens for Irradiation Exposure and Irradiated Tests
WSES-FSAR-UNIT-3 5-v Revision 14 (12/05)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF TABLES (Cont'd)
Table Title 5.3-7 Candidate Materials for Neutron Threshold Detectors 5.3-8 Composition and Melting Points of Candidate Materials for Temperature Monitors 5.3-9 Type and Quantity of Specimens Contained in Each Irradiation Capsule Assembly 5.3-10 Capsule Assembly Removal Schedule 5.3-11 Waterford Unit 3 Reactor Vessel Closure Studs Data 5.3-12 Waterford Unit 3 Reactor Vessel Nuts and Washers Data 5.3-13 Waterford Unit 3 Reactor Vessel Materials
(DRN 03-2059, R14) 5.3-14 Calculation of the Waterford Unit 3 RTPTS Values for 32 EFPY
(DRN 03-2059, R14) 5.4-1 Reactor Coolant Pump Parameters 5.4-2 Steam Generator Parameters 5.4-3 Steam Generator Fabrication Testing 5.4-4 Reactor Coolant Piping Parameters 5.4-5 Reactor Coolant Piping Tests 5.4-6 Pressurizer Parameters 5.4-7 Pressurizer Tests 5.4-8 Quench Tank Parameters 5.4-9 Primary Safety Valve Parameters 5.4A-1 Results of LOCA Analysis of Reactor Vessel Supports 5.4A-2 Reactor Coolant System Model 5.4A-3 Pipe Break Summary 5.4A-4 Expanded Reactor Coolant System Model 350 in2 RV Inlet Nozzle Break 5.4A-5 Expanded Reactor Coolant System Model 600 in2 S.G. Inlet Nozzle Break
WSES-FSAR-UNIT-3 5-vi REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF FIGURES Figure Title 5.1-1 REACTOR COOLANT SYSTEM ARRANGEMENT PLAN 5.1-2 REACTOR COOLANT SYSTEM ARRANGEMENT ELEVATION 5.1-3 FLOW DIAGRAM REACTOR COOLANT SYSTEM 5.1-4 FLOW DIAGRAM REACTOR COOLANT PUMP SEALS 5.2-1 SECONDARY SYSTEM PRESSURE RELIEF 5.2-2 CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-1 5.2-3 CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-2 5.2-4 CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-3 5.2-5 CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-1 5.2-6 CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-2 5.2-7 CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-3 5.2-8 CHARPY TEST RESULTS BOTTOM HEAD TORUS M-1007-1 5.2-9 CHARPY TEST RESULTS BOTTOM HEAD DOME M-1008-1 5.2-10 CHARPY TEST RESULTS CLOSURE HEAD TOURS M-1005-1 5.2-11 CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-1 5.2-12 CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-2 5.2-13 CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-3 5.2-14 CHARPY TEST RESULTS CLOSURE HEAD DOME M-1006-1 5.2-15 CHARPY TEST RESULTS CLOSURE HEAD FLANGE M-603-1 5.2-16 CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-1 5.2-17 CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-2 5.2-18 CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-3 5.2-19 CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-4
WSES-FSAR-UNIT-3 5-vii Revision 14 (12/05)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF FIGURES (Cont'd)
Figure Title 5.2-20 CHARPY TEST RESULTS OUTLET NOZZLE SAFE END M-1012-1 5.2-21 CHARPY TEST RESULTS OUTLET NOZZLE SAFE END M-1012-2 5.2-22 CHARPY TEST RESULTS OUTLET NOZZLE FORGING M-1011-1 5.2-23 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-1 5.2-24 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-2 5.2-25 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-3 5.2-26 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-4 5.2-27 CHARPY TEST RESULTS OUTLET NOZZLE FORGING M-1011-2 5.2-28 CHARPY TEST RESULTS VESSEL FLANGE M-1001-1 5.2-29 CHARPY V-NOTCH TESTS ENERGY ABSORBED VS TEMPERATURE 5.2-30 CHARPY V-NOTCH TESTS LATERAL EXPANSION VS TEMPERATURE
(DRN 03-2059, R14) 5.2A-1 DELETED 5.2A-2 DELETED 5.2A-3 DELETED 5.2A-4 DELETED 5.2B-1 DELETED 5.2B-2 DELETED 5.2B-3 DELETED
(DRN 03-2059, R14) 5.3-1 C-ERTNDT SHIFT CURVE A533-B PLATE AND WELD MATERIAL DATA GROUP
( 0.10WT%CU )
WSES-FSAR-UNIT-3 5-viii Revision 11 (05/01)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF FIGURES (Contd)
Figure Title 5.3-2 CHARPY TEST RESULTS BASE METAL PLATE M-1004-2 (RW) 5.3-3 CHARPY TEST RESULTS WELD METAL PLATE M-1004-1/M-1004-3 5.3-4 CHARPY TESTS RESULTS HEAT AFFECTED ZONE METAL PLATE M-1004-2 5.3-5 TYPICAL CHARPY SURVEILLANCE CAPSULE ASSEMBLY 5.3-6 TYPICAL CHARPY IMPACT COMPARTMENT ASSEMBLY 5.3-7 TYPICAL TENSILE - MONITOR COMPARTMENT DETAIL 5.3-8 LOCATIONS OF SURVEILLANCE CAPSULE ASSEMBLIES 5.3-9 REACTOR VESSEL FASTENERS CHARPY IMPACT ABSORBED ENERGY VS TEMPERATURE 5.3-10 REACTOR VESSEL FASTENERS LATERAL EXPANSION VS TEMPERATURE 5.3-11 REACTOR VESSEL 5.4-1 REACTOR COOLANT PUMP OUTLINE 5.4-2 REACTOR COOLANT PUMP AND SEAL 5.4-3 REACTOR COOLANT PUMP PERFORMANCE 5.4-4 ANTI-REVERSE ROTATION DEVICE 5.4-5 STEAM GENERATOR 5.4-6 PRESSURIZER 5.4-7 PRESSURIZER LIQUID VOLUME PROGRAM 5.4-8 TEMPERATURE CONTROL PROGRAM 5.4-9 CONTROL ACTIONS RESULTING FROM HIGH OR LOW LEVEL ERROR SIGNALS 5.4-10 QUENCH TANK 5.4-11 PRIMARY SAFETY VALVE 5.4-12 REACTOR COOLANT SYSTEM ARRANGEMENT AND SUPPORT POINTS
WSES-FSAR-UNIT-3 5-ix Revision 11 (05/01)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF FIGURES (Contd)
Figure Title 5.4-13 REACTOR VESSEL SUPPORTS 5.4-14 STEAM GENERATOR SUPPORTS 5.4-15 REACTOR COOLANT PUMP SUPPORTS 5.4-16 PRESSURIZER SUPPORTS 5.4-17 REACTOR COOLANT SYSTEM VENTING SYSTEM 5.4-18 REFUELING WATER LEVEL INDICATING SYSTEM 5.4-19 REACTOR COOLANT SHUTDOWN LEVEL MEASUREMENT SYSTEM 5.4A-1 RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL ARRANGEMENT 5.4A-2 RV ASYMMETRIC LOADS ANALYSIS PRIMARY COOLANT PIPE BREAK AT REACTOR INLET NOZZLE 5.4A-3 RV ASYMMETRIC LOADS ANALYSIS ASYMMETRIC HYDRAULIC LOADS INTERNAL TO THE VESSEL 5.4A-4 RV ASYMMETRIC LOADS ANALYSIS REACTOR CAVITY PRESSURE LOADS 5.4A-5 RV ASYMMETRIC LOADS ANALYSIS PIPE THRUST LOAD 5.4A-6 RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL FORCES FOLLOWING LOCA 5.4A-7 RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR COOLANT SYSTEM MODEL 5.4A-8 RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR INTERNALS MODEL 5.4A-9 RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR COOLANT SYSTEM 5.4A-10 RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR INTERNALS 5.4A-11 RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONS SIMPLIFIED INTERNALS AND VESSEL 5.4A-12 RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONS DETAILED INTERNALS, SIMPLIFIED VESSEL
WSES-FSAR-UNIT-3 5-x Revision 11 (05/01)
REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 LIST OF FIGURES (Contd)
Figure Title 5.4A-13 RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL LOCA SUPPORTS 5.4A-14 RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT LOADS 5.4A-15 RV ASYMMETRIC LOADS ANALYSIS 350 SQ. IN. COLD LEG GUILLOTINE AT RV NOZZLE MAX. RV VERTICAL SUPPORT LOAD VS TIME (TYP) 5.4A-16 RV ASYMMETRIC LOADS ANALYSIS 350 SQ. IN. COLD LEG GUILLOTINE AT RV NOZZLE MAX. RV HORIZONTAL SUPPORT LOAD VS TIME
WSES-FSAR-UNIT-3 5-xi Revision 14 (12/05)
UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 13 Figure 5.4-9 ER-W3-2003-0373-000/DRN 03-1006 Figure 5.1-3 ER-W3-1998-0617-000/DRN 03-1348 Table 5.2-3 Sht 4 ER-W3-2001-1211-000/DRN 03-1707 Section 5.4.3.2 ER-W3-2003-0404-000/DRN 03-1268 Section 5.4.3.2 ER-W3-2001-1211-002/DRN 04-292 Revision 13-A Table 5.3-9 ER-W3-2004-0376/DRN 04-1049 Table 5.3-10 Section 5.2.5.1.1 ER-W3-2004-0396-002/DRN 04-1221 Section 5.2.5.1.2 Section 5.2.5.2 Table 5.2-10 Sht 1 Revision 14 Table of Contents ER-W3-2001-1149-000/DRN 03-2059 Section 5.2.2.1 Section 5.2.2.2 Section 5.2.5.1.2 Section 5.2B.1 Section 5.2B.3 Section 5.3.1.4 Section 5.3.1.6 Section 5.3.2.1 Section 5.3.2.3 Section 5.4.1.3 Section 5.4.1.4.1.2 Section 5.4.1.4.2 Section 5.4.2.1 Section 5.4.2.2 Section 5.4.11.1 Section 5.4.14.1 Section 5.4.14.2.2 Section 5.4.14.2.3 Section 5.4.14.3 References 5.3
WSES-FSAR-UNIT-3 5-xii Revision 14-B (06/06)
UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 14 Contd Appendix 5.2A ER-W3-2001-1149-000/DRN 03-2059 Contd Appendix 5.4A Table 5.1-1 Table 5.1-2 Table 5.2A-1 Table 5.3-10 Table 5.3-14 Table 5.4-1 sh 1 Table 5.4-2 Table 5.4-4 Figure 5.2A-1 Figure 5.2A-2 Figure 5.2A-3 Figure 5.2A-4 Figure 5.2B-2 Figure 5.2B-3 Figure 5.4-8 Section 5.4.11.1 ER-W3-2001-1149-000/DRN 05-316 Table of Contents ER-W3-2001-1149-000/DRN 05-930 Section 5.4.2.2 ER-W3-2002-0288-000/DRN 03-130 Section 5.4.3.2 ER-W3-2004-0122-000/DRN 05-892 Table 5.2-3 Table 5.4-6 sh 1 Figure 5.4-6 Section 5.4.1.3 ER-W3-2004-0276-000/DRN 05-150 Revision 14-A Table 5.2-3 sheet 1 ER-W3-2005-0441-000/DRN 05-1400 Table 5.2-3 sheet 2 Table 5.2-3 sheet 3 Table 5.2-3 sheet 4 Table 5.2-4 sheet 1 ER-W3-2005-0441-000/DRN 05-1400 Table 5.2-4 sheet 2 Section 5.4.1.4.1.1 ER-W3-2005-0436-000/DRN 05-1392 Revision 14-B Section 5.2.5.1.1 ER-W3-2006-0069-000/DRN 06-250 Section 5.4.2.2 ER-W3-2005-0442-000/DRN 06-290
WSES-FSAR-UNIT-3 5-xiii Revision 15 (03/07)
UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 15 Section 5.4.3.1 ER-W3-2006-0190-000/DRN 06-546 Section 5.4.10.1 Table 5.2-2 Sh. 1 ER-W3-2006-0194-000/DRN 06-552 Table 5.2-2 Sh. 2 Table 5.2-2 Sh. 3 Table 5.2-3 Sh. 4 ER-W3-2006-0186-000/DRN 06-720 Section 5.3.2.1 ER-W3-2006-0223-000/DRN 06-842 Section 5.2.3.3.2.1 ER-W3-2006-0281-000/DRN 06-872 Section 5.2.4 Section 5.3.1.3 Table 5.4-9 Table 5.2-10 Sh. 1 ER-W3-2006-0282-000/DRN 06-885 Table 5.2-11 Sh. 1 ER-W3-2006-0223-000/DRN 06-897 Table 5.2-11 Sh. 2 Table 5.2-11 Sh. 4 Table 5.2-11 Sh. 5 Table 5.3-4 Table 5.3-5 Table 5.3-6 Table 5.4-6 Sh. 1 ER-W3-2006-0223-000/DRN 06-904 Table 5.4-6 Sh. 2 Section 5.2.3.4.1.1.1 ER-W3-2006-0223-000/DRN 06-911 Section 5.2.3.4.2.1 Table 5.2-3 Sh. 1 Table 5.2-3 Sh. 2 Section 5.3.1.3 Section 5.3.2.2 Section 5.2.2.4 ER-W3-2006-0245-000/DRN 06-1002 Section 5.4.2.1 ER-W3-2005-0447-004/DRN 06-1060 Table 5.4-2 Sh. 1 Table 5.4-2 Sh. 2 Figure 5.1-2 ER-W3-2007-0002-000/DRN 07-2
WSES-FSAR-UNIT-3 5-xiv Revision 305 (11/11)
UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 301 Section 5.4.15.2.3 EC-5000080002 Section 5.2.4.2 EC-5000082400 Section 5.2.5 EC-5000082424 Section 5.2.5.6 Revision 302 Table 5.2-11 Sh. 1 EC-935 Table 5.2-11 Sh. 4 Table 5.2-4 Sh. 2 EC-1830 Section 5.4.1.2.1.3 EC-6256 Section 5.2.5.1.7 Figure 5.1-4 Revision 303 Table 5.2-2 Sh. 2 EC-14300 Revision 304 Figure 5.1-4 EC-18520 Section 5.4.1.2.1.3 Section 5.4.2.3.1.3 EC-18652 Revision 305 Table 5.2-11 Sheet 1 of 5 EC-14765 Table 5.2-11 Sheet 4 of 5 Section 5.2.5 EC-19087 Section 5.2.5.1.1 Section 5.2.5.1.10 Section 5.2.5.4 Section 5.2.5.5 Section 5.2.5: References Section 5.4.3.2 Section 5.4.1.3 EC-30077
WSES-FSAR-UNIT-3 5-xv Revision 307 (07/13)
UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 307 Section 5.2.1.1 EC-1020 Section 5.2.3.3.1 Section 5.2.3.3.2.1 Table 5.2-1 Sheet 1 of 2 Table 5.2.2 Sheet 1 of 3 Table 5.2.3 Sheet 1 of 4 Table 5.2.4 Sheet 2 of 2 Table 5.2-6 Sheet 1 of 2 Table 5.2.6 Sheet 2 of 2 Figure 5.2-10 Figure 5.2-14 Figure 5.2-15 Section 5.3.1.1 Section 5.3.1.5 Section 5.3.3 Section 5.3.3.3 Section 5.3.3.4 Section 5.3.3.5 Figure 5.3-11 Section 5.2.3.3.1 EC-2800 Section 5.2.3.4.1.1.1 Section 5.2.3.4.2.1 Table 5.2-1 Sheet 2 of 2 Table 5.2-2 Sheet 2 of 3 Table 5.2.3 Sheet 1 of 4 Table 5.2-4 Sheet 1 of 2 Table 5.2-4 Sheet 2 of 2 Section 5.4.14.2.2 EC-8438 Figure 5.4-12 Figure 5.4-14 Section 5.1 EC-8458 Table 5.1-1 Table 5.1-2 Table 5.1-3 Section 5.2.1.1 Table 5.2-1 Sheet 1 of 2 Table 5.2-3 Sheet 1 of 4 Table 5.2-3 Sheet 2 of 4 Table 5.2-9 Appendix 5.2A Appendix 5.2B Section 5.4.1.2.1.4 Section 5.4.1.3 Section 5.4.2.1
WSES-FSAR-UNIT-3 5-xvi Revision 309 (06/16)
UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 307 (Continued)
Section 5.4.2.1 EC-8458 (Continued)
Section 5.4.2.2 Section 5.4.2.3.1.1 Section 5.4.2.3.1.4 Section 5.4.2.4.1 Section 5.4.4 Table 5.4-2 Sheet 1 of 2 Table 5.4-2 Sheet 2 of 2 Table 5.4-3 Table 5.4-4 Figure 5.4-5 Figure 5.4-8 Section 5.4.11.1 Section 5.4.1.3 EC-38245 Revision 308A Section 5.4 LBDCR 15-028 Revision 309 Table 5.2-1 Sheet 1 of 2 LBDCR 15-004 Table 5.4-6 Sheet 1 of 2 Figure 5.4-6 Table 5.2-1 Sheet 2 of 2 LBDCR 15-021 Table 5.4-6 Sheet 1 of 2 Table 5.2-1 Sheet 1 of 2 LBDCR 16-007 Table 5.2-1 Sheet 2 of 2 LBDCR 16-017 Table 5.4-6 Sheet 1 of 2 Figure 5.4-6