RS-14-312, Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report
ML14310A817 | |
Person / Time | |
---|---|
Site: | Clinton ![]() |
Issue date: | 11/03/2014 |
From: | Kaegi G Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RS-14-312 | |
Download: ML14310A817 (3) | |
Similar Documents at Clinton | |
---|---|
Category:Letter type:RS
MONTHYEARRS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023
[Table view]Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 22021-03-23023 March 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 RS-21-028, Fitness for Duty Performance Data Reports - Annual 20202021-02-26026 February 2021 Fitness for Duty Performance Data Reports - Annual 2020 RS-21-032, Amended Decommissioning Trust Agreements2021-02-25025 February 2021 Amended Decommissioning Trust Agreements RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping 2023-09-07 Category:Report MONTHYEARRS-23-073, Request for Partial Site Release2023-06-0707 June 2023
[Table view]Request for Partial Site Release NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits ML22014A0052022-01-13013 January 2022 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting U-604712, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval2020-06-24024 June 2020 Submittal of the Snubber Program Plan for the Fourth 10-Year Interval ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18360A4722018-12-14014 December 2018 Attachment 4: Training Material on Diesel Generator Malfunctions ML18360A4712018-12-14014 December 2018 Attachment 3: EC 626319, Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. II Air Start Receiver Valves ML18360A4692018-12-14014 December 2018 Attachment 1: Summary of Exelon Position ML18360A4702018-12-14014 December 2018 Attachment 2: Response to NRC Questions and Documentation Requests ML18360A4852018-12-14014 December 2018 Attachment 17: Inconsistencies Between FLEX SE and Choice Letter Assumptions ML18360A4842018-12-14014 December 2018 Attachment 16: Graph of RPV Water Level ML18360A4832018-12-14014 December 2018 Attachment 15: FLEX and Cross-tie Training Material ML18360A4732018-12-14014 December 2018 Attachment 5: Senior Reactor Operator Surveys ML18360A4742018-12-14014 December 2018 Attachment 6: CPS Shift Manager Surveys Regarding ELAP Scenarios ML18360A4752018-12-14014 December 2018 Attachment 7: Time Validation - Performance of SBO and Starting of Division 2 Diesel Generator ML18360A4822018-12-14014 December 2018 Attachment 14: CPS Procedure 4200.01 C002, DC Load Shedding During a 580, Rev 5a ML18360A4812018-12-14014 December 2018 Attachment 13: Simulator Exercise Guide SE-JIT-42, Loss of AC, Loss of SDC and Lowering RPV Level, Rev 1 ML18360A4802018-12-14014 December 2018 Attachment 12: Time Validation - Performance of Division 3 DG to Division 2 Bus Cross-tie ML18360A4792018-12-14014 December 2018 Attachment 11: Procedures and Training Material on Maintaining RPV Pressure Low ML18360A4782018-12-14014 December 2018 Attachment 10: HEP Evaluation Related to Shutdown Cooling Isolation ML18360A4772018-12-14014 December 2018 Attachment 9: Procedures on Shutdown Cooling Isolation ML18360A4762018-12-14014 December 2018 Attachment 8: 2017 Training Material on Diesel Generator Air Start Flow Plow RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-0492015-12-14014 December 2015 Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 RS-15-269, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2015-10-23023 October 2015 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML15062A1152014-12-22022 December 2014 International Atomic Energy Agency (Iaea), Operational Safety Review Team (Osart) Mission to Clinton Report - 11- 28 August 2014 RS-14-312, Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2014-11-0303 November 2014 Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14164A2982014-06-26026 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 RS-14-112, Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA)2014-03-27027 March 2014 Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) ML13338A6562013-12-0909 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Clinton Power Station, Unit 1, TAC No.: MF0901 IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12340A3492012-11-27027 November 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-1432012-11-27027 November 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-142012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 ML12340A3482012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 2023-06-07 Category:Technical MONTHYEARNMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022
[Table view]Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping U-604712, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval2020-06-24024 June 2020 Submittal of the Snubber Program Plan for the Fourth 10-Year Interval ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-0492015-12-14014 December 2015 Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 RS-14-312, Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2014-11-0303 November 2014 Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 RS-14-112, Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA)2014-03-27027 March 2014 Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) ML13338A6562013-12-0909 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Clinton Power Station, Unit 1, TAC No.: MF0901 ML12340A3492012-11-27027 November 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-1432012-11-27027 November 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-142012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report2012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report ML12340A3482012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 ML12340A3472012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-144 Through C-2852012-10-0101 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-144 Through C-285 RS-12-082, Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA)2012-05-14014 May 2012 Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) ML0904007952009-02-0404 February 2009 GSI-189 Action Plan, Feb. 09 Update, Publicly Available Version ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0636202642006-12-31031 December 2006 Hydraulic Model Study of High Pressure Core Spray Pump Suction to Evaluate the Formation of Air Drawing Vortices and Air Withdrawal ML0636202662006-12-21021 December 2006 Attachment 2, U-603798, Engineering Change Evaluation 363975 Revision 0 U-603798, Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing2006-12-21021 December 2006 Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing ML0634601312006-12-0707 December 2006 Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier ML0508202832005-03-31031 March 2005 GENE-0000-0023-6259-05NP, Rev 1, Amergen Energy Co, LLC Clinton Power Station BWRVIP-04A Core Shroud Repair Design Submittal to the Nuclear Regulatory Commission (Nrc). ML0508202932005-02-28028 February 2005 GENE-0000-0023-6259-03NP, Rev 2, Amergen Energy Co, LLC Clinton Power Station Non-Core Support Structural Components Assessment. ML0508202982005-02-28028 February 2005 GENE-0000-0023-6259-04NP, Rev 0, Amergen Energy Co., LLC Clinton Power Station Unit 1 Core Shroud Repair GE Input to IOCFR50.59 Evaluation by Cps. ML0423901812004-07-16016 July 2004 Holtec International Report No. HI-2033124 Spent Fuel Storage Expansion at Clinton Power Station. RS-04-024, Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-042004-05-20020 May 2004 Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-04 ML0412109162004-04-22022 April 2004 Technical Evaluation of Extending Division 1 and 2 Inverter Completion Time (CT) ML0802902312004-02-12012 February 2004 Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 ML0327216212003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Chapter 6, Response of Soil and Rock to Dynamic and Static Loading ML0327216132003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents, Appendix a, Attachment A-4, Stratigraphics Cone Penetrometer Test Report ML0327216152003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-5, Geovision Suspension Logging Report ML0327216172003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-6, TSC, Laboratory Test Results ML0327216192003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-7, Results of Resonant Column/Cyclic Torsional Shear Testing ML0327216202003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Geotechnical Report, Table of Contents Through Figure 5-24 ML0327306082003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Table of Contents Through Figure B-1-6 ML0327306092003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-6 Through B-1-11 ML0327306102003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2 ML0327306122003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Table of Contents Through Figure 2.1-19 ML0327306132003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1 ML0327306142003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Figure 2.1-2 ML0327306152003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 ML0327306162003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 ML0327306172003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19 ML0327306182003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 ML0327306192003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 RS-03-013, Request for Amendment to TS 3.6.5.1, Drywell & 5.5.13, Primary Containment Leakage Rate Testing Program2003-01-29029 January 2003 Request for Amendment to TS 3.6.5.1, Drywell & 5.5.13, Primary Containment Leakage Rate Testing Program 2022-06-30 |
Contents
Text
O Exeton Generation, 10 CFR 50.54(f)
RS-14-312 November 3, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report
References:
- 1. Exelon Generation Company, LLC Letter to USNRC, Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flooding Hazard Reevaluation Report, dated March 12, 2014 (RS-14-054 Clinton)
- 2. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012
- 3. NRC Email Request for Additional Information (RAI) Regarding Clinton Station Fukushima Lessons Learned - Flood Hazard Reevaluation Report, dated October 14, 2014 In Reference 1, Exelon Generation Company, LLC (EGC) provided the Flooding Hazard Reevaluation Report for Clinton Power Station in response to the March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, (Reference 2).
The purpose of this letter is to provide supplemental information in response to the NRC request for additional information (RAI) (Reference 3). Enclosure 1 to this letter provides the additional Clinton Station flood hazard evaluation Delft 3D Model Input / Output electronic information files for the Combined Event Scenarios (H4.2-1, H4.2-2, and H4.2-3) requested by Reference 3.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Ron Gaston at (630) 657-3359.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 3rd day of November 2014.
-AD1
U.S. Nuclear Regulatory Commission Response to Request for Additional Information (Flooding Hazard Reevaluation Report)
November 3, 2014 Page 2 Respectfully submitted, Glen T. Kaegi Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC
Enclosure:
DVD labeled: Clinton Power Station Delft 3D Input/Output Files for Calculation IP-S-0286 Regarding Fukushima Lessons Learned-Flood Hazard Reevaluation Report Document Components:
IP-S-0286 Combined Effects Delft3D Model H.4.2, Alternative 1, Delft3D Output and Inputs H.4.2, Alternative 2, Delft3D Output and Inputs H.4.2, Alternative 3, Delft3D Output and Inputs cc: Director, Office of Nuclear Reactor Regulation (w/o Enclosure)
NRC Regional Administrator - Region III (w/o Enclosure)
NRC Senior Resident Inspector - Clinton Power Station, Unit 1 (w/o Enclosure)
NRC Project Manager, NRR - Clinton Power Station, Unit I (with Enclosure)
Mr. Victor Hall, NRR/JLD/JHMB, NRC (with Enclosure)
Illinois Emergency Management Agency - Division of Nuclear Safety (w/o Enclosure)
Enclosure
- DVD labeled Clinton Power Station Delft 3D Input/Output Files for Calculation IP-S-0286 Regarding Fukushima Lessons Learned-Flood Hazard Reevaluation Report