CP-201500248, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)

From kanterella
(Redirected from ML15069A219)
Jump to navigation Jump to search

Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML15069A219
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/26/2015
From: Madden F
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201500248, EA-12-049, TAC MF0860, TAC MF0861, TXX-15035
Download: ML15069A219 (11)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.flores@luminant.com Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201500248 REF 10 CFR 2.202 Log # TXX-15035 February 26, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Comanche Peak Nuclear Power Plant, Docket Nos. 50-445 AND 50446, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond-Design-Basis External Events (Order Number EA-12-049) (TAC NOS. MF0860 and MF0861)

REFERENCES:

1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events dated March 12, 2012
2. NRC Interim Staff Guidance JLD-ISG-2012-01, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Revision 0, dated August 29, 2012
3. NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide,"

Revision 0, dated August 2012

4. Luminant Generation Company LLC's Letter TXX-12158, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation strategies for Beyond-Design-Basis External events (Order Number EA-12-049), dated October 25, 2012
5. Luminant Generation Company LLC's Letter TXX-13030, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation strategies for Beyond-Design-Basis External events (Order Number EA-12-049), dated February 28, 2013

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) staff issued an order (Reference 1) to Luminant Generation Company LLC (Luminant Power). Reference 1 was immediately effective and directs Luminant to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV,

U. S. Nuclear Regulatory Commission TXX-15035 Page 2 of 2 02/26/2015 Condition C. Reference 2 endorses industry guidance document NEI 12-06, Revision 0 (Reference

3) with clarifications and exceptions identified in Reference 2. Reference 4 provided Luminant Power's initial status report regarding mitigation strategies. Reference 5 provided Luminant Power's overall integrated plan.

Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the fourth six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The attached report provides an update of milestone accomplishments since the overall integrated plan was submitted (Reference 5), including any changes to the compliance method, schedule, or need for relief and the basis, if any.

This letter contains no new regulatory commitments.

If you have any questions regarding this report, please contact Carl B. Corbin at 254-897-0121 or carl.corbin@luminant.com.

I state under penalty of perjury that the foregoing is true and correct.

Executed on February 26, 2015.

Sincerely, Luminant Generation Company LLC Rafael Flores By: A*I U*h.

y'_ ed W. Marden Director, External Affairs

Attachment:

Comanche Peak Nuclear Power Plant's (CPNPP) Fourth Six Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events c- William M. Dean, Director, Office of Nuclear Reactor Regulation Marc L. Dapas, Region IV Jessica A. Kratchman, NRR/JLD/PMB Balwant K. Singal, NRR Resident Inspectors, Comanche Peak Nuclear Power Plant

Attachment to TXX-1 5035 Page 1 of 9 Comanche Peak Nuclear Power Plant's (CPNPP) Fourth Six Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 1 Introduction Comanche Peak Nuclear Power Plant (CPNPP) developed an Overall Integrated Plan (Reference 1),

documenting the diverse and flexible strategies (FLEX), in response to Reference 2. This attachment provides an update of milestone accomplishments since submittal of the Overall Integrated Plan and the First, Second and Third Six Month Status Reports (References 3, 7 and 11), including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.

2 Milestone Accomplishments The following milestone(s) have been completed since the development of the Overall Integrated Plan (Reference 1), and are current as of February 18, 2015.

" FLEX Strategy Evaluation - Complete

  • Modifications Evaluations - Complete
  • Storage Design Engineering - Complete
  • Procedures - PWROG issues NSSS-specific guidelines - Complete
  • National Safer Response Center (NSRC) Operational - Complete
  • Develop Training Plan - Complete 3 Milestone Schedule Status The following table provides an update to Attachment 2 of the Overall Integrated Plan (OIP). It provides the activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed. Note, italicized items in the following table were not provided as milestone items in Attachment 2 of the OIP. However, these items are added here for consistency with the 6 month status update template and will be carried forward in future 6 month status updates.

Attachment to TXX-15035 Page 2 of 9 Target Revised Target Milestone Completion Activity Status Completion Date Date Submit 60 Day Status Report Oct 2012 Complete Submit Overall Integrated Plan Feb 2013 Complete Submit 6 Month Updates:

Update 1 Aug 2013 Complete Update 2 Feb 2014 Complete Update 3 Aug 2014 Complete Update 4 Feb 2015 Complete Update 5 Aug 2015 Not Started FLEX Strategy Evaluation Aug 2013 Complete Walk-throughs or Demonstrations Apr 2015 Not Started Aug 2015 Perform Phase 2 Staffing Analysis Jun 2014 Started Jun 2015 Modifications:

Modifications Evaluation Aug 2013 Complete Develop Unit 1 Modifications Mar 2014 Started Sep 2015 Unit 1 Implementation Outage (1RF18) Oct 2014 Not Started Apr 2016 Develop Unit 2 Modifications Mar 2015 Started Unit 2 Implementation Outage (2RF15) Oct 2015 Not Started Storage:

Storage Design Engineering Mar 2014 Complete Storage Implementation Feb 2015 Started Sep 2015 FLEX Equipment:

Procure On-Site Equipment Jul 2014 Started Jul 2015 Develop Site Response Plan with NSRC Apr 2015 Started Aug 2015 Install Off-Site Delivet/ Station (if Necessanj) Not Required Not Required Not Required National Safer Response Center Operational Aug 2014 Complete Procedures:

PWROG issues NSSS-specific guidelines May 2013 Complete Issue FSGs Aug 2014 Started Oct 2015 Create Maintenance Procedures Jul 2014 Started Oct 2015 Training:

Develop Training Plan May 2014 Complete Dec 2014 Implement Training Apr 2015 Started Sep 2015 Full Site FLEX Implementation Oct 2015 Started Apr 2016 Submit Completion Report Feb 2016 Not Started Aug 2016

Attachment to TXX-1 5035 Page 3 of 9 4 Changes to Compliance Method The following are either changes or clarifications to the compliance method and are in addition to those identified in the First, Second and Third Six Month Status Reports (References 3, 7 and 11).

NSRC Large Debris Removal Equipment Contrary to pages 8, 23, 69 and 79 of the OIP, large debris removal equipment will not be obtained from the NSRC. Rather, the Comanche Peak Emergency Response Organization will coordinate with regional equipment and resource providers for receipt of such equipment as early as 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> post-ELAP initiation when limited site access is predicted to be available. As full site access is restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of ELAP initiation and NSRC equipment for Phase 3 will arrive within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of ELAP declaration, reliance on the event-driven procurement of regional equipment and resources is considered reasonable.

Phase 2 480V Generator Connection to Plant Support Power Further review of Figures A3-23 through A3-29 of the OIP concludes improvement in understanding of the associated Phase 2 FLEX strategy can be achieved by figure consolidation. This is not a change in compliance method but merely an improvement in the depiction of the Phase 2 480VAC generator and its physical connection to the credited Phase 2 loads through Plant Support Power. Figure A3-23 of the OIP should be replaced with that provided in Appendix A of this letter and Figures A3-24 through A3-29 of the OIP should be deleted. All text references in the OIP to Figures A3-24 through A3-29 should reference Figure A3-23 solely.

Public Address System Battery Backup Power Supply As discussed on page 50 of Reference 4, the NRC determined in Reference 12 that the assessment for communications is reasonable, and the analyzed existing systems, proposed enhancements and interim measures will help to ensure that communications is maintained. Also in Reference 12, Comanche Peak committed'to evaluating the feasibility of modifying the public address system to allow for a battery backup power supply. As communicated to the NRC in Reference 13, Comanche Peak has evaluated this potential modification and decided against its implementation.

Protected Water Sources for Feeding the Steam Generators Differing from pages 8, 12, 15, 58-59 and 79 of the OIP, further evaluation has concluded the Condensate Storage Tank (CST) and Reactor Makeup Water Storage Tank (RMWST) will provide more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of protected, high-quality water for feeding the steam generators during an ELAP when cross-tied.

Individually, the CST will provide more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> of water (269,699 gallons) and the RMWST will provide more than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of water (73,898 gallons) for decay heat removal. Consequently, the use of the SSI as a water source for makeup to the CST is not required until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ELAP initiation, if no other water sources are available.

5 Need for Relief/Relaxation and Basis for the Relief/Relaxation In Reference 5, Luminant formally requested relief from the requirement of Section IV.A.2 of the Order (EA-12-049) regarding full implementation no later than two (2) refueling cycles after submittal of the Overall Integrated Plan. NRC approval of the requested relief was received in Reference 8, relaxing full order implementation for Comanche Peak Unit 1 until the completion of the spring 2016 refueling outage.

Full order implementation for Comanche Peak Unit 2 is unchanged and will occur upon completion of the fall 2015 refueling outage. The milestone schedule in Section 3 has been updated for consistency with the approved schedule relief. No additional relief is requested herein.

Attachment to TXX-1 5035 Page 4 of 9 6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following table provides a summary of the open items documented in the OIP and the status of each item.

Overall Integrated Plan Open Items Status OI1. Finalize location and protection requirements of FLEX Complete. FLEX equipment will be storage buildings. The storage buildings will be stored in a new single structure designed in accordance with the NEI guidance and the designed as described in Section 4 of applicable hazards. Reference 7.

012. Perform containment evaluation based on the boundary Complete. The containment analysis conditions described in Section 2 of NEI 12-06. Based on concludes no significant heatup or the results of this evaluation, required actions to ensure pressurization of containment as a maintenance of containment integrity and required result of an ELAP when crediting instrument function will be developed as necessary. SHIELD. No further action required.

013. Development of refueling equipment specifications, Development of final specifications determination of fuel consumption rates, assessment of for all FLEX equipment has started.

fuel supplies and determination of time frames for refueling of FLEX equipment in Phases 2 and 3 will be developed following generation of specifications for FLEX equipment.

014. Finalize FLEX strategies and required modifications Comanche Peak FLEX strategies following resolution of low-leakage RCP seal credit the use of SHIELD low-leakage performance issue. seals as approved in Reference 9.

Preparation of design modifications for installation of SHIELD are in progress.

Attachment to TXX-1 5035 Page 5 of 9 Draft Safety Evaluation and Interim Staff Evaluation (ISE) are assumed synonymous. The following are additional Open Items documented in the Interim Staff Evaluation (Reference 4). These open items will be carried forward in future 6 month status updates until confirmation is received from the NRC that the items may be closed. Luminant Power is participating in the voluntary NRC audit process described in Reference 6.

Interim Staff Evaluation Open Items Status 3.2.1.2.A Regarding the RCP seals, the only O-ring of interest Reference 9 documents NRC with the safe shutdown low-leakage (SHIELD) installed acceptance of SHIELD for use in is the RCP seal sleeve to shaft O-ring. Qualification of ELAP evaluations. Item 2 of the the RCP seal sleeve to shaft O-ring will be tracked as limitations and conditions from part of the SHIELD redesign to confirm the delayed Reference 9 restricts the maximum cooldown, as documented in the Integrated Plan, is steady-state RCS cold leg temperature acceptable. CPNPP will align with testing results to be to 571'F during an ELAP. The main documented in the forthcoming SHIELD white paper. steam safety valve lift setpoints for Comanche Peak Units 1 and 2 ensure this temperature limit will be met.

3.2.1.2.C If the RCP seals are changed to the newly designed Reference 9 documents NRC Generation 3 SHIELD seals, or non-Westinghouse seals, acceptance of SHIELD for use in the acceptability of the use of the newly designed ELAP evaluations. Item 4 of the Generation 3 SHIELD seals, or non-Westinghouse seals limitations and conditions from should be addressed, and the RCP seal leakages rates for Reference 9 restricts the seal leakage use in the ELAP analysis should be provided with rate to a constant 1.0 gallon per acceptable justification. During the audit process the minute after SHIELD actuation. Any licensee stated that CPNPP uses the Westinghouse deviation from this restriction will be mode193A RCPs crediting SHIELD for FLEX strategies. justified.

Testing and qualification of SHIELD is ongoing and the licensee is closely following the re-design of SHIELD and will modify analyses and FLEX strategies if needed, based on the conclusions of the SHIELD white paper.

3.2.1.8.A The Pressurized Water Reactor Owners Group Per Reference 10, the NRC has (PWROG) submitted to NRC a position paper, dated endorsed the PWROG position paper August 15, 2013 (ADAMS Accession No. ML 13235A with restrictions. Luminant is 132, non-public, proprietary), which provides test data currently assessing the impact of regarding boric acid mixing under single-phase natural these restrictions on the CPNPP FLEX circulation conditions and outlines applicability strategy for maintaining conditions intended to ensure that boric acid addition subcriticality.

and mixing would occur under conditions similar to those for which boric acid mixing data is available.

However, the NRC staff concluded that the August 15, 2013, position paper was not adequately justified and did not endorse this position paper. As such, ensuring adequate mixing of boric acid into the RCS under ELAP conditions is an open item for CPNPP.

Attachment to TXX-1 5035 Page 6 of 9 7 Potential Draft Safety Evaluation Impacts Any potential impact to the Interim Staff Evaluation has been previously discussed in Section 4 of this letter.

8 References The following references support the updates to the OIP described in this attachment.

1. Comanche Peak Nuclear Power Plant Docket Nos. 50-445 and 50-446 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049),

dated February 28, 2013.

2. NRC Order Number EA-12-049,-"Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated March 12, 2012.
3. Comanche Peak Nuclear Power Plant, Docket Nos. 50-445 and 50-446, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond- Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0860 and MF0861), dated August 28, 2013.
4. NRC Interim Staff Evaluation, "Comanche Peak Nuclear Power Plant, Units 1 And 2 - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) (TAC Nos. MF0860 and MF0861)," dated December 19, 2013.
5. Comanche Peak Nuclear Power Plant (CPNPP), Docket Nos. 50-445 and 50-446, Request for Schedule Relaxation for the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond-Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0860 and MF0861), dated February 12, 2014.
6. NRC Letter from Jack R. Davis to All Operating Reactor Licensees and Holders of Construction Permits, "Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049," August 28, 2013.
7. Comanche Peak Nuclear Power Plant, Docket Nos. 50-445 and 50-446, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond- Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0860 and MF0861), dated February 27, 2014.
8. NRC Letter from Eric J. Leeds to Mr. Rafael Flores, "Comanche Peak Nuclear Power Plant, Unit 1

- Relaxation of Certain Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events," April 14, 2014.

9. NRC Letter from Jack Davis to Mr. James A. Gresham, ADAMS Accession No. ML14132A128, May 28, 2014.
10. NRC Letter from Jack Davis to Mr. Jack Stringfellow, ADAMS Accession No. ML13276A183, January 8, 2014.

Attachment to TXX-15035 Page 7 of 9

11. Comanche Peak Nuclear Power Plant, Docket Nos. 50-445 and 50-446, Third Six-Month Status Report in Response to March 12, 2012, Conunission Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond- Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0860 and MF0861), dated August 28, 2014.
12. NRC Letter from Balwant K. Singal to Mr. Rafael Flores, "Comanche Peak Nuclear Power Plant, Units 1 and 2 - Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment (TAC Nos. MF0003 and MF0004),

dated June 3, 2013.

13. Comanche Peak Nuclear Power Plant (CPNPP), Docket Nos. 50-445 and 50-446, Updated Response to March 12, 2012, Request for Information Regarding Recommendation 9.3 (Communications and Staffing) of the Near-Term Task Force Report (TAC NOS. ME8686 and ME8687), dated October 30, 2014.

Attachment to TXX-1 5035 Page 8 of 9 Appendix A Overall Integrated Plan Figures - Revised

Attachment to TXX-15035 Page 9 of 9 Phase 2 480 VACFLEXGenerator CPX-FXDGEE-01/02 WOkW,480V, 752A

&I Wcw3320 M3MCM r/ --- -- --

LI XB1O-1 XBID-1-4 CPX-EPDPNB-08 CPX-EPDPNB-57 E1-0024-O0E E1-0024-OI1F (YARDnear 2ST XMFR) (U2 Train A SWGRRM810')

17 40A 400A I~A 600 400A 25') 2504 2SA 13 4)0AA 40A I0 M-A 3(I.eX10 331/3 s 0 ixma 3/c "a C. ý in.

-- IN --

40QA We 400 600A3 X810-1-130 X1110-1-3 XBIO-12 2510-1-1 1 CPX-EPDPNB-07 ICPX-EPDPNB-06I CP2-EPDPNB-12 CPX-EPDPNB-05 M)o 3 3

,3 3

ýM) 3e03 EI-0024-018 El8-0024-01A E2-0024-02 El-0024-OIA IMP3n (EC8778') (AUX 852')(U2 SG0810') (AUX 832')

3)200A 11 )250A 2 u IL_ 14) 20DA is) 200A

)z2 o

_6)42ooA)0 20D 20A )200A )200A 20 1BIO-1-2-1 2810-1-1-2 l- 3 281-1--1 111-11-3 IPl-EPIPNB-281 CPX-EPDPNB-45 CP1-EPDPNB-27 CP2-EPDPNB-25 CPX-EPDPNB-46 ICP2-EPDPNB-271 CP2-EPDPNB-281 El-0024-01C EI-0024-OIC E1-0024-O1C L E2-0024-03C E2-0024-03D 1E2-0024-03C 1E2-0024-03C1 (Ul SG 852') (U2 SG 790') (AUX 790')

(US 80) (U2sS 852s

2) 12A 6) 15A ) 121A 1)iA 125A 12SA ) 2 125A 15A 1E21S 2E83-M9 2193071 2EB4-021 2EB4-04 S 2191-10S ~ 2EB2-135 118-17 1193-16 1184-1 1E84-16 1 1E62-1 2E93-1 2 $31 j 14-1 2EB. 1- 219-1 2192-1 Btt~ery 1350431 Btt~ery Eohaaot 163 Test Battery Bm Battery Exhust Battey Ehaust Charger Fan Ch.arer Fae Battery Battery Charger Charger Fan Chamer Fan 1101-2 1-1(A) 1102-2 1-2(B) Chnarer Charger 1ED4-1 2ED1-2 2-1(A) 2ED2-2 2-2(B)

BUROT-01BTXRT-02 Note2 Note 2 2E03-1 2104-1 03313 Figure A3-23: Phase 2 490VAC FLOX Generator Connection to Plant Support Power 103