ML15057A430
Jump to navigation
Jump to search
| ML15057A430 | |
| Person / Time | |
|---|---|
| Issue date: | 02/27/2015 |
| From: | Kevern T NRC/NRO/DARR |
| To: | |
| Kevern T (301) 415-0224 | |
| Shared Package | |
| ML15057A165 | List: |
| References | |
| Download: ML15057A430 (1) | |
Text
Draft Revision February 27, 2015 C.1 Application Format & Content
- 11. PART 11 - Supplemental Information An application for a combined license (COL), standard design certification (DC), or early site permit (ESP) under 10 CFR Part 52 likely needs to include information supplemental to the standard information identified in Parts 1 through 10. For standardization of applications, Part 11 of the COL, DC, or ESP application contains this supplemental information.
The supplemental information may address:
- 1. A regulatory option selected by the applicant (e.g., limited work authorization (LWA),
site redress plan);
- 2. An application-specific regulatory issue (e.g., geotechnical subsurface investigation report, site-specific seismic analysis report, topical report(s) not previously submitted);
or
- 3. Other information specifically identified by the NRC or that the applicant deems appropriate for a complete application and timely NRC review (e.g., applicants position regarding a request for additional information issued by the NRC to another applicant with the same plant design or similar plant site).
Part 11 should not include information designated for inclusion in Parts 1 through 10 of the application. In particular, Part 11 should not be used for providing information that is required to be contained in the Safety Analysis Report in Part 2 of the application.