IPRenewal NPEmails From: Baldwin, Linda (DOS) [Linda.Baldwin@dos.ny.gov]

Sent: Friday, December 05, 2014 3:55 PM To: Turk, Sherwin Cc: IPRenewal NPEmails; Wentzel, Michael

Subject:

RE: Consistency review of the Indian Point Nuclear Generating Units Nos. 2 and 3 (Part 3 -

Attachment 2 to NYSDOS Letter dated 12-03-2014)

Attachments: NYSDOS Letter to NRC Staff dated May 30 2014 Part I.pdf Mr. Turk, Please accept our apologies!

We have sent hard copies of the letter with attachments; however, I am also sending the first attachment in two parts.

Part one is attached to this email. Part 2 will be sent shortly.

Linda From: Turk, Sherwin [1]

Sent: Thursday, December 04, 2014 12:54 PM To: Baldwin, Linda (DOS)

Cc: IPRenewal NPEmails; Wentzel, Michael

Subject:

RE: Consistency review of the Indian Point Nuclear Generating Units Nos. 2 and 3 (Part 3 - Attachment 2 to NYSDOS Letter dated 12-03-2014)

Ms. Baldwin -

I received Part 1 and Part 2 of your E-mails; I did not receive Part 2.

Sherwin E. Turk Special Counsel for Litigation Office of the General Counsel U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O15-D21 Rockville, MD 20852 (301) 415-1533 From: Baldwin, Linda (DOS) [2]

Sent: Wednesday, December 03, 2014 5:25 PM To: Wrona, David Cc: Turk, Sherwin; Burchfield, Bobby

Subject:

Consistency review of the Indian Point Nuclear Generating Units Nos. 2 and 3 (Part 3 - Attachment 2 to NYSDOS Letter dated 12-03-2014)

Dear Mr. Wrona,

I am attaching a letter from the Department of State, sent in response to Mr. Bobby Burchfields letter to you dated November 25, 2014. The original letter will be sent via regular mail.

This email will be sent in three parts, as the original email was sent back to us due to the size of the attachments.

1

Sincerely, Linda M. Baldwin General Counsel New York State Department of State Albany - 518-474-6740 NYC - 212-417-5803 WE WORK FOR THE PEOPLE Performance

  • Integrity
  • Pride From: Threatt, Angela [3]

Sent: Tuesday, November 25, 2014 4:51 PM To: david.wrona@nrc.gov Cc: Baldwin, Linda (DOS); sherwin.turk@nrc.gov; Burchfield, Bobby

Subject:

Consistency of the Indian Point Nuclear Generating Units Nos. 2 and 3 License Renewal Application with New York State Coastal Management Program Importance: High

Dear Mr. Wrona,

I attach a letter from Bobby Burchfield to you in reference to the subject listed above. The original letter will be sent via Federal Express overnight for delivery tomorrow.

Best regards.

Angela Angela I. Threatt Legal Secretary for Bobby R. Burchfield and Matthew M. Leland McDermott Will & Emery LLP l The McDermott Building l 500 North Capitol Street, N.W. l Washington, DC 20001 Tel +1 202 756 8121 l Fax +1 202 756 8087 Website l vCard l E-mail l Twitter l LinkedIn l Blog This message is a PRIVILEGED AND CONFIDENTIAL communication. This message and all attachments are a private communication sent by a law firm and may be confidential or protected by privilege. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or use of the information contained in or attached to this message is strictly prohibited. Please notify the sender of the delivery error by replying to this message, and then delete it from your system. Thank you.

2

Please visit http://www.mwe.com/ for more information about our Firm.

3

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 4774 Mail Envelope Properties (bb829f5a8d7c493bbfe045f841d763cd)

Subject:

RE: Consistency review of the Indian Point Nuclear Generating Units Nos. 2 and 3 (Part 3 - Attachment 2 to NYSDOS Letter dated 12-03-2014)

Sent Date: 12/5/2014 3:54:45 PM Received Date: 12/5/2014 3:54:41 PM From: Baldwin, Linda (DOS)

Created By: Linda.Baldwin@dos.ny.gov Recipients:

"IPRenewal NPEmails" <IPRenewal.NPEmails@nrc.gov>

Tracking Status: None "Wentzel, Michael" <Michael.Wentzel@nrc.gov>

Tracking Status: None "Turk, Sherwin" <Sherwin.Turk@nrc.gov>

Tracking Status: None Post Office: BN1PR09MB025.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3996 12/5/2014 3:54:41 PM image001.gif 5292 NYSDOS Letter to NRC Staff dated May 30 2014 Part I.pdf 285478 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 1 file://c:\EMailCapture\IndianPointUnits2and3NonPublic_EX\4774\attch1.gif 12/11/2014

STATE OF NEW YORK D E P AR T M E N T O F S T AT E O NE COMME RCE PLAZA A NDREW M. C UOMO 99 W ASHINGTON AVENUE CESAR A. PERALES G OVERNOR ALBANY, NY 12231-0001 S ECRETARY OF S TATE May 30, 2014 Mr. David J. Wrona, Chief United States Nuclear Regulatory Commission Environmental Review and Guidance Update Branch Division of License Renewal Washington, D.C. 20555-0001 Re: Consistency of the Indian Point Nuclear Generating Units Nos. 2 and 3 (IP2, LLC and IP 3, LLC), License Renewal Application with New York State Coastal Management Program

Dear Mr. Wrona,

This letter responds to your correspondence dated December 6, 2013 to George Stafford, New York State Deputy Secretary of State, requesting consultation pursuant to 15 C.F.R. § 930.51 regarding the federal consistency review of the license renewal application for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3 respectively). These facilities are owned and operated by Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations, Inc. (Entergy). You have asked the New York State Department of State (NYSDOS) to answer six (6) questions about the federal consistency process as it relates to the IP2 and IP3 License Renewal Application, which is pending before your agency.

NRCs questions are premised on the applicability of a federal-state consultation envisioned in a federal regulation, 15 C.F.R. § 930.51(e). The consultation process only arises in the context of a federal license renewal when the original license was previously reviewed for federal consistency by the State agency and the renewal will cause an effect on any coastal use or resource substantially different than that originally reviewed by the State agency. 15 C.F.R. § 930.51(b)(3) and (e). In her August 8, 2102 letter to NRCs Eric Leeds, then NYSDOS General Counsel Susan L. Watson indicated that NYSDOS is the sole designated State agency1 authorized to conduct consistency reviews of federal agency activities pursuant to the federal Coastal Zone Management Act (CZMA). Because IP2 and IP3 have never been reviewed for consistency by this agency, NYSDOS takes the position that 15 C.F.R. § 930.51(e) is 1

L.1975, c. 464, § 47. The State Legislature appointed NYSDOS the single State agency to accept federal funding to prepare and administer the NYS CMP. The State agency is defined at 15 C.F.R. § 930.11(o). NYSDOS is the only designated State agency to review federal agency applications for federal consistency.

WWW .DOS.NY.GOV

  • E-MAIL: INFO@DOS.NY.GOV

inapplicable and that interagency consultation is not warranted. Nonetheless, as a matter of courtesy, NYSDOS will answer NRCs questions.

In accordance with the CZMA and the regulations promulgated by National Oceanic and Atmospheric Administration (NOAA), no New York State agency, except NYSDOS, has the authority to review the federal consistency of IP2 and IP3s operating license or operating license renewal applications under the CZMA. As the pointed out in NOAAs commentary when it revised the federal consistency regulations in 2000:

Section 930.6(c) is added to clarify the role of the single State agency for coordinating federal actions and the State agency's responsibility to apply all relevant enforceable policies when conducting consistency reviews.

Further, NOAA's program approval regulations require a single State agency charged with implementing federal consistency, section 923.53(a)(1), as does the existing federal consistency regulation, section 930.18. The need for a designated State consistency agency is to ensure: uniform application of a State's management program policies, efficient coordination of all management program requirements, comprehensive coastal management review, that all relevant enforceable policies are considered for a federal consistency review, that public participation requirements are met, and that there is a single point of contact for Federal agencies and the public to discuss consistency issues. The State agency coordinates consistency reviews, issues concurrences and objections, coordinates with Federal agencies, provides guidance on complying with the consistency requirement, handles appeals to the Secretary and mediation requests, etc. The State agency may rely on the expertise of other State agencies, but other State agencies may not be the designated State agency for consistency reviews, decisions, etc.2 Federal consistency reviews were not conducted for the original IP operating licenses, which predated the approval of New Yorks CMP in 1982. Here, the consistency review obligation applies to Entergys IP license renewal applications. Thus, Entergys federal consistency certification is being reviewed in accordance with 15 C.F.R. § 930.51(b)(1), which requires that [r]enewals and major amendments of federal license or permit activities not previously review by the State agency are to be reviewed for federal consistency review in accordance with 15 C.F.R Part 930 subpart D. In commenting on revised federal consistency regulations in 1979, NOAA commented:

Paragraph (b) [of 15 C.F.R. 930.51] is founded on the principle that an applicant does not have a vested right to receive approval of a renewal or a major amendment without first complying with the law existing at the time approval is sought. However, this principle must operate in the context of avoiding unnecessary State agency review. There, subparagraph (1) [of 15 C.F.R.

930.51(b)] assures the State agency of an opportunity to review licenses and permits which were originally approved by the Federal government prior to

[coastal] management program and are subject to major amendment or renewal following the [coastal] management program approval. In the event the State agency has previously reviewed a license or permit activity, further review is limited to cases where changes in [the coastal] management program provisions necessitate reevaluation of the activity (subparagraph [15 C.F.R.

2 65 Fed. Reg. 77124-01, 77128 - 77129 (Dec. 8, 2000) (emphasis added).

2

930.51(b)](2)), or the activity will be modified substantially causing new coastal zone effects (subparagraph [15 C.F.R. 930.51(b)](3)).3 The letter is organized to provide the necessary background and context for NYSDOSs responses to NRCs inquiries.

Chronology of Indian Point Licensing Indian Point Unit 2 was licensed for commercial operation by the Atomic Energy Commission (AEC), the predecessor to the NRC, for forty (40) years on September 28, 1973 with an expiration date of September 28, 2013. Unit 2 was originally licensed to the Consolidated Edison Company (ConEd),

which later sold that facility to Entergy in September 2001.

IP3 was licensed on December 12, 1975, for a 40-year period that will expire on December 12, 2015. While ConEd originally owned IP3, it was conveyed to the Power Authority of the State of New York (NYPA) during construction. NYPA operated IP3 until November 2000 when it was sold to Entergy.

Entergy purchased IP2 and IP3 in 2001 and 2000 respectively, and NRC approved the transfer of the operating licenses for these units. NYSDOS did not perform a federal consistency review of that property and license transfer.

On April 23, 2007, Entergy filed an application with the NRC to extend the commercial operating licenses for IP2 and IP3 for an additional twenty (20) years beyond the current expiration dates. Although not included with the license renewal submission, the application indicated that Entergy would submit a Coastal Management Program Consistency Certification to the New York State Department of State.4 More than 5 years later, Entergy sent a letter declaring that it had already met its federal consistency review requirement for the IP2 and IP3 license renewals.5 On July 30, 2012, Entergy filed a motion and memorandum with the NRC for a declaratory order asserting that it has already met its CZMA federal consistency requirements (15 C.F.R. Part 930 subpart D) and amending its Environmental Report (10 C.F.R. Part 53) to reflect its position that it was not obligated to take further action on the issue.6 In that correspondence, Entergy contended that the relicensing of IP2 and IP3 are exempt from federal consistency review by NYSDOS because several New York State agencies and public authorities conducted State agency consistency review in connection with State actions and/or approvals.

3 44 Fed. Reg. 37,142, 37,150 (June 25, 1979) (emphasis added).

4 See Indian Point Nuclear Generating Unit Nos. 2 and 3 - License Renewal Application (April 23, 2007) at Environmental Report Attachment D.

5 See Letter from Entergys Fred Damico to the Nuclear Regulatory Commission dated July 24, 2012 at p. 1. Entergy reassessed the Act's requirements and has determined that IP2 and IP3 already have obtained the necessary consistency reviews from the State of New York and that license renewal will not result in coastal effects that are substantially different than the effects previously reviewed by NYSDOS and other state agencies with jurisdiction under state law to make those determinations. 15 CFR 930.51 (b)(3). From this determination flows the conclusion that IP2 and IP3 require no further consistency review in connection with this proceeding 6

Motion and Memorandum from Entergy to the NRC dated July 30, 2012. In the motion, Entergy asserts purporting to amend its 2007 environmental report pursuant to 10 C.F.R. 51.45(d) and assert that IP2 and IP3 have already obtained the necessary consistency reviews from the State of New York and that no further review is required, pursuant to regulations promulgated by the U.S. Department of Commerce, National Oceanic and Atmospheric Administration in 15 C.F.R. 930.51.

3

By letter dated August 8, 2012, NYSDOSs then General Counsel Susan Watson responded to NRC indicating that Entergys contentions were without legal merit.7 Under the CMP, NYSDOS has been designated as the single State agency authorized to receive and administer grants and thereby to make consistency determinations pursuant to the CZMA and its regulations.8 Only NYSDOS can make the federal consistency determination mandated by the CZMA. It has never conducted a federal consistency review for the Indian Point Unit 2 or Indian Point Unit 3 operating license.

On August 13, 2012, NRC issued a Request for Additional Information (RAI) to Entergy concerning the consistency review of the application to renew the operating licenses for Indian Point Units 2 and 3. On September 11, 2012, Entergy responded to the RAI, reaffirming the arguments it made in its request for declaratory ruling.

On April 5, 2013, New York filed a cross-motion seeking leave to file additional exhibits and supplemental proposed findings of fact and conclusions of law. On May 20, 2013, Entergy filed a motion to supplement its July 30, 2012 motion for declaratory order.9 On June 12, 2013, the NRCs Atomic Safety and Licensing Board issued an order, granting New Yorks motion to file additional exhibits and supplemental proposed findings of fact and conclusions of law and denied the cross motions of the parties for declaratory orders on the issue of consistency review.10 It ruled:

Given that no consultation has occurred between the NRC Staff, the New York State Department of State, and Entergy pursuant to 15 C.F.R. § 930.51(e), we conclude that Entergys and New Yorks motions are premature. Accordingly, Entergys and New Yorks motions are DENIED without prejudice.

In a letter dated December 6, 2013, you wrote to Deputy Secretary of State George Stafford seeking to initiate the consultation process between federal and state agencies concerning whether renewal applications for federal activities previously reviewed and found consistent are would have substantially different coastal effects under paragraphs (b)(3), and (c) of 15 C.F.R. 930.51.11

Background:

Consistency Review in New York State The New York State Coastal Management Program (NYS CMP) was approved by U.S.

Secretary of Commerce Malcolm Baldridge and became effective on September 30, 1982. It identifies NYSDOS as the single New York State agency empowered to conduct federal consistency on behalf of the State of New York and to be eligible to receive CZMA grants to administer the States Coastal 7

See letter dated August 8, 2012 from Susan L. Watson, General Counsel, New York Department of State (NYSDOS) to Eric Leeds, Director of Nuclear Reactor Regulation, Nuclear Regulatory Commission.

8 L.1975, c. 464, § 47; 16 U.S.C. § 1456 (c) and 15 C.F.R. §§ 923.53, 930.6 and 930.10.

9 See Entergys Motion for Leave to Supplement its Motion For Declaratory Order That it Has Already Obtained the Required New York State Coastal Management Program Consistency Review of Indian Point Unit 2 and 3 for Renewal of the Operating Licenses (May 20, 2013).

10 See Atomic Safety and Licensing Board Order dated June 12, 2013. Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 at p. 4. (Emphasis in original).

11 See 15 C.F.R. 930.51(e). The determination of substantially different coastal effects under paragraphs (b)(3), and (c) of this section is made on a case-by-case basis by the Federal agency after consulting with the State agency, and applicant. The Federal agency shall give considerable weight to the opinion of the State agency. The terms major amendment, renewals and substantially different shall be construed broadly to ensure that the State agency has the opportunity to review activities and coastal effects not previously reviewed. (Emphasis added).

4

Management Program.12 IP2 and IP3 were licensed before the federal approval of the NYS CMP in 1982.

In New York, there are two kinds of consistency decisions: federal and state. The NYSDOS reviews federal agency actions for consistency under the CZMA; the state agencies review their own individual actions for State agency consistency under New York Executive Law Article 42 (Waterfront Act). Although similar, the State and federal reviews are neither identical nor substitutes for each other.

This distinction between state and federal consistency reviews is well recognized by state agencies themselves. (See NYSPSC Order in Case 70363, Iroquois Gas Transmission System; and ALJ Ruling on NYSDEC Project No. 3-5510-161-1-0 Xanadu Properties Associates).

Federal Consistency The CZMA provides coastal states and territories with the option to develop a coastal management program consisting of enforceable policies. Under the CZMA, state coastal management programs become effective upon approval of the U.S. Secretary of Commerce.13 Prior to approving a state management program, the Secretary of the U.S. Department of Commerce must find that the Governor of the State has designated a single State agency to receive grants and administer the management program.

New Yorks CMP was approved by the U.S. Secretary of Commerce, and became effective, on September 30, 1982.14 To effectuate the Programs development, the New York State Legislature appointed NYSDOS the single State agency to accept federal funding to prepare and administer the New York State Coastal Management Program (NYS CMP).15 During the 1981 legislative session, New York Governor Hugh L. Carey codified NYSDOSs responsibilities to administer the coastal program by signing the Waterfront Act, now NY Executive Law Article 42. The federally approved CMP identifies NYSDOS as the single State agency with authority to conduct federal consistency review of federal agency activities affecting New Yorks coastal area. The license renewal applications pending before the NRC (15 C.F.R. Part 54) are being reviewed by NYSDOS pursuant to 15 C.F.R. Part 930, subpart D and in accordance with 15 C.F.R. § 930.51(b)(1).16 Proposed federal actions, including permit applications, are reviewed by NYSDOS for consistency with the States 44 enforceable coastal policies. NYSDOS reviews all federal actions affecting land or water uses or natural resources of the coastal zone. If NYSDOS objects to a proposed permit activity as being inconsistent with the States coastal policies, the federal agency is barred from issuing the permit, unless the Departments decision is overridden by the US Secretary of Commerce.17 While the federal CZMA regulations provide that a State agency may designate other state agencies to conduct federal consistency reviews in particular circumstances,18the NYS CMP provides this authority 12 See NYS CMP at II-4-2 and 3; see also http://coastalmanagement.noaa.gov/mystate/ny.html.

13 See 16 U.S.C. § 1455(d); 15 C.F.R. § 923.1.

14 16 U.S.C. § 1455(d); 15 C.F.R. § 923.1. The CMP is described in a document entitled "State of New York Coastal Management Program and Final Environmental Impact Statement.

15 L.1975, c. 464, § 47.

16 Renewals and major amendments of federal license or permit activities not previously reviewed [the original operating licenses] by the State agency [DOS]. 15 C.F.R. § 930.51(b)(1).

17 16 U.S.C. § 1456(c)(3)(A); 15 C.F.R. § 930.63; and 15 C.F.R. Part 930, subpart H.

18 See 15 C.F.R. § 930.6(c).

5

solely to NYSDOS. In New York, federal consistency review is conducted by a single State agency, NYSDOS.19 In terms of State agency responsibilities to conduct consistency of federal agency actions, the NOAA has clarified the role of the single State agency for coordinating federal actions and the State agency's responsibility to apply all relevant enforceable policies when conducting consistency reviews.

The regulations provide:

(a) This section describes the responsibilities of the State agency described in § 930.11(o).20 A designated State agency is required to uniformly and comprehensively apply the enforceable policies of the State's management program, efficiently coordinate all State coastal management requirements, and to provide a single point of contact for Federal agencies and the public to discuss consistency issues. Any appointment by the State agency of the State's consistency responsibilities to a designee agency must be described in the State's management program. In the absence of such description, all consistency determinations, consistency certifications and federal assistance proposals shall be sent to and reviewed by the State agency. A State may have two State agencies designated pursuant to § 306(d)(6) of the Act where the State has two geographically separate federally-approved management programs.

(b) The State agency is responsible for commenting on and concurring with or objecting to Federal agency consistency determinations and negative determinations (see subpart C of this Part), consistency certifications for federal licenses, permits, and Outer Continental Shelf plans (see subparts D, E and I of this Part), and reviewing the consistency of federal assistance activities proposed by applicant agencies (see subpart F of this part). The State agency shall be responsible for securing necessary review and comment from other State, regional, or local government agencies, and, where applicable, the public. Thereafter, only the State agency is authorized to comment officially on or concur with or object to a federal consistency determination or negative determination, a consistency certification, or determine the consistency of a proposed federal assistance activity.

(c) If described in a State's management program, the issuance or denial of relevant State permits can constitute the State agency's consistency concurrence or objection if the State agency ensures that the State permitting agencies or the State agency review individual projects to ensure consistency with all applicable State management program policies and that applicable public participation requirements are met. The State agency shall monitor such permits issued by another State agency. (Emphasis added.)21 The NYS CMP does not describe or otherwise provide for the delegation of federal consistency review to any other State agency. In fact, it states the opposite. New York State must ensure that the above federal activities are consistent with its CMP. To that end, the Department of State (DOS) has 19 The CZMA requires that a State have a single State agency for grant administration and management program implementation (including federal consistency). CZMA §§ 306(d)(6) and 307(c)(1)(C). Further, NOAA's program approval regulations require a single State agency charged with implementing federal consistency, section 923.53(a)(1), as does the existing federal consistency regulation, section 930.18. NOAA Commentary on Final Rule revising the federal consistency provisions in 15 C.F.R. Part 930 and discussing State Responsibility. 65 Fed. Reg. 77124-01,77129-77129 (December 8, 2000).

20 15 C.F.R. § 930.11(o): The term State agency means the agency of the State government designated pursuant to section 306(d)(6) of the Act to receive and administer grants for an approved management program, or a single designee State agency appointed by the 306(d)(6) State agency.

21 15 CFR § 930.6. Section 930.6(c) is added to clarify the role of the single State agency for coordinating federal actions and the State agency's responsibility to apply all relevant enforceable policies when conducting consistency reviews.

6

been designated as the States agency responsible for reviewing federal activities as to their consistency with the CMP.22 NYSDOS has never delegated that federal consistency review function to another State agency. Cobbling together disparate State agency reviews does not approximate the federal review required by the CZMA.

Entergys insertion of the phrase or its designee into the federal consistency portion of its flowchart is therefore patently misleading. NYSDOSs federal consistencys authority has never been delegated to any other State agency at any time. Further, Entergys conclusion in its flowchart that federal and State consistency in New York State are equivalent or interchangeable reflects a gross misunderstanding of New York State law, the NYS CMP, and federal consistency.23 State Agency Consistency The CZMA requires that each federally-approved Coastal Management Program provide a mechanism to ensure that all State agencies will adhere to the program.24 This requires the coastal state to identify or adopt state legislation which binds state agencies so that State agency actions in the coastal area will be consistent with the programs enforceable coastal policies. State agency means any department, bureau, commission, board, public authority or other agency of the state, including any public benefit corporation any member of which is appointed by the governor.25 These agencies are not to be confused with NYSDOS, the single State agency for federal consistency as defined at 15 C.F.R. § 930.11(o).26 Thus the New York State Department of Environmental Conservation (NYSDEC), the New York State Public Service Commission (NYSPSC), and NYPA are all State agencies for the purpose of fulfilling the State consistency requirements of the NYS CMP.

In 1981, the Waterfront Act27 was enacted to implement and enforce the CMP at the state level.

The Waterfront Act and its regulations28 require that State agency actions within the coastal area be undertaken in a manner that is consistent with the State's coastal policies: No State agency involved in an action may carry out, fund or approve an action until it has complied with the provisions of Article 42 of the Executive Law."29 Development activities in New York's coastal area which involve direct State agency action or funding, which require state permits for actions involving an environmental impact statement under the State Environmental Quality Review Act (SEQRA), or which are located within a local waterfront revitalization program, must be determined by the State agency undertaking the action to be consistent with the coastal policies in the Waterfront Act or in the local program.

New York State agencies, as defined in Executive Law § 911 (5), must comply with the State consistency review obligation in the New Yorks coastal areas and inland waterways. NYSDEC, 22 NYS CMP at II-9-8.

23 See Letter dated September 11, 2012 from Fred R. Dacimo, VP License Renewal, Entergy Northeast Nuclear to the U.S.

Nuclear Regulatory Commission Response to Request for Additional Information for Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application Environmental Review - Compliance with Coastal Zone Management Act Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 at p. 271 of 282. (Entergy RAI Response).

24 16 U.S.C. § 1455(d)(15); 15 C.F.R. §§ 923.1(c)(8) and 923.40.

25 See Executive Law § 911(5).

26 15 C.F.R. § 930.11(o) defines the terms State agency to means the agency of the State government designated pursuant to section 306(d)(6) of the Act to receive and administer grants for an approved management program, or a single designee State agency appointed by the 306(d)(6) State agency.

27 Executive Law Article 42, added by Chapters 840 and 841 Laws of 1981.

28 19 NYCRR Part 600 and § 600.4.

29 19 NYCRR §600.3.

7

NYSPSC and NYPA are among the state agencies which must comply with the consistency requirement of Executive Law Article 42 when their actions occur within the coastal area.30 State consistency procedures require that a State agency determine that its own direct action or a permit or license issuance is consistent to the maximum extent practicable with the 29 state coastal policies.31 State agency consistency review pursuant to Executive Law only reflects 29 of the 44 enforceable policies of the federally approved NYS CMP. The remaining 15 coastal policies are made enforceable through a large compilation of New York State statutes with which state agencies must comply; these statutes are listed following the policy explanations in the NYS CMP. If a State agency is able to make determination of consistency as it relates to its own State agency action, that finding constitutes the State agency's determination of consistency as required by Article 42 of the Executive Law. NYSDOS does not review that State agency consistency determination.

Differences between Federal and State Consistency Reviews Review by New York State agencies for consistency is fundamentally different from NYSDOS's federal consistency review under the federal CZMA. In New York, each State agency is responsible for determining the consistency of its own actions with the coastal policies according to the regulations set forth in 19 NYCRR Part 600. The State agencies acting under NY Executive Law Article 42 are self-policing when conducting their consistency reviews.

State consistency is a limited, self-contained review of the State agencys own action. Except for NYSDOS, State agencies cannot review for consistency the actions of any other New York State agency, let alone actions of federal agencies. In instances where two or more State agencies share jurisdiction over a proposed action, each agency must render its own consistency determination.

Moreover, under federalism principles, NY Executive Law Article 42 cannot give state agencies authority to review for consistency federal agency activities where federal law does not. Only pursuant to the congressionally enacted CZMA can States attain the authority to review federal agency actions.

The CZMA confers that review authority on a single State agency. In New York, the single State agency for federal consistency review is NYSDOS.

State and federal agencies often have different regulatory responsibilities regarding a particular project when issuing licenses or authorizations but they do not overlap.32 NYSDOS is the designated single State agency empowered to review federal agency actions for federal consistency. New York State did not have a federally-approved CMP at the time the original operating licenses for IP2 and IP3 were issued. This license renewal requires NYSDOS to conduct federal consistency review -- for the first time.

NYSDEC, NYSPSC and NYPA conducted separate State agency consistency reviews when the Indian Point Generating Stations were transferred to Entergy or when decisions on state permit applications were made. However, neither the NYSPSC, nor NYSDEC nor the State authority NYPA is or was authorized to make or issue consistency determinations under the CZMA that are binding on federal agencies.

30 NYSDOS is also an Executive Law § 911(5) State agency for the purposes of conducting State consistency review of its own State agency actions, such as the designation of a Significant Coastal Fish and Wildlife Habitat as part of a Routine Program Change to the NYS CMP.

31 Executive Law Article 42; 19 NYCRR § 600.5 32 The laws and regulations of the United States are the law of the land under the Supremacy Clause, and conflicting state laws are either preempted or ineffective.

8

Consistency Review of Entergys Application to Renew the IP Operating Licenses On December 17, 2012, Entergy submitted to NYSDOS a Consistency Certification for the renewal of the operating licenses for IP2 and IP3. 33 The certification and supporting information comprise 11 volumes. NYSDOS deemed the certification incomplete because the Supplemental Environmental Impact Statement (SEIS) for Aquatic Impacts of the plant had not yet been issued by NRC. 34 On June 20, 2013, the SEIS was received and NYSDOSs consistency review of the application for renewal of the commercial operating licenses for the nuclear facilities commenced. 35 NYSDOS is reviewing Entergys federal consistency certification in accordance with 15 C.F.R. § 930.51(b)(1),

which requires that [r]enewals and major amendments of federal license or permit activities not previously reviewed by the State agency are to be reviewed for federal consistency review in accordance with 15 C.F.R Part 930 subpart D.

NYSDOS and Entergy have entered into stay agreements with respect to federal consistency review to allow for consideration of new information.36 A second stay agreement was executed on January 9, 2014 that expires on October 20, 2014; NYSDOSs federal consistency decision is due on or before December 31, 2014.37 License Transfers Pursuant to Atomic Energy Act Licensed by the Atomic Energy Commission on September 28, 1973, IP238 was sold by ConEd to Entergy in September 2001. IP339 was licensed by the NRC on December 12, 1975, to ConEd which later conveyed it to the Power Authority of the State of New York (PASNY - the predecessor to the New York Power Authority (NYPA)). NYPA operated IP3 until November 21, 2000, when it transferred its ownership interest in, and operating/maintenance responsibility for, the IP3 plant to Entergy.

Unlike operating license and license renewal, NRCs consent to permit the transfer of an existing licenses and property transfers pursuant to 10 C.F.R. Part 2 and 5040 is not a listed federal agency activity in the NYS CMP. State agencies involved in State approvals - NYPA, NYSDES and NYSPSC

- conducted SEQRA and State agency consistency reviews. for the facility transfers to Entergy.

NYSDOS did not review for federal consistency the transfer of ownership of Units 2 and 3; this should be borne out by the NRC's records.

Transfers of title to property have already been previously determined by the federal court to not be subject to federal consistency review.41 As a federal court stated: Mere transfer of title cannot directly affect the coastal zone, so no CZMA consistency determination is required.42 License and 33 See Letter from Fred Dacimo, Vice President, License Renewal, Entergy to NYSDOS Secretary of State Cesar A. Perales dated December 17, 2012. (Attachment 1).

34 See Letter from Fred Anders, Chief, NYSDOS Natural Resources Management Bureau to Fred Dacimo, Vice President, License Renewal, Entergy dated January 16, 2013. (Attachment 2).

35 See Letter from Jeffrey Herter, Assistant Chief, NYSDOS Natural Resources Management Bureau to Fred Dacimo, Vice President, License Renewal, dated June 28, 2013. (Attachment 3).

36 See Stay Agreement between NYSDOS and Entergy beginning on October 9, 2013 and ending on January 9, 2014.

(Attachment 4).

37 See Stay Agreement between NYSDOS and Entergy beginning on January 9, 2014 and ending on October 20, 2104 with a federal consistency decision due on or before December 31, 2014. (Attachment 5).

38 Facility Operating License No. DPR-26.

39 Facility Operating License No. DPR-64.

40 10 C.F.R. §§ 50.80 and 50.90. See 42 U.S.C. §§ 2201(b), 2201(i), 2201(o), and 2234.

41 See Ono v. Harper, 592 F.Supp. 698 (D.Haw.1983) 42 Id. 592 F. Supp. at 700.

9

property transfers of nuclear facilities to a responsible entity are not usually expected have an appreciable effect on the coastal area. Notably, the NRC has determined that operating license transfers are a categorically exempt action pursuant to the National Environmental Policy Act (NEPA); the operating license transfers are considered a ministerial act that do not have an effect on the environment.43 In general, license transfers do not involve any technical changes to plant operations. Rather, they involve changes in ownership or partial ownership of facilities at a corporate level. Section 184 of the Atomic Energy Act of 1954, as amended (AEA), specifies, however, that:

[N]o license granted hereunder * *

  • shall be transferred, assigned, or in any manner disposed of, either voluntarily or involuntarily, directly or indirectly, through transfer of control of any license to any person, unless the Commission shall, after securing full information, find that the transfer is in accordance with the provisions of this Act, and shall give its consent in writing. (42 U.S.C. 2234; 10 C.F.R. 30.34 (b), 40.46, 50.80, 72.50)44 In fact, the NRC distinguishes between a license transfer (10 C.F.R. Part 2 subpart M) and a license renewal (10 C.F.R. Part 54) by relegating the two distinct processes to different regulatory sections and by exempting license transfers from NEPA review. The NRC does not subject a license transfer (10 C.F.R. Part 2 subpart M) to the same kind of comprehensive review as that associated with the issuance of an operating license (10 C.F.R. Parts 50 and 51) or a license renewal (10 C.F.R. Part 54).

This view is buttressed by the fact that the NRC requires all license renewal applications to undergo the 10 C.F.R. Part 54 evaluative process prior to obtaining a renewal license. A license transfer, unlike an application for a license renewal,45 does not require the completion of an Environmental Report. The NRC remarked:

Further, under its procedures for implementing NEPA, the Commission may exclude from preparation of an environmental impact statement, or an environmental assessment, a category of actions which do not individually or cumulatively have a significant effect on the human environment and which have been found to have no such effect in NRC proceedings. In this rulemaking, the Commission finds that the approval of a direct or indirect license transfer, as well as any required administrative license amendments to reflect the approved transfer, comprises a category of actions which do not individually or cumulatively have a significant effect on the human environment. Actions in this category are similar in that, under the AEA and Commission regulations, transfers of licenses (and associated administrative amendments to licenses) will not in and of themselves permit the licensee to operate the facility in any manner different from that which has previously been permitted under the existing license. Thus, the transfer will usually not raise issues of environmental impact that differ from those considered in initial licensing of a facility. In addition, the denial of a transfer would also have in and of itself no impact on the environment, since the licensee would still be authorized to operate the facility in accordance with the existing license.46 Contrary to Entergys contentions, NRCs approval of the transfer of the licenses did not involve any inquiry into the operations of the nuclear power facilities, the key element in issuing and renewing 43 See 10 C.F.R. § 51.22(c)(21).

44 Final Rule, Streamlined Hearing Process for NRC Approval of License Transfers, 63 Fed. Reg. 66721, 66722-66723 (Dec. 3, 1998).

45 10 C.F.R. Part 51.

46 Id, 63 Fed. Reg. at 66728.

10

operating licenses. No federal consistency of the operating licenses for IP2 or IP3 has ever taken place.

As a consistency determination was not conducted prior to issuance of the operating licenses in 1973 and 197547, and no intervening consistency review of those operating licenses has occurred, IP has not been previously reviewed for purposes of 15 C.F.R. § 930.51 (b). That review is required now.

State Consistency Reviews of the Transfer of IP Facilities NYSPSC and NYPA conducted separate State agency consistency reviews on their individual actions, detailed below, when the Indian Point Generating Stations were transferred to Entergy. Later, NYSDEC conducted a State agency consistency review under the Waterfront Act prior to its approval of the SPDES application. These are discussed below.

NYSPSC -PSL § 70 review - IP2 IP2 was originally licensed to ConEd. In 2001, in accordance with NY Public Service Law § 70, the NYSPSC reviewed ConEds proposed transfer of the retired IP1 unit and active IP2 assets and franchise to Entergy. That statute ensures that no electric corporation shall transfer or lease its franchise, works or system ...to any other person or corporation or contract for the operation of its works and system, without the written consent of the [NY Public Service] commission. The statute only addresses the transfer of stock, works and system. Nothing in the implementing regulations refers to the operations of the facility generating the electricity.48 In accordance with its obligations under SEQRA and the Waterfront Act, NYSPSC reviewed for State agency consistency the proposed transfer of the stock, works and systems associated with IP1 and IP2 from Con Ed to Entergy. On August 17, 2001, the NYSPSC issued an order adopting and approving a Final Supplemental Environmental Impact Statement (FSEIS) which included a State agency consistency of the transfer of ConEds interests in IP1 and IP2 to Entergy. NYSPSCs State agency consistency review concerned the matter at hand -- the transfer of stock, works and system -- and concluded that the simple transfer of these interests from a utility to a merchant plant owner, which did not review, change or extend the operations or underlying license of the nuclear facilities, did not implicate the coastal policies of 19 NYCRR § 600.5. The internal operations of IP1 and IP2 and their operating licenses were not addressed in that review.

NYPA - PSL § 70 review - IP3 NRC originally licensed IP3 to ConEd on December 12, 1975, which subsequently conveyed it to the Power Authority of the State of New York (PASNY - the predecessor to the New York Power Authority (NYPA)). PASNY/NYPA, a public authority, operated IP3 until November 2000 when it was sold to Entergy.

As then-owner of IP3, NYPA prepared a consistency certification in connection with its State Environmental Quality Review Act (SEQRA)49 negative declaration for the proposed sale and transfer of its license and the physical facilities comprising IP3 to the buyer, Entergy. NYPA concluded that its sale was in accordance with State coastal policies. NYPA submitted a federal consistency assessment form (FCAF) to NYSDOS for the sale and license transfer.50 As discussed later, NYSDOS did not conduct a federal consistency review of the sale and transfer of the license of IP3 to Entergy since NRC 47 New York did not have an approved CMP until 1982. Prior to that approval, consistency review of federal agency actions could not be conducted.

48 16 NYCRR Article 3, Part 31.

49 NY Environmental Conservation Law Article 8.

50 See FCAF for IP3, LLC and James A. FitzPatrick as prepared by William Slade dated January 6, 2000.

11

nuclear license transfers are unlisted actions in the NS CMP51 and are not expected to have reasonably foreseeable effects on coastal uses or resources.52 NYPA did not conduct, nor did it have the authority to conduct, a federal consistency review of the operating license for the IP3 nuclear facility. NYPA simply reviewed its own transfer of the facility to Entergy in accordance with the Waterfront Act. This State consistency review does not, as Entergy contends, serve as a previous federal consistency review for purposes of 15 C.F.R. §930.51(b)(2) or (3).

NYSDEC - ECL Article 17 - State Pollutant Discharge Elimination System (SPDES) Permit Review Because SPDES permits are issued pursuant to state law,53 SPDES permits are subject to State consistency review. In April 1982, NYSDEC issued a 5 year SPDES permit for the Indian Point nuclear power plants and the Roseton and Bowline Point fossil fuel power facilities. On October 1, 1987, NYSDEC renewed the 5 year SPDES permit for the generating stations. NYSDEC completed State agency consistency reviews in connection with the SPDES permits as part of its Waterfront Act obligations. Prior to the expiration date in 1992, however, the owners of the facilities at that time, Consolidated Edison and NYPA, submitted timely SPDES permit renewal applications to NYSDEC and, by operation of State Administrative Procedure Act (SAPA) §401, the 1987 SPDES permit for IP2 and IP 3 is remains in effect. On May 20, 1992, NYSDEC required the utilities to prepare an environmental impact statement regarding the 1992 applications for SPDES permit renewals. In December 1999, the utilities submitted a revised Draft Environmental Impact Statement ("DEIS"). The DEIS was accepted by NYSDEC staff on February 28, 2000 as being adequate for public review.

When Entergy purchased IP2 and IP3 in 2001 and 2000, respectively, the 1987 (SAPA extended)

SPDES permit for the facilities was subsequently transferred to Entergy. NYSDEC completed State consistency review required by19 NYCRR 600.4 in 2000 as a component of the review of the transfer of the IP SPDES permit from NYPA and ConEd to Entergy.

The final environmental impact statement was prepared by NYSDEC and adopted on June 25, 2003. NYSDEC completed State agency consistency reviews pursuant to the Waterfront Act during its 2000 and 2003 environmental review. Neither involved a federal consistency determination as the actions did not involve a federal agency action. NYSDECs State agency consistency reviews do not serve as a previous federal consistency review for purposes of 15 C.F.R. 930.51(b)(2) or (3).

Conclusion Since and including the time the IP2 and IP3 operating licenses were issued in the 1970s, no federal consistency review has been conducted. Moreover, there has been no federal or State consistency review that has inquired into the terms of the operating license. The ministerial license transfer process conducted in 2000 and 2001 pursuant to 10 C.F.R. Part 2 subpart M is separate and distinct from the comprehensive review required under the NRCs relicensing regulation in 10 C.F.R. Part 54. The 51 See 15 C.F.R. 930.54(a). NYPAs completion of a FCAF for federal consistency was indicative of its role as an applicant pursuant to 15 C.F.R. 930.57. NYPA did not conduct and had no authority to conduct a federal consistency review of sale and transfer of IP3 under the CZMA.

52 The procedures for a coastal state to review for federal consistency an unlisted activity are provided to ensure that State agencies are afforded an opportunity to review federal license or permit activities with reasonably foreseeable coastal effects. 15 C.F.R. 930.54(f). A designated State agency may opt not to review an unlisted federal license or permit activity if it determines that the activity will not have reasonably foreseeable coastal effects. The license transfer for IP3 was an unlisted action in the NYS CMP.

53 Environmental Conservation Law (ECL) Article 17, Title 8.

12

operating licenses and the operations of the nuclear facilities were certainly not reviewed by any State agency in 2000 nor 2001. The State consistency review conducted by NYPA involved solely the sale of its license and nuclear assets to IP3. NYSPSCs review of the transfer of the franchise, works or system of IP2 did not involve a review of the operating license. Nor did NYSDECs State consistency review of the transfer of the SPDES permit from NYPA and Consolidated Edison to Entergy pertain to the IP operating licenses.

In conclusion, NYSDOS is the sole designated State agency54 authorized to conduct consistency reviews of federal agency activities pursuant to the CZMA. As IP2 and IP3 have never previously been reviewed by NYSDOS for consistency by this agency, 15 C.F.R. § 930.51(e) is inapplicable and interagency consultation is not applicable here.

NYSDOSs responses to the NRCs six inquiries are submitted as an enclosure along with this letter.

Sincerely, Linda M. Baldwin General Counsel Enc. : See Letter from Fred Dacimo, Vice President, License Renewal, Entergy to NYSDOS Secretary of State Cesar A. Perales dated December 17, 2012 : Letter from Fred Anders, Chief, NYSDOS Natural Resources Management Bureau to Fred Dacimo, Vice President, License Renewal, Entergy dated January 16, 2013 : Letter from Jeffrey Herter, Assistant Chief, NYSDOS Natural Resources Management Bureau to Fred Dacimo, Vice President, License Renewal, dated June 28, 2013 : Stay Agreement between NYSDOS and Entergy beginning on October 9, 2013 and ending on January 9, 2014 : Stay Agreement between NYSDOS and Entergy beginning on January 9, 2014 and ending on October 20, 2104 with a federal consistency decision due on or before December 31, 2014 : 2001 NYS CMP Routine Program Change : 2006 NYS CMP Routine Program Change : Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3 LLC v. New York State Dept. of State, 42 Misc. 3d 896 (Supreme Ct. [Albany Cty.]) Dec. 13, 2013.

54 L.1975, c. 464, § 47. The State Legislature appointed NYSDOS the single State agency to accept federal funding to prepare and administer the NYS CMP. The State agency is defined at 15 C.F.R.§ 930.11(o). NYSDOS is the only designated State agency to review federal agency applications for federal consistency.

13

STATE OF NEW YORK D E P AR T M E N T O F S T AT E O NE COMME RCE PLAZA A NDREW M. C UOMO 99 W ASHINGTON AVENUE CESAR A. PERALES G OVERNOR ALBANY, NY 12231-0001 S ECRETARY OF S TATE NYSDOS Responses to NRCs Six Inquiries NRC INQUIRY # 1 Further, the CMP states that NYSDOS will evaluate the consistency determinations made by State agencies and, when appropriate, advise the State agencies on the consistency of such actions with the coastal policies (CMP Part II,

§ 11-4 at 3 (1982)).

Please describe the process by which NYSDOS evaluates the consistency determinations made by State agencies. Specifically, please describe how a consistency determination is made, NYSDOS's role in making a determination, and how NYSDOS advises State agencies on the consistency of actions with the New York State CMP. Please describe how NYSDOS documents such coordination with State agencies.

1. How does DOS evaluate the consistency determinations made by other state agencies?

NYSDOS has no authority to correct or override the decisions of state agencies undertaken in accordance with Executive Law Article 42 and the 19 NYCRR Part 600 regulations. On its own initiative, or when requested by a State agency, NYSDOS may provide comments or guidance to state agencies on the consistency of actions pending before them.

NYSDOS does not as a routine procedure consult with other state agencies when they are conducting State consistency reviews. If requested to consult or provide assistance to another State agency, NYSDOS readily does so. Such requests are infrequent.

Each State agency is required to conduct its own review and file the certification of consistency with the Secretary of State at the time of making its decision on the action. 19 NYCRR § 600.4. Also, if the review was subject to a final environmental impact statement pursuant to SEQRA, the State agency must make a written finding that the action is consistent with applicable state coastal policies set forth in 19 NYCRR 600.5.1 The final environmental impact statement must be filed with the Secretary of States office. 2 NYSDOS monitors the 1

6 NYCRR § 617.11 (e).

2 6 NYCRR § 617.12 (b)(7).

1

consistency certifications and environmental impact statements filed by state agencies in the office. A formal evaluation is not conducted.

Executive Law § 913 sets forth the NY Secretary of States responsibilities with respect to advising the Governor and the various state agencies about coastal matters. It provides in pertinent part:

§ 913. Functions; powers and duties. The secretary shall have the following functions, powers and duties:

1. To advise the governor and agencies of state government concerning planning, programs and policies for the achievement of wise use of the land and water resources of coastal areas and inland waterways, giving full consideration to ecological, cultural, historic, aesthetic values and the needs for economic development and to encourage public and private institutions to preserve, protect, enhance, develop and use coastal and inland waterway resources in a manner consistent with the purposes and policies of this article.
4. To review, evaluate and issue recommendations and opinions concerning programs and actions of state agencies which may have the potential to affect the policies and purposes of this article, including but not limited to, programs within the jurisdiction of the departments of state, agriculture and markets, environmental conservation, public service, commerce and transportation, the offices of energy and parks and recreation and the office of general services.

In accordance with the Waterfront Act, each State agency is responsible for determining the consistency of its own actions with coastal policy according to the procedures set forth in the regulations promulgated by the Department of State at 19 NYCRR Part 600. State agencies are self-policing when conducting their consistency reviews. There is no process comparable to NYSDOS federal consistency review for State consistency.

2. How is a consistency determination made?

The Waterfront Act and its regulations require that State agency actions within the coastal area be undertaken in a manner that is consistent with the State's coastal area policies. The regulations declare: No State agency involved in an action may carry out, fund or approve an action until it has complied with the provisions of Article 42 of the Executive Law."3 State agencies, as defined in Executive Law § 911 (5), must comply with the State consistency review obligation. According to this definition, State agency includes any department, bureau, commission, board, public authority or other agency of the state, including any public benefit corporation any member of which is appointed by the Governor. Development activities in New York's coastal area which involve direct State agency action or funding, which require state permits for actions involving an environmental impact statement under SEQRA, or which are located within a local waterfront revitalization program, must be determined by the State agency undertaking the action to be consistent with the coastal policies in the Waterfront Act regulations 3

19 NYCRR § 600.3.

or in the local program. As discussed above, NYSDOS does not make the state consistency determination for other State agencies or review them.

State Agency Direct Actions Executive Law Section 919 provides that "actions directly undertaken by State agencies within the coastal area including grants, loans or other funding assistance, land use and development, or planning, and land transactions, shall be consistent with the coastal area policies of this article." This provision of law effectively ties together the programs of state agencies by binding their actions to the coastal policies. Only those direct State agency actions which are considered to Type I or unlisted in accordance with SEQRA must comply with the consistency review obligation. 19 NYCRR §§ 600.3 and 600.4. The State agency action is measured against the statements of policy set forth in the regulations implementing the Waterfront Act. 19 NYCRR § 600.5. If a direct State agency action is conducted in a municipality on either a coastal or inland waterway with a local waterfront revitalization program which has been approved by the Secretary of State, the state action must be consistent "to the maximum extent practicable" with the local program. Executive Law § 915 (8).4 Direct State agency actions can include funding or construction of structures, highways or other capital projects, conveyance of state lands including underwater lands, and acquisition of open space areas and other interests in land and state planning activities.

State Permitting Actions State agency actions in the coastal area which involve the issuance of permits or other approvals are required to go through a consistency review if the action is the subject of a final Environmental Impact Statement (FEIS) pursuant to SEQRA. (19 NYCRR § 600.4(a); 6 NYCRR § 617.5(d), 617.9(e)). The SEQRA regulations provide that no State agency shall make a final decision on the action until it has made a written finding that it is consistent with the coastal policies set forth in 19 NYCRR § 600.5. (6 NYCRR § 617.9(e)).

State agency actions, including permit actions, which are likely to affect the policies and purposes of a community's approved LWRP, are required to be conducted in a manner which is consistent to the maximum extent practicable with the local program. Executive Law §§ 915(8) and 916(1)(a). The consistency requirement is also applicable to State agency actions in municipalities on inland waterways with an approved local program.

State Consistency Procedures Both the Waterfront Act and SEQRA impose separate but interrelated responsibilities on state agencies to act in a manner which is consistent with the state coastal policies or with those of an approved local waterfront revitalization program.

1. Waterfront Act 4

See 19 NYCRR § 600.4(c).

Each State agency is responsible for determining the consistency of its actions with coastal policy according to the procedures set forth in the regulations promulgated by the Department of State at 19 NYCRR Part 600.

Initially, the State agency must determine if the action is located within the coastal area.

If the action is within the coastal area, and the action is either a Type I or unlisted action as defined in SEQRA, the agency must prepare a State Coastal Assessment Form (SCAF) prior to the determination of environmental significance. A CAF is a form used by a State agency to assist it in determining the consistency of an action. Information requested on the CAF generally pertains to whether a proposed action may have a significant effect on use of coastal shorelands or underwater lands, recreational opportunities, coastal flooding or erosion, public access or visual quality, commercial or recreational fishing, historic or archeological features, existing water dependent uses or special management areas. Reference should be made to the CMP when completing the form. If any question on the SCAF is answered "yes", a brief and concise description of the nature and extent of the action must be provided. In some instances, a copy of the SCAF must be filed with the Secretary of State for actions that do not require preparation of a final environmental impact statement.5 The completion of a SCAF is required to evaluate the consistency of State agency actions in the coastal area. The CAF also supplements other information used by that agency in making the determination of the environmental significance of the action. Where a positive declaration is made pursuant to SEQRA, the State agency is required to comply with the applicable consistency requirements of the SEQRA regulations. Where a negative declaration is made, the SCAF aids in the preparation of the consistency certification. The agency, at the time of its decision on the action, must file a certification with the Secretary of State that the action will not hinder the achievement of any state coastal policies and whenever practicable, will advance one or more of those policies.6 In instances where more than one State agency is involved in an action, each agency must make its own separate consistency determination.

Under Executive Law Article 42, there is a balancing approach to State agency consistency with coastal policies. When it becomes clear that a proposal will substantially hinder one or more coastal policies, the agency may only undertake the activity if it certifies that:

(1) no reasonable alternatives exist which would permit the action to be taken in a manner which would not substantially hinder the achievement of such policy; (2) the action taken will minimize all adverse effects on such policies to the maximum extent practicable; (3) the action will advance one or more of the other coastal policies; and (4) the action will result in an overriding regional or statewide public benefit.

5 19 NYCRR § 600.4.

6 19 NYCRR § 600.4(b), (c).

A separate but similar procedure has been established in the regulations for the review of a State agency action within the boundary of a community with an approved local waterfront revitalization program, where the action is one which has been identified by the Secretary pursuant to Executive Law § 916(1) and a negative declaration has been issued.7 Where a finding of a potentially significant impact has been issued, the action will be reviewed under SEQRA procedures. If the action would substantially hinder the achievement of the policies or purposes of an approved local waterfront revitalization program, the State agency may not undertake the action until it certifies that no reasonable alternatives exist, the action will to the maximum extent practicable minimize all adverse effects on the local policy and the action will result in an overriding regional or statewide benefit.8 Such certification constitutes a determination that the action is consistent to the maximum extent practicable with the approved local program.

Each State agency is required to file the certification of consistency with the Secretary of State at the time of making its decision on the action.9 Filing of the certification completes the consistency review process.

2. SEQRA The Coastal Management Program relies upon SEQRA as a means for implementing the consistency requirements of Article 42 of the Executive Law. In the Waterfront Act, the State Legislature directed the Commissioner of Environmental Conservation to amend the SEQRA regulations to assure adequate consideration of impacts on the use and conservation of coastal resources.10 Various amendments were made to the SEQRA regulations to assure that state agencies actions in the coastal area comply with the State's coastal policies or those of an approved local program.
3. What is NYSDOSs role in a State agency determination?

As discussed above, NYSDOS does not have a formal role in the State agency consistency reviews conducted by other state agencies. On an informal basis, NYSDOS may offer advice when requested by a State agency. NYSDOS does not review, approve or override a State agencys determination of State consistency.

NYSDOS itself is also an Executive Law § 911(5) State agency for the purposes of conducting State consistency review of its own State agency actions, such as the designation of a Significant Coastal Fish and Wildlife Habitat as part of a Routine Program Change to the NYS CMP. As a State agency, NYSDOS conducts State agency consistency review of its own action should it potentially affect the coastal area. NYSDOS follows the same procedures for state agencies described above.

7 19 NYCRR § 600.4(c).

8 Id.

9 19 NYCRR § 600.4 (c) and (d).

10 Executive Law § 919(3).

4. How does NYSDOS advise State agencies on the consistency of their actions with the CMP?

As explained previously, upon request, the consistency staff at NYSDOS will speak with the staff at another State agency about the application of the coastal policies to proposed actions in the coastal area or in municipalities with LWRPs located on coastal and inland waterways.

Due to statutory time constraints, NYSDOSs federal consistency determination frequently precedes the State consistency review conducted by state agencies, which take guidance and advice from NYSDOSs evaluation of the coastal effects of a proposed action. The CZMA requires that NYSDOS usually concur with or object to a proposed federal activity within six (6) months from receipt of the certification unless a stay has been entered.11

5. How does NYSDOS document such coordination?

When solicited, NYSDOS staff typically provide informal guidance to another State agency about a particular consistency review over the telephone. NYSDOS does not require that such calls be documented.

NRC INQUIRY # 2 On July 24, 2012, Entergy submitted a supplement to its application for renewal of the IP2 and IP3 operating licenses. In its supplement, Entergy reevaluated the status of its compliance with the CZMA. In its reevaluation, Entergy concluded that IP2 and IP3 have already obtained the necessary consistency reviews from the State of New York and that license renewal will not result in coastal effects that are substantially different than the effects previously reviewed by NYSDOS and/or other State agencies with jurisdiction under State law to make those determinations. Entergy based this conclusion, in part, on the assessment of coastal effects evaluated in the following four New York State documents:

  • New York Power Authority's (NYPA) environmental review (including the State Environmental Quality Review Act (SEQRA) negative declaration, Federal consistency certification, and State coastal assessment, if any) on the proposed sale of NYPA's IP3 to Entergy (March 31, 2000).
  • New York Public Service Commission's (NYSPSC) Final Supplemental Environmental Impact Statement (FSEIS), on the transfer of IP1 and IP2 from Consolidated Edison to Entergy (August 17, 2001).

11 16 U.S.C. § 1456

  • NYSDEC's Final Environmental Impact Statement (FEIS) concerning applications to renew the SPDES permits for Hudson River power plants, including IP2 and IP3 (June 25, 2003).

For each of the four environmental reviews listed above, please indicate, separately, whether NYSDOS considers a consistency review to have been conducted by NYSDOS and/or another NYS office or agency. For each review, please state (a) which office or agency conducted that review, (b) whether that office or agency was authorized to conduct such review (including the statutory or regulatory bases for such authority), (c) the scope of the review (including both the activities reviewed and the resources affected by those activities), (d) whether NYSDOS evaluated the consistency determination made by the other State office or agency, and (e) whether NYSDOS provided comments or advice (or declined to provide comments or advice) to that office or agency on the consistency of such actions with the State's CMP. If NYSDOS considers that a consistency review was not conducted for any of the four matters listed above, please describe why a consistency review was not necessary or was not conducted for that particular action.

NYSDOS RESPONSE:

In each of the four matters listed in the question, a State agency consistency review was completed by the respective State agency. No federal consistency review was conducted in any of the four matters. NYSDOS did not conduct any of the State agency consistency reviews. None of the four reviews referenced were conducted pursuant to the CZMA or the implementing federal regulations governing federal consistency substantive and procedural requirements.12 A State agency consistency review is not a substitute for a federal consistency review of federal agency actions conducted by NYSDOS under the federally approved NYS CMP.

For each State consistency review noted in NRCs question, NYSDOS responds as follows:

  • New York Power Authority's (NYPA) environmental review (including the State Environmental Quality Review Act (SEQRA) negative declaration, Federal consistency certification, and State coastal assessment, if any) on the proposed sale of NYPA's IP3 to Entergy (March 31, 2000).

(a) which office or agency conducted that review.

NYPA is the State public authority that conducted the State consistency review of its own actions pursuant to Executive Law § 919(1) and 19 NYCRR § 600.4. NYPAs review also included the transfer of its James A. FitzPatrick Nuclear Power Plant in Scriba, New York to Entergy. Prior to its 2008 license renewal, Entergy complied with its federal consistency obligations by filing a certification with NYSDOS for its license renewal application for 12 See 16 U.S.C. § 1456(c)(3)(A); 15 C.F.R. Part 930 subpart D.

FitzPatrick.13 As discussed previously nuclear license transfer is an unlisted federal license or permit activity under the NYS CMP. NYSDOS did not request authorization from the NOAA Administrator to conduct a federal consistency review for the license transfer of IP3 from NYPA to Entergy pursuant to 15 C.F.R. Part 930 subpart D, and such a review is considered ministerial under NRC regulations. Moreover, the simple transfer of ownership of IP3 did not have reasonably foreseeable effects on any coastal use or resource.14 As required pursuant to Executive Law § 919(1) and 19 NYCRR § 600.4, NYPA completed a SCAF for the license transfers of IP3 and FitzPatrick to Entergy, a Type I SEQRA action, to inform its decision-making regarding a determination of significance.15 NYPA completed Part 1 of the SEQRA Full Environmental Assessment Form, and concluded that [t]he project will not result in any large and important impact(s) and. therefore, is one which will not have a significant impact on the environment, therefore a negative declaration will be prepared accompanied by an explanatory addendum.16 In reaching its negative declaration, NYPA concluded: Physically, there will be no difference in facility operation before and after the sale.

No operational or physical changes will be made. Virtually the only change will be a substitution of upper management. The staff, the operating procedures and the legal requirements for operation will not change.17 Therefore, NYPA determined that the proposed action described below will not have a significant effect on the environment and a Draft Environmental Impact Statement will not be prepared.18 NYPA conducted the environmental reviews for the sale of IP3 and its other nuclear facilities and submitted a federal consistency assessment form (FCAF) to NYSDOS for the 13 The James A. FitzPatrick Nuclear Power Plant is located in Scriba, NY. The NRC license transfer joint application process included both FitzPatrick and IP3, LLC from NYPA to Entergy. NYSDOS issued a federal consistency concurrence for FitzPatrick on July 24, 2008.

14 See 15 C.F.R. 930.54(a). On December 3, 1998, the NRC In general, license transfers do not involve any technical changes to plant operations. Rather, they involve changes in ownership or partial ownership of facilities at a corporate level. 63 Fed. Reg. 66,721; Negative Declaration, Notice of Determination of Non-Significance for IP3, LLC and FitzPatrick, as prepared by William Slade for NYPA, Lead Agency, March 31, 2000, p. 2. The sale, when completed, will involve the transfer to and assumption by Entergy of the ownership and operation of IP3 & JAF in the same manner as provided for in the state & federal licenses, permits, & approvals currently in effect for these facilities.

15 The State CAF, which is a State agency completes pursuant to 19 NYCRR § 600.4, is not to be confused with the FCAF, which an applicant for a federal agency authorization completes and submits to the federal agency and NYSDOS pursuant to 15 C.F.R. § 930.57.

16 See 6 NYCRR § 617.6(a). State Environmental Quality Review Full Environmental Assessment Form for the Sale of Indian Point 3 and James A. FitzPatrick Nuclear Power Plants, completed by William Slade, NYPA (Lead Agency), January 6, 2000; see also Addendum to Environmental Assessment, Proposed Action; The Sale of the Indian Point 3 and the James A. FitzPatrick Nuclear Power Plants at p. 2.

17 Addendum To Environmental Assessment - Proposed Action: The sale of the Indian Point 3 and The James A.

Fitzpatrick Nuclear Power Plants 18 Negative Declaration, Notice of Determination of Non-Significance for IP3, LLC and FitzPatrick, as prepared by William Slade for NYPA, Lead Agency, March 31, 2000, p. 1. Further, NYPAs statement in the Attachment to the SEQRA Full Environmental Assessment Form, at p. 1, that [t]he Department of State had no objection to the Authority assuming the role of Lead Agency relates to the choice of State agency conducting the SEQRA review; it has nothing to do with State consistency. (15 C.F.R. §§ 930.62 or 930.63).

license transfer.19 As such transfers are not listed activities in the NYS CMP,20 federal consistency review was not automatically required. NYSDOS determined not to seek review OCRMs permission to conduct a federal consistency review of the sale and transfer of the license of IP3 to Entergy. As NYPA noted in the FCAF: Physically, there will be no difference in facility operation before and after the sale. No operational or physical changes will be made.

Virtually the only change will be a substitution of upper management. The staff, the operating procedures and the legal requirements for operation will not change. The NRC nuclear license transfer was not expected to have reasonably foreseeable effects on coastal uses or resources.21 (b) whether that office or agency was authorized to conduct such review (including the statutory or regulatory bases for such authority).

NYPA, as a State public authority, is required by NY Executive Law § 919(1) and the regulations at 19 NYCRR § 600.4, to complete a State agency consistency review for either a Type I or Unlisted action if the action will be undertaken in the coastal area. NYPA is not authorized to, and did not, conduct a federal consistency review. NYSDOS is the only designated State agency (15 C.F.R. §§ 930.6 and 930.11(o)) authorized to conduct such federal consistency reviews.

(c) the scope of the review (including both the activities reviewed and the resources affected by those activities)

The State coastal policies used for State consistency review are set forth in regulation22 and are used to fulfill the State agencys 19 NYCRR § 600.4 consistency obligations. State agencies taking action in the State coastal area required to follow the State consistency procedures,23 except in the event that the proposed action is a SEQRA listed Type II action.

The scope of NYPAs State consistency review was not focused on IP3 operations but was limited to the transfer of its assets and the IP3 operating license to Entergy (10 C.F.R. Part 2 subpart M) for the remainder of its license permit, from 2000 to December 12, 2015.24 According to NYPA: The proposed action is the sale of NYPA's IP3 & JAF NPPs. The sale includes the land, structures, equipment, personnel & agreements on ancillary services & power supply.

Entergy will purchase the NPPs subject to all existing permits & approvals. The sale will not result in any physical change to either site.25 In explaining its reasons supporting its negative 19 See FCAF for IP3, LLC and James A. FitzPatrick as prepared by William Slade dated January 6, 2000.

20 See 15 C.F.R. § 930.54(a). NYPAs completion of a FCAF for federal consistency was indicative of its role as an applicant pursuant to 15 C.F.R. 930.57. NYPA did not conduct and had no authority to conduct a federal consistency review of sale and transfer of IP3 under the CZMA.

21 The procedures for a coastal state to review for federal consistency an unlisted activity are provided to ensure that State agencies are afforded an opportunity to review federal license or permit activities with reasonably foreseeable coastal effects. 15 C.F.R. § 930.54(f). A designated State agency may opt not to review an unlisted federal license or permit activity if it determines that the activity will not have reasonably foreseeable coastal effects. The license transfer for IP3 was an unlisted action in the NYS CMP.

22 19 NYCRR §§ 600.5 and 600.6.

23 19 NYCRR §§ 600.3 and 600.4.

24 See NYPA Negative Declaration, Notice of Determination of Non-Significance, prepared by William Slader, January 6, 2000 at p. 1. Name of Action: The proposed action is the sale of NYPAs Indian Point 3 (IP3) & James A. FitzPatrick (JAF) Nuclear Power Plants (NPPs) to indirectly wholly-owned subsidiaries of the Entergy Corporation of New Orleans.

25 NYPA Negative Declaration, Notice of Determination of Non-Significance, at p. 1. Bolding added.

environmental determination, NYPA wrote: [t]he sale, when completed, will involve the transfer to and assumption by Entergy of the ownership and operation of IP3 [and] [James A.

FitzPatrick] in the same manner as provided for in the state [and] federal licenses, permits, [and]

approvals currently in effect for these facilities.26 NYPA completed a State consistency review as required by Executive Law Article 42, 19 NYCRR § 600.4 to inform its SEQRA decision-making of significance of the license transfer of IP3 and FitzPatrick, which NYPA determined to have no significant impact. The scope of NYPAs consistency review was limited to the IP3 license and asset transfer to Entergy.27 (d) whether NYSDOS evaluated the consistency determination made by the other State office or agency.

No documents at NYSDOS indicate that NYSDOS evaluated NYPAs State agency consistency determination.

(e) whether NYSDOS provided comments or advice (or declined to provide comments or advice) to that office or agency on the consistency of such actions with the State's CMP.

No documents at NYSDOS indicate that NYSDOS commented or declined to comment or give advice to NYPA regarding its 2000 State agency consistency review.

Coastal Assessment (February 11, 2000) completed as a part of the State Pollutant Discharge Elimination System (SPDES) permit renewal application for IP2 and IP3 (March 2, 2000).

(a) which office or agency conducted that review.

NYSDEC conducted the State consistency review of its own permitting actions pursuant to SEQRA and the Waterfront Act regulations. NYSDEC prepared a SCAF as part of the pending Indian Point SPDES permit renewal application. No federal agency action was involved in this State agency review. NYSDOS did not conduct a federal consistency review of the matter.

As noted above, NYSDEC has no federal consistency review authority.

(b) whether that office or agency was authorized to conduct such review (including the statutory or regulatory bases for such authority).

NYSDEC, as a State agency, is required by the Executive Law § 919(1) and 19 NYCRR

§ 600.4, to complete a State agency consistency review for either a Type I or Unlisted action if the action will be undertaken in the coastal area. NYSDEC is not authorized to conduct a federal 26 NYPA Negative Declaration, Notice of Determination of Non-Significance, at p. 2. NYPA was required to make a determination of significance (6 NYCRR 617.7) and concluded the its role as a State agency in transferring the IP3 license to Entergy [would] not result in any large and important impact(s) and. therefore, is one which will not have a significant impact on the environment, therefore a negative declaration will be prepared. Negative Declaration, Notice of Determination of Non-Significance, prepared by William V. Slade, Director, Environmental Division, NYPA, January 6, 2000, Full Environmental Assessment Form, p. 1.

27 See State CAF for IP3, LLC and FitzPatrick completed by William Slade, January 6, 2000.

consistency review. Only NYSDOS is authorized to conduct federal consistency in New York pursuant to 15 C.F.R. Part 930.

(c) the scope of the review (including both the activities reviewed and the resources affected by those activities).

The scope of the State consistency review was limited to the pending SPDES permit renewal application for IP2 and IP 3, as defined in NY Executive Law Article 42. This review did not involve a 15 C.F.R. Part 930 federal agency action, federal authorization for a license or permit, or federal financial assistance.

(d) whether NYSDOS evaluated the consistency determination made by the other State office or agency.

NYSDOS reviewed NYSDECs State agency consistency assessment form (SCAF) but provided no comments on it or the pending SPDES permit renewal.

(e) whether NYSDOS provided comments or advice (or declined to provide comments or advice) to that office or agency on the consistency of such actions with the State's CMP.

No documents at NYSDOS indicate that NYSDOS commented or declined to comment or give advice to NYSDEC regarding its State consistency review.

  • New York Public Service Commission's (NYSPSC) Final Supplemental Environmental Impact Statement (FSEIS), on the transfer of IP1 and IP2 from Consolidated Edison to Entergy (August 17, 2001).

(a) which office or agency conducted that review.

NYSPSC conducted the State consistency review of its own actions pursuant to Public Service Law § 70 and the Waterfront Act regulations.

(b) whether that office or agency was authorized to conduct such review (including the statutory or regulatory bases for such authority).

NYSPSC, as a State agency, is required and authorized by the Executive Law § 919(1) and 19 NYCRR § 600.4, to complete a State agency consistency review for either a Type I or Unlisted action if the action will be undertaken in the coastal area. In accordance with NY Public Service Law § 70, the NYSPSC reviewed ConEds transfer of the retired IP1 unit and active IP2 assets and franchise to Entergy. NYSPSC is not authorized to conduct a federal consistency review. NYSDOS is the only designated State agency to conduct such reviews.

(c) the scope of the review (including both the activities reviewed and the resources affected by those activities).

In 2001, NYSPSC authorized ConEd to transfer the assets of the retired IP1 and active IP2 to Entergy, finding that the proposed transfer is consistent with applicable coastal zone policies set forth in 19 NYCRR § 600.5 [i.e., the New York coastal policies].28 Like the 2000 28 NYSPSC, FSEIS Order, at ETR00054 (Aug. 17, 2001) see also Final Order of NYSPSC Authorizing Asset Transfer 11 (Aug. 31, 2001).

NYPA transfer discussed above, NYSPSCs State consistency review focused solely on the transfer of stock, works and system for IP1 and IP2 from ConEd to Entergy pursuant to NY Public Service Law § 70 and did not involve a review, change or extension of the operations of the facilities. No federal agency action was involved in this State agency review.

(d) whether NYSDOS evaluated the consistency determination made by the other State office or agency.

No documents at NYSDOS indicate that NYSDOS evaluated NYSPSCs State agency consistency determination.

(e) whether NYSDOS provided comments or advice (or declined to provide comments or advice) to that office or agency on the consistency of such actions with the State's CMP.

No documents at NYSDOS indicate that NYSDOS commented or declined to comment or give advice to NYSPSC regarding its State consistency review.

  • NYSDEC's Final Environmental Impact Statement (FEIS) concerning applications to renew the SPDES permits for Hudson River power plants, including IP2 and IP3 (June 25, 2003).

(a) which office or agency conducted that review.

NYSDEC conducted the environmental review and State consistency review of its own permitting actions pursuant to the SEQRA and Waterfront Act regulations. Upon information and belief that review is still on-going.

(b) whether that office or agency was authorized to conduct such review (including the statutory or regulatory bases for such authority).

In its FEIS, NYSDEC analyzed the SPDES permit renewals for the three Hudson River power generation facilities -- Roseton 1 & 2, Bowline 1 & 2, and Indian Point 2 & 3 Steam Electric Generating Stations -- under the policies in Executive Law Article 42. That document stated that: The SPDES permit renewals [for these electric generating facilities] that are the subject of this DEIS will not result in any new effects on coastal zone policies.29 However this was not a site specific alternatives review. See, Entergy v. NYSDEC, et als., 3 Misc. 3d 1070,

      • 8 (Sup.Ct. Albany Co. 2004), affd, 23 A.D. 3d 811 (3d Dept 2005), appeal dismissed and denied, 6 N.Y.3d 802 (2006). Because the SPDES permit was a State action, NYSDEC reviewed the SPDES permit renewals as a matter of State consistency. NYSDEC is not authorized to conduct a federal consistency review; NYSDOS is the only designated State agency to conduct such reviews.

In 2008, NYSDECs Interim Decision directed the parties to the SPDES proceeding to evaluate alternatives under SEQRA in the context of an administrative hearing.30 Depending 29 See Final Environmental Impact Statement, New York State Pollutant Discharge Elimination System Permits for the Roseton 1 & 2, Bowline 1 & 2, and Indian Point 2 & 3 Steam Electric Generating Stations.

30 See www.dec.ny.gov/hearings/45956.html

upon the alternatives chosen as complying with the federal Clean Water Act, State consistency will necessarily be addressed in that context for the selected technology.31 (c) the scope of the review (including both the activities reviewed and the resources affected by those activities).

The scope of the NYSDECs State consistency review is limited to the renewal of the SAPA-extended SPDES permits for IP2 and IP 3.

(d) whether NYSDOS evaluated the consistency determination made by the other State office or agency.

No documents at NYSDOS indicate that NYSDOS evaluated NYSDECs FEIS concerning SPDES permit renewal applications for Hudson River power plants.

(e) whether NYSDOS provided comments or advice (or declined to provide comments or advice) to that office or agency on the consistency of such actions with the State's CMP.

No documents at NYSDOS indicate that NYSDOS commented or declined to comment or give advice to NYSPSC regarding its State consistency review.

NRC INQUIRY # 3. Part I:

The State of New York's CMP states that, Generally, [NYSDOS] will evaluate major actions proposed in the Coastal Area of the State by Federal agencies or by entities requiring Federal permits and determine the consistency of those actions with the Program's policies (CMP Part II, § 11-4 at 3 (1982)). Please describe the circumstances, if any, in which NYSDOS would not perform a consistency evaluation for a Federal action that may affect New York State's coastal zone.

The federal CZMA requires a State with a federally approved CMP to develop a list of federal agency activities which will be reviewed for federal consistency. This list appears in Table 2 of the NYS CMP,32 which details the federal agency activities that NYSDOS has already determined will have coastal effects on New Yorks coastal resources and uses33 and whenever proposed, will be reviewed for federal consistency. The NYS CMP also provides for the issuance of general concurrences for minor actions.34 31 See www.dec.ny.gov/enb/97047.html 32 See NYS CMP Table 2 at p. II-9-17 to II-9-23.

33 See 15 C.F.R. 930.53(a); see also NYS CMP Table 2 at p. II-9-17 to II-9-23. The specific federal regulatory activities subject to consistency review by DOS, including those that may occur outside of the State's coastal zone and have reasonably foreseeable coastal effects, are listed in Part II of Table I. DOS will review these activities for their consistency with New York's CMP in accordance with the procedural requirements of 15 C.F.R. Part 930, subpart D (or subpart I for federal regulatory activities having interstate coastal effects). NYS CMP at p. II-9-12.

34 See 15 C.F.R. § 930.62(a). The State agency may issue a general concurrence for minor activities (see § 930.53(b)). see also NYS CMP p. II-9 II-9-14. Criteria for General Concurrence.

Activities will not require further DOS review and separate concurrences with consistency certifications if all of the following relevant criteria are met:

  • The activity involves a use that is the same as, or similar to, adjacent or nearby uses;

If a federal agency activity is not listed35in the NYS CMP, NYSDOS has the option of seeking permission from NOAAs Office of Coastal Resources Management (OCRM) Director to conduct a consistency evaluation.36 If NYSDOS wants to review the unlisted action, NYSDOS will follow the procedures in 15 C.F.R. § 930.54 to review the activity for federal consistency.

There are no categorical exemptions of federal agency activities from federal consistency review.

Further, the federal consistency concurrence or objection must be issued by NYSDOS, the designated State agency (15 C.F.R. § 930.11(o)), as there are no provisions in the NYS CMP for other State agencies to stand in the shoes of NYSDOS.37 The circumstances in which NYSDOS would not perform a consistency evaluation for a federal action that may affect New York State's coastal zone are limited. One such instance is if NYSDOS has previously entered into an agreement with a federal agency to establish preset conditions for issuance of a general concurrence with conditions for select Regional and Nationwide activities. For example, NYSDOS and the U.S. Army Corps of Engineers (Corps)

  • The activity is compatible with community character in design, size, and materials;
  • If the activity would be in an area covered by an approved LWRP, the community advises that it is consistent with the community's land and water use controls for the area;
  • The activity is identified in an approved LWRP as one that should be undertaken to advance the policies and purposes of the approved LWRP and the community so advises;
  • The activity involves reconstruction, replacement, maintenance or repair of lawful structures, in-kind and in-place, and where applicable a community advises that it complies with an approved LWRP and DOS determines it complies with any applicable Special Management Area Plan;
  • Other than for the exercise of riparian or littoral rights (see below), the activity is entirely on property owned or otherwise authorized by the owner for use by the proponent of the activity;
  • The activity involves the exercise of riparian or littoral rights that is typical of lawful riparian or littoral access traditionally exercised in the area; complies with any applicable local standards; and avoids any unnecessary interference with navigation and other public uses of the water;
  • The activity would not significantly impair the rights and interests of the public regarding the use of public lands or waters;
  • The activity does not disrupt existing lawful water-dependent uses;
  • Other than for the exercise of riparian or littoral rights or the reconstruction, replacement, maintenance or repair of lawful structures (see above), the activity would not be undertaken in a vegetated wetland or natural protective feature;
  • The activity would not generate or discharge non-point source pollution to coastal waters, or would provide a means of adequately treating non-point sources of pollution using accepted best management practices.

35 See 15 C.F.R. § 930.54; DOS will also monitor activities requiring federal regulatory approval that are not listed in Part II of Table I to determine if the activities may affect land and water uses and natural resources in the State's coastal zone. If DOS determines that an unlisted activity will affect coastal uses or resources, then DOS will advise the applicant, federal agency and OCRM that a consistency review of the activity will be required. As part of this notification, DOS will request OCRM's approval to review the unlisted activity. NYS CMP at II-9-12.

36 15 C.F.R. § 930.54 (a)(1): With the assistance of Federal agencies, State [coastal] agencies should monitor unlisted federal license or permit activities (e.g., by use of intergovernmental review process established pursuant to E.O. 12372, review of NEPA documents, Federal Register notices). State agencies shall notify Federal agencies, applicants, and the Director of unlisted activities affecting any coastal use or resource which require State agency review within 30 days from notice of the license or permit application, that has been submitted to the approving Federal agency, otherwise the State agency waives its right to review the unlisted activity. The waiver does not apply in cases where the State agency does not receive notice of the federal license or permit application.

37 See 15 C.F.R. § 930.62(a), in part, At the earliest practicable time, the State agency [DOS] shall notify the Federal agency and the applicant whether the State agency concurs with or objects to a consistency certification.

(Emphasis added).

have engaged in a 15 C.F.R. Part 930 subpart D federal consistency review process that has resulted in the identification of Corps identified Regional and Nationwide federal activities subject to a Corps permit. In that context, after NYSDOS has conducted a thorough federal consistency review of the identified Regional and Nationwide Corps activities, NYSDOS issues a federal consistency determination that included a coastal policy analysis and conditions for each of the activities that, if adhered to, would not have adverse coastal effects. 38 The federal consistency decision has an expiration date of five years from the date of issuance, is periodically updated with through mutual consent from NYSDOS and the Corps and provides for the determination that there would not be coastal effects from the activity if the conditions are met.

If an applicant or agency is not able to meet the conditions for issuance of a Regional and Nationwide permit, it must submit a consistency certification to NYSDOS seeking an individualized federal consistency review. NYSDOS does not have such an agreement with NRC for the licensing of nuclear facilities. Accordingly all NRC required licenses, certification, or approvals, including renewal applications, must be submitted to NYSDOS for federal consistency review prior to NRC approval.

NRC INQUIRY # 3 PART II:

Additionally, please describe how a consistency evaluation for a Federal action would differ from an evaluation performed for a State action. For the four reviews cited by Entergy, please describe whether each review would be sufficient for a consistency review for a Federal action and, if deficient, how that review is deficient. Please cite any applicable regulations, guidance, or other relevant documents.

There are similarities as well as differences in the manner in which federal and State agency consistency is conducted and projects are evaluated. A federal consistency review by NYSDOS is subject to the 15 CFR 930 regulations, state consistency review is not. Others are discussed below.

Both federal and state agencies taking action in the coastal area must act consistently with New Yorks 44 enforceable coastal policies. Though the policies are phrased different in the NYS CMP and in the Waterfront Act and its regulations (Executive Law § 912 and 19 NYCRR

§§ 600.5 and 600.6), the obligation to abide by them is a common responsibility. Central to the enactment of waterfront legislation in New York was satisfying the CZMA requirement that each coastal state enact a state law with authority to bind state agencies to comply with the same coastal policies to which federal agency must comply.39 Enforceability of the coastal policies at the state level was a base minimum requirement for program approvability. The Waterfront Act 38 When NYSDOS conducts a federal consistency of the Corps Nationwide and Regional activities and sets forth in the federal consistency decision, the identified activities will not be required to undergo individual federal consistency review if the activity is conducted pursuant to the condition listed in DOSs federal consistency decision for those actions. See 15 C.F.R. § 930.1(c).

39 16 U.S.C. § 1455(d)(15).

became the linchpin for requiring State agency consistency and ensuring that the coastal policies were implemented and enforced at the state level.

The NYS CMP is a networked coastal program that draws upon a network of state statutes, regulations and other legal authorities to enforce the state coastal policies40and does not incorporate the 44 enforceable coastal policies in a single State consistency permit. The Waterfront Act regulations contain 29 coastal policies which are applicable to State agency consistency. The other 15 policies, which together with the 29 enforce the 44 coastal policies, are contained in State laws and programs administered by State agencies other than NYSDOS. The policy language and format differs between the NYS CMP and the Waterfront Act regulations.

The State Legislature empowered NYSDOS to adopt rules and regulations ensure that those state policies codified in Executive Law § 912 were given effect.

Each State agency is responsible for reviewing its direct or permitting actions to ensure that they are undertaken in a manner that is consistent with the State's 29 coastal area policies in 19 NYCRR § 600.5 or § 600.6, depending upon the geographical location of the project and in accordance with the procedures set forth in 19 NYCRR Part 600, the Waterfront Act regulations.41 Potentially, several state agencies may have separate regulatory reviews in connection with a given project; each must render a separate consistency determination before it issues or denies a permit. The State agencies acting under NY Executive Law Article 42 are self-policing when conducting their consistency reviews. By comparison, NYSDOS is the only State agency which is empowered to conduct federal consistency review in New York State and only one federal consistency determination of a federal action is possible. Its authority is not transferable to another New York State agency nor can a federal consistency review be artificially manufactured through a State agency consistency review for a separate action.

Following federal approval of New Yorks CMP in 1982, proposed federal actions or approvals affecting land or water uses or the natural resources of the coastal zone are reviewed by NYSDOS for consistency with the States 44 coastal policies. The federal consistency process centers on the interaction between the NYSDOS, the federal agency, and the applicant; this important dynamic is not present when state agencies conduct a consistency review under the Waterfront Act.

A distinguishing feature of State agency consistency review which differs from federal consistency review is the concept of balancing. Under Executive Law Article 42, there is a balancing approach to State agency consistency with coastal policies. When it becomes clear that a proposal will substantially hinder one or more coastal policies, the State agency may only undertake or approve the activity if it certifies: 1) that no reasonable alternatives exist; 2) the action taken will minimize all adverse impacts on such policies to the maximum extent 40 For networked programs see C.F.R. § 923.43(b)(2). Rather than enact comprehensive legislation, New York's legislature elected to utilize a networked approach for coordinating and implementing the goals of the program, with provision for adoption of local programs. See Executive Law Article 42 and the NYS CMP, § II-4, at 1-2, 8. There are currently 81 New York state statutes which enforce the coastal policies; they are listed after each policy in the NYS CMP and are kept current through periodic routine program changes. (15 C.F.R. § 923.84).

41 19 N.Y.C.R.R. § 600.3.

practicable; 3) the action will advance one or more of the other coastal policies; and 4) the action will result in an overriding regional or statewide benefit.42 By contrast, federal consistency does not permit the balancing of the competing policies.

When the federal consistency certification is submitted, NYSDOS is required to issue an objection, concurrence or conditional concurrence within six months of receiving all necessary data and information. Unlike in State consistency, there is no provision for the balancing of coastal policies in a federal consistency review and the federal agency activity must not be inconsistent with any of the 44 enforceable coastal policies. If NYSDOS objects to a federal consistency certification, then an applicant may initiate an appeal process in accordance with the procedures in 15 C.F.R. Part 930 subpart H. There is no administrative appeal process for State consistency reviews.

State consistency is a limited, isolated review of the State agencys own action. State agencies cannot review for consistency the actions of any other New York State agency, let alone those of federal agencies. In instances where two or more state agencies may have jurisdiction over a proposed action, each agency must render its own consistency determination and can potentially reach contrary determinations about the consistency of the activity. Moreover, under federalism principles, no state law, including NY Executive Law Article 42, can give to state agencies authority to review federal agency activities. Only pursuant to the congressionally enacted CZMA can States attain the authority to conduct reviews of federal agency actions. The CZMA confers that review authority on a single State agency. In New York, the single State agency for federal consistency review is NYSDOS.

For the four reviews cited by Entergy, please describe whether each review would be sufficient for a consistency review for a Federal action and, if deficient, how that review is deficient. Please cite any applicable regulations, guidance, or other relevant documents.

  • New York Power Authority's (NYPA) environmental review (including the State Environmental Quality Review Act (SEQRA) negative declaration, Federal consistency certification, and State coastal assessment, if any) on the proposed sale of NYPA's IP3 to Entergy (March 31, 2000).

NYPAs consistency review is not sufficient for purposes of federal consistency review, nor a substitute for it. NYPA owned IP3 until November 21, 2000, when it transferred its ownership interest in, and operating/maintenance responsibility for, the IP3 plant to Entergy.

NYPA conducted a State agency consistency review of the sale of the facility and its operating license to Entergy. The NYPA State consistency determination was limited to the transfer of IP3 to Entergy and did not review the operating license for the IP3 facility. As the seller of IP3, NYPAs state consistency review was limited to its own property transfer. Under no construct would that state review be sufficient for federal consistency review of IP3s operating license.

42 19 NYCRR § 600.4(b). A separate but similar procedure has been established in the regulations for the review of a State agency action within the boundary of a community with an approved local waterfront revitalization program, where the action is one which has been identified by the Secretary pursuant to Executive § 916(1) and a negative declaration has been issued. 19 NYCRR § 600.4(c) Where a positive declaration has been issued, the action will be reviewed under SEQRA procedures.

The NRCs federal agency action treats such transfer as a ministerial act (10 C.F.R. §§ 50.80 and 50.90). The review accorded transfer of a nuclear facility to a responsible buyer does not approximated the comprehensive multi-level of review involved with a NRC license renewal (10 C.F.R. Part 54). In any event, NYPA would not have been authorized to conduct a federal consistency of NRCs action, as it has not been delegated authority to conduct federal consistency reviews by the NYS CMP.

Coastal Assessment (February 11, 2000) completed as a part of the State Pollutant Discharge Elimination System (SPDES) permit renewal application for IP2 and IP3 (March 2, 2000).

NYSDECs consistency review is not sufficient for purposes of federal consistency review, nor a substitute for it. The February 11, 2000 NYSDEC prepared a SCAF. The SPDES permit reviews is a NYSDEC action and does not involve a federal agency action, which is a basic requirement for the completion of a federal consistency review.43 The NYSDEC State CAF is a preparatory step in a State consistency review in the State agency SEQRA process. 44It is not a substantive review of the IP2 and IP3 operational licenses; and it does not involve the federal consistency review of the NRC license renewal. (15 C.F.R. Part 930 subpart D) Therefore, the NYSDEC State consistency action cannot be recognized as a federal consistency review.

  • New York Public Service Commission's (NYSPSC) Final Supplemental Environmental Impact Statement (FSEIS), on the transfer of IP1 and IP2 from Consolidated Edison to Entergy (August 17, 2001).

NYSPSCs consistency review is not sufficient for purposes of federal consistency review, nor a substitute for it. NYSPSCs State consistency review of the transfer of the assets and franchise of retired IP1 unit and active IP2 did not involve a federal action, nor is NYSPSC the designated State agency to conduct federal consistency reviews. The NYSPSC approval of the transfer involved NY Public Service Law § 70 and related State law requirements and did not involve a review, change or extension of the operations or underlying license of the nuclear facilities. Moreover, the NYSPSC determination does not purport to review the NRCs approval of the license transfer from ConEd to Entergy (which NRC considers ministerial act). Finally, NYSPSC is not authorized to conduct a federal consistency review and its State consistency review was focused only on its approval of the transfer as a responsible State agency.

  • NYSDEC's Final Environmental Impact Statement (FEIS) concerning applications to renew the SPDES permits for Hudson River power plants, including IP2 and IP3 (June 25, 2003).

43 See e.g. 15 C.F.R. § 930.51(a). The term federal license or permit means any authorization that an applicant is required by law to obtain in order to conduct activities affecting any land or water use or natural resource of the coastal zone and that any Federal agency is empowered to issue to an applicant. See 16 U.S.C. § 1456. The basic premise of the federal CZMA is that it involves the designated State agencys review of federal agency activities for federal consistency with the enforceable State coastal policies.

44 19 NYCRR § 600.4.

NYSDECs consistency review is not sufficient for purposes of federal consistency review, nor a substitute for it. The NYSDEC June 25, 2003 FEIS is not a review of the IP2 and IP3 operational licenses, nor does it involve the federal consistency (15 C.F.R. Part 930 subpart D) review of the NRC license renewal. The ongoing NYSDEC SEQRA and SPDES/Best Technology Available (BTA) administrative hearing, which is expected to result in an alternative specific State consistency determination, is not the equivalent of a federal consistency review conducted under the CZMA and its implementing regulations at 15 C.F.R. Part 930.

NRC INQUIRY # 4.

CZMA regulations in 15 CFR 930.51 describe situations whereby the renewal of a Federal license or permit for an activity that has previously been reviewed for consistency with the State's coastal management program does not require a subsequent consistency determination unless the proposed action will cause an effect on any coastal use or resource substantially different than those previously reviewed by the State agency.

a. Please describe your understanding of the applicability of 15 CFR 930.51(b), (c) and (e) to the license renewal application for IP2 and IP3.
b. Please state if you believe there were any substantial changes in the coastal environment or substantial changes to the New York CMP since 2000. If so, please describe those changes.
a. Please describe your understanding of the applicability of 15 CFR 930.51 (b), (c) and (e) to the license renewal application for IP2 and IP3.

The regulations implementing the CZMA state:

(a) The term "Federal license or permit" means any authorization, certification, approval, or other form of permission which any Federal agency is empowered to issue to an applicant.45 Entergys license renewal application for IP2 and IP3 fall within that definition of a federal license or permit. NYSDOS is currently reviewing the IP2 and IP3 applications for federal consistency pursuant to the substantive and procedural requirements of 15 CFR Part 930 Subpart D as [l]icensing and certification of the siting, construction, and operation of nuclear power plants, pursuant to Atomic Energy Act of 1954, Title II of the Energy Reorganization Act of 1974 and the National Environmental Policy Act of 1969. They are each listed activities in NYS CMP Table 2 requiring federal consistency review to be conducted by NYSDOS, the only 15 C.F.R. § 930.11(o) designated State agency in New York State to conduct federal consistency reviews.46 45 15 C.F.R. § 930.51(a).

46 NYS CMP at p. II-9-20.

15 C.F.R. §§ 930.51(b)(2) and (3) and (c) address consistency review of a major amendment or renewal of an activity previously reviewed for federal consistency and subsequently permitted.47 That provision is not applicable here. Since IP2 and IP3 were never reviewed for consistency by NYSDOS, 15 C.F.R. §§ 930.51 (b)(2) and (3), (c) and (e) are inapplicable to the current situation. The consultation process between federal and state agencies arises only in the context of a federal license renewal when the original license was previously reviewed for federal consistency by the State agency and the renewal will either be subject to new program requirements or cause an effect on any coastal use or resource substantially different than those originally reviewed by the State agency. 15 C.F.R. §§ 930.51(b)(3) and (e).

In order for 15 C.F.R. §§ 930.51(b)(2) or (3) to apply, the original federal license or permit activities must have undergone a previous federal consistency review.48 The NRC approved the original operating licenses for IP2 and IP3 in 1973 and 1975, respectively. Both original licenses pre-date the September 30, 1982 federal approval of the NYS CMP and thus neither original operating permit was or could have been subject to federal consistency review.

While federal consistency reviews were not conducted for the original IP operating licenses, a separate and distinct review obligation applies to license renewal applications where the facilities have not been previously reviewed. Here, Entergys federal consistency certification is being reviewed in accordance with 15 C.F.R. § 930.51(b)(1), which requires that [r]enewals 47 15 C.F.R. § 930.51 reads, in pertinent part:

(a) The term federal license or permit means any authorization that an applicant is required by law to obtain in order to conduct activities affecting any land or water use or natural resource of the coastal zone and that any Federal agency is empowered to issue to an applicant.

(b) The term also includes the following types of renewals and major amendments which affect any coastal use or resource:

(1) Renewals and major amendments of federal license or permit activities not previously reviewed by the State agency; (2) Renewals and major amendments of federal license or permit activities previously reviewed by the State agency which are filed after and are subject to management program changes not in existence at the time of original State agency review; and (3) Renewals and major amendments of federal license or permit activities previously reviewed by the State agency which will cause an effect on any coastal use or resource substantially different than those originally reviewed by the State agency.

(c) The term major amendment of a federal license or permit activity means any subsequent federal approval that the applicant is required to obtain for modification to the previously reviewed and approved activity and where the activity permitted by issuance of the subsequent approval will affect any coastal use or resource, or, in the case of a major amendment subject to § 930.51(b)(3), affect any coastal use or resource in a way that is substantially different than the description or understanding of effects at the time of the original activity.

(d) The term renewals of a federal license or permit activity means any subsequent re-issuance, re-approval or extension of an existing license or permit that the applicant is required to obtain for an activity described under paragraph (b) of this section.

(e) The determination of substantially different coastal effects under paragraphs (b)(3), and (c) of this section is made on a case-by-case basis by the Federal agency after consulting with the State agency, and applicant. The Federal agency shall give considerable weight to the opinion of the State agency. The terms major amendment, renewals and substantially different shall be construed broadly to ensure that the State agency has the opportunity to review activities and coastal effects not previously reviewed. .

48 15 C.F.R. §§ 930.51(b)(2) and (3).

and major amendments of federal license or permit activities not previously reviewed by the State agency are to be reviewed for federal consistency review in accordance with 15 C.F.R Part 930 subpart D.49 In order for 15 C.F.R. § 930.51(b)(2) or (3) to apply, NYSDOS would have to have previously completed a federal consistency certification. Subsection 15 C.F.R. § 930.51(b)(2) and (3) contain a condition precedent requiring that the federal license or permit activities previously reviewed by the State agency. NYSDOS, as the only designated State agency, has never reviewed the original operating licenses for IP2 and IP 3 and so 15 C.F.R. § 930.51(b)(2) or (3) does not apply to the current license renewal applications (10 C.F.R. Part 54).

Applicable here, 15 C.F.R. § 930.51(b)(1) describes a situation where federal consistency is required when the renewal of the federal license or permit was not previously reviewed by the State agency. As discussed previously, NYSDOS is the sole designated State agency with the authority to review NRC operating licenses and license renewals. While federal consistency review was conducted for the other New York nuclear power stations in New York in conjunction with their license renewal applications (including Entergys FitzPatrick plant),

NYSDOS has never conducted a federal consistency review for IP2 and IP3.50 NRC INQUIRY # 4 subpart b.

Please state if you believe there were any substantial changes in the coastal environment or substantial changes to the New York CMP since 2000. If so, please describe those changes.

Yes, the NYS CMP has changed since 2000. NRCs inquiry asks NYSDOS whether there were any substantial changes in the coastal environment since the year 2000. Pursuant to 15 C.F.R. § 930.51(b)(3), deference would be provided to NYSDOS in [t]he determination of substantially different coastal effects under paragraphs (b)(3), and (c) of this section is made on a case-by-case basis by the Federal agency after consulting with the State agency, and applicant.

The Federal agency shall give considerable weight to the opinion of the State agency.51 The NYS CMP underwent two Routine Program Changes (RPCs) in 2001 (Appendix 6) and 2006 (Appendix 7), and the changes to the program provided the addition of material required for federal consistency review. These changes were not considered to be amendments to the NYS CMP but rather routine changes in a decision rendered by the US Department of Commerce. The 2001 RPC expanded the necessary data and information list52 to include, among other things, the submission of a FEIS if required by the federal agency, as is the case with the IP2 and IP3 license renewals (10 C.F.R. Part 54).53 The 2006 RPC contained interstate consistency provisions (15 C.F.R. Part 930 subpart I) that provided for NYSDOS, as the 49 See NYS CMP at p. II-9-11: Activities in or outside of New York's coastal zone, which require federal permits, licenses and other regulatory authorizations and affect land and water uses and natural resources in the coastal zone, are subject to review by DOS for their consistency with the State's CMP. This requirement also applies to renewals and major amendments to such regulatory approvals.

50 See L. 1975, C. 464, 947.

51 15 C.F.R. § 930.51(e).

52 15 C.F.R. § 930.58(a).

53 2001 NYS CMP RPC at p. 25-26. (Attachment 6)

designated State agency, to review applications for federal license and permits for federal consistency that were located in Connecticut State waters in Long Island Sound.

In 2012, the NYS CMP has also been updated for the addition of federally-approved Local Waterfront Revitalization Programs and the update of the Significant Coastal Fish and Wildlife Habitats.54 NRC INQUIRY # 5.

Is the Department aware of any other examples where a consistency review by a State agency was not required, or not conducted, because a review had been conducted previously and the proposed activity would not affect any coastal use or resource in a way that was substantially different than the description or understanding of effects at the time of the original review, as described 15 CFR 930.51? If so, please describe the circumstances of that (those) situation(s).

NYSDOS is not aware of any other examples where a federal consistency review by a State agency [NYSDOS] was not required, or not conducted, because a review had been conducted previously and the proposed activity would not affect any coastal use or resource in a way that was substantially different than the description or understanding of effects at the time of the original review. When federal permits or licenses expire, NYSDOS conducts a new consistency review.

Changes that occur between an original license and a renewal application provide additional information for review. For instance, NYSDOS receives applications for federal agency maintenance dredging permits that are generally issued for standard time intervals, and are usually valid for 5 or 10 year terms. At the conclusion of the maintenance dredging permit, applicants generally submit an application for a federal consistency review for a renewal of the first permit. Although called a renewal, this second permit for a set term number of years for maintenance dredging is classified by both the federal agency and DOS as an entirely new review, which entails NYSDOSs completion of a federal consistency review for the new permit term.

54 Since 2000, the following RPCs were approved by the Office of Coastal Resource Management (OCRM) for Significant Coastal Fish and Wildlife Habitats (SCFWHs). June 6, 2002: OCRM concurred with NYSDOSs RPC to add 5 and to modify 41 SCFWHs in Suffolk County; August 31, 2006: OCRM concurred with NYSDOSs July 13, 2006 RPC to add 8 SCFWHs in Suffolk County and to modify in 25 SCFWHs in Suffolk and Nassau Counties; February 20, 2009 and May 13, 2009: OCRM concurred with NYSDOSs December 2, 2008 RPC to add 2 SCFWHs to the South Shore of Long Island, to modify 9 SCFWHs including the combination of 4 of the previously designated habitats into two habitats and the deletion of three habitats; and November 30, 2012, OCRM concurred with NYSDOSs July 31, 2012 RPC to update the Hudson River SCFWHs. The RPC includes modifications to the narratives for the existing 35 habitats, the extension of 13 habitat boundaries, the consolidation of 4 habitats into 2, and the designation of 7 new habitats.

Significantly, three nuclear power plant facilities submitted certifications to NYSDOS for federal consistency review for the 10 C.F.R. Part 54 operating license renewals applications. These were:

F-2002-0707 R.E. Ginna Nuclear Power Plant (Rochester Gas & Electric)

F-2004-0194 Nine Mile Point Nuclear Station Units 1 & 2 (Constellation)

F-2007 1155 James A. FitzPatrick Nuclear Power Plant (Entergy)

As with Indian Point, NYSDOS never reviewed the original operating licenses for the three facilities but reviewed the renewal applications in accordance with 15 C.F.R. 930.51(b)(1).

All three applications were classified as new federal consistency reviews by NYSDOS. In addition, each review resulted in a determination that the activities were consistent with the enforceable policies of the NYS CMP, and the facility licenses were renewed by NRC.

NRC INQUIRY # 6.

Please describe whether NYSDOS concurs with Section 9.3 of Entergy's Environmental Report, as revised (Enclosure 1 to NL-12-107), in which Entergy states it now believes that the New York Coastal Zone Management Plan also exempts both plants from further consistency review.

Entergy focused its response to R.A.I. No. 3 on so-called grandfathering provisions in the NYS CMP.55 Entergy filed suit in New York Supreme Court, Albany County seeking a declaratory order that it is exempt from federal consistency review. On December 13, 2013, in Entergy Nuclear Operations, Inc. v. New York State Dept. of State, 42 Misc.3d 896 (Sup. Ct.

Albany Co. 2013), Supreme Court Justice Michael Lynch issued a favorable decision to NYSDOS and finding that the exemption provisions do not apply to Entergys application for the license renewal.56 The court upheld the NYSDOSs conclusion that Entergys Indian Point facility was subject to federal consistency review by virtue of Entergys 2007 application to renew its operating licenses for its Indian Point facilities. On January 22, 2014, Entergy filed a notice of appeal with the N.Y. Supreme Court, Appellate Division, Third Department. The appeals process is still ongoing.

55 See NYS CMP at pt. II, § 9, at 1.

56 See Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3 LLC v. New York State Dept. of State, 42 Misc. 3d 896 (Supreme Ct. [Albany Cty.]) Dec. 13, 2013. (Attachment 8).