ML14234A443

From kanterella
Jump to navigation Jump to search
Confirmation of OL Exam (Rkw)
ML14234A443
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/22/2014
From: Hironori Peterson
Operations Branch III
To: Plona J
DTE Energy
R. K. Walton
References
Download: ML14234A443 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 22, 2014 Mr. Joseph Plona Senior Vice President and CNO DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION:

FERMI POWER PLANT, UNIT 2

Dear Mr. Plona:

We have received a letter from DTE Energy NRC-14-0040, dated May 20, 2014. In this letter, DTE Energy requested an initial operator licensing examination scheduled at the Fermi Power Plant, Unit 2, for the weeks of September 14 and 21, 2015, be rescheduled to the week of August 24, 2015.

In response, we have rescheduled the Fermi initial license exam date from September 2015 to August 24, 2015.

In the unlikely event that we are unable to support the examination during the scheduled week, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examination for the initial operator licensing exam scheduled in 2015 unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need.

Because your letter did not indicate the number of applicants being considered for this examination, the examination was each scheduled for one week based on a phone conversation with Tim Barrett on April 8, 2014. Please inform us if the number of applicants changes as this may impact the examination schedule. Also, please inform us at your earliest opportunity if you discover the need to change the scheduled dates for any examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

J. Plona In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSERV

J. Plona In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSERV DISTRIBUTION:

Anthony Bowers RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: Ltr 082214 Fermi Confirmation of OL Exam (RKW).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:bl HPeterson DATE 08/22/14 08/22/14 OFFICIAL RECORD COPY