MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
WILLIAM R. KEATING WASHINGTON DC OFFICE 9TH DISTRICT, MASSACHUSETTS 315 CANNON HOUSE OFFICE BUILDING WASHINGTON, DC 20515 (202) 225-3111 COMMITTEE ON FOREIGN AFFAIRS SUBCOMMITTEES CAPE AND ISLANDS OFFICE RANKING MEMBER EUROPE, EURASIA, AND EMERGING THREATS 297 NORTH STREET, SUITE 312 ASIA AND THE PACIFIC HYANNIS, MA 02601 (508)771-0666 COMMITTEE ON HOMELAND SECURITY SUBCOMMITTEES 0Iongr£zz of +/-4£ ~nit£~ ~hd£z NEW BEDFORD OFFICE
~OUS£ of 21\£pr£S£nhtitb£S COUNTERTERRORISM AND INTELLIGENCE 558 PLEASANT STREET, SUITE 309 CYBERSECURITY, INFRASTRUCTURE NEW BEDFORD, MA 02740 PROTECTION, AND (508) 999-6462 SECURITY TECHNOLOGIES
- m£fnz4ington, J§Ql 20515 PLYMOUTH OFFICE April25, 2014 2 COURT STREET PLYMOUTH, MA 02360 (508)746-9000 Allison M. Macfarlane, Chair U.S. Nuclear Regulatory Commission Mail Stop 0-16G4 Washington, DC 20555-0001
Dear Chair Macfarlane,
I am writing to echo the concerns of many in Massachusetts, including Governor Patrick, Attorney General Coakley, and Senators Markey and Warren, in regard to Pilgrim Nuclear Power Station. In particular, fifteen Southeastern Massachusetts communities have recently expressed their serious concerns about the safety of Pilgrim Nuclear Power Station ("Pilgrim").
These communities, which geographically surround the facility, each have issued local statements calling for the closing of Pilgrim, and have shared with me their grave concerns related to the impact on citizens should there be an accident. I share their concerns that no concrete, viable evacuation plan exists in such circumstances. Further, a recent NRC report that has classified Pilgrim and its reactors as at risk in the event of a natural disaster such as an earthquake has also added urgency to this communication. As you know, my colleagues and I have written to both you and your predecessor on the issue of the safety of Pilgrim. Perhaps, most memorably, we all wrote to express our concerns over the relicensing of Pilgrim as ongoing issues still remain unaddressed. Today, I write to see if there has been an update on those concerns as well as issues surrounding the evacuation plans for surrounding communities, the seismic re-evaluation findings for Pilgrim, the recent DOD designation of Pilgrim's status in regard to potential terrorist activity, the overcapacity of the spent fuel pool, and the uptick in shutdown activation and other recent concerning indicators at the plant.
In regard to the recent seismic hazard re-evaluation findings for Pilgrim as recommended by the NRC Near Term Task Force report following Fukushima, Pilgrim's reactors were discovered to be at a greater seismic hazard than the earthquake potential that could threaten the equipment needed to safely shut down the reactor. NRC has committed itself to immediately implementing mitigating measures for the most high risk reactor equipment around the country, and have identified mitigating measures that can quickly be implemented for some plants.
Since the unique geographical relationship between Pilgrim and the communities comprising Cape Cod and Southeastern Massachusetts could put those residents at risk should there be an accident, I would echo the calls of my colleagues to urge the licensees of Pilgrim to take all necessary measure to ensure the safety of my constituents in the event of such an incident.
The potential impact of a major event at the plant is disquieting. As the representative of Cape Cod and Southeastern Massachusetts, I urge you to review the concerns that continue to plague the communities that I represent and further recommend that licensees be directed to immediately implement measures to ensure the safety of the reactors and waste storage facilities at Pilgrim and other plants should an earthquake, flood, or other disaster occur. The Commission's oversight of this facility is essential to the health and safety of the residents of Massachusetts.
I thank you for your time and attention to this matter.
ILLIAM R. KEATING Member of Congress
(l[:ongress of tbt Wntttb ~tatts J!)ouse of l\epresentatibes wmlas>bington, 119C!C 20515-2110 OFFICIAL BUSINESS PRINTED ON RECYCLED PAPER M.C.
Allison M. Macfarlane, Chair U.S. Nuclear Regulatory Commission Mail Stop 0-1604 Washington, D.C. 20555-0001 I**' *l*tii"''II'I""IIJ ml*t"'*ll*t*ll '1 1*+1" 111llll 11
'**'*'**'*'*'*'*'*'****'*" CAPi..JSP i :20555