Category:E-Mail
MONTHYEARML24289A1442024-10-15015 October 2024 NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) ML24152A2662024-05-23023 May 2024 Submittal of Updated Final Safety Analysis Report ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24108A1142024-04-17017 April 2024 June 2024 Emergency Preparedness Program Inspection - Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23335A0652023-12-0101 December 2023 NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23191A8662023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review of LAR Adopting 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors ML23191A2802023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review for LAR Adopting TSTF-505, Rev. 2, Provide Risk-Informed Completion Times - RITSTF Initiative 4b ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML22075A3692022-03-0303 March 2022 Email Grand Gulf 2022 PI&R Request for Information ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21165A1352021-06-14014 June 2021 NRR E-mail Capture - Grand Gulf - Acceptance Review for Inserice Testing Program Relief Request VRR-GGNS-2021-1, Pressure Isolation Valve Testing Frequency ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20352A1192020-12-10010 December 2020 Email from Thomas Saporito 12-10-20 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20323A4162020-11-18018 November 2020 Response to Choice Letter (EA-20-094) ML20337A2712020-11-0909 November 2020 Email - Grand Gulf Nuclear Station 050-00416, Requested Regulatory Conference ML20289A3542020-10-14014 October 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of TSTF-563 LAR, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20176A4832020-06-22022 June 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of Relief Request Associated with ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20150A6012020-05-29029 May 2020 NRR E-mail Capture - Grand Gulf - Official RAI for LAR Associated with Containment ILRT Interval Change from 10 Years to 15 Years ML20097B8032020-04-0303 April 2020 NRR E-mail Capture - Grand Gulf - Acceptance Review for the Exigent LAR Associated with One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies from 11.5 Years to 13.5 Years ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) ML20079D9302020-03-19019 March 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20076B6322020-03-16016 March 2020 NRR E-mail Capture - Grand Gulf - Acceptance Review for the LAR Associated with Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies ML20057G1592020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20057G1752020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems ML19242C0122019-08-29029 August 2019 2.206 Petitioner (No Public Meeting Required) ML19339H4362019-08-26026 August 2019 Request for Information IR 05000416/2019-004 ML19115A3512019-04-25025 April 2019 LTR-19-0177 Tom Gurdziel, E-mail a Matter of Fairness Entergy Grand Gulf Seems to Be Running Rather Steadily at 100 Percent ML19151A3312019-04-0303 April 2019 (OEDO-19-00053)10 CFR 2.206 Petition Involving Grand Gulf Nuclear Station ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19078A3772019-03-19019 March 2019 NRR E-mail Capture - Grand Gulf - Official Rais for Relief Request GG-ISI-023, Inservice Inspection Impracticality, Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval 2024-05-23
[Table view] |
Text
NRR-PMDAPEm Resource From: Kim, James Sent: Thursday, March 06, 2014 7:21 AM To: Robinson, Christopher Cc: Wang, Alan; Broaddus, Doug; Rosenberg, Stacey; Cheruvenki, Ganesh; Allen, Don; Smith, Rich
Subject:
Verbal Authorization for Grand Gulf Relief Request, GG-ISI-17 Mr. Robinson, In accordance with NRR Office Instruction LIC-102, Relief Request Reviews, ADAMS ML091380595, on March 5, 2014, the NRR staff provided verbal authorization for Grand Gulf Relief Request GG-ISI-17 for deferring the examination of the ASME Code,Section XI, Category B-N-1, B13.10 reactor vessel interior at GGNS, Unit 1, until RFO-20 in 2016. The authorization was provided using the script shown below.
As indicated, the NRC staff will follow up with a written safety evaluation within 150 days.
A copy of this email will be made publicly available. Please contact me if you have any questions.
James Kim, Project Manager NRR/DORL 301-415-4125 Email: james.kim@nrc.gov VERBAL AUTHORIZATION FOR RELIEF REQUEST GG-ISI-17 EXAMINATION OF REACTOR VESSEL INTERIOR GRAND GULF NUCLEAR STATION, UNIT 1 ENTERGY OPERATIONS INC.
DOCKET NUMBER 50-416 March 5, 2014 Technical Evaluation read by Stacey Rosenberg, Chief of the Vessel and Internals Integrity Branch, Nuclear Reactor Regulation.
By letter dated February 26, 2014, Entergy Operations Inc., the licensee, requested an expedited verbal approval for deferring the examination of the reactor vessel interior (Category B-N-1, B13.10) from the current refueling outage (RFO-19) until refuelling outage (RFO-20) in the year 2016. During the outage while performing this in-service inspection (ISI) at Grand Gulf Nuclear Generating Station (GGNS) Unit 1, the submersible inspection vehicle being used did not produce sufficient image quality to satisfy the visual examination (VT-3) standards. In its February 26, 2014, letter, the licensee stated that continuation of the VT-3 examination of the reactor vessel interior would require substitution of submersible inspection vehicle with manually operated inspection methods which would increase radiological dose to personnel. In response to the NRC staffs request for additional information, by letter dated February 28, 2014, the licensee provided the technical basis for deferring the ISI examinations for B-N-1 components until RFO-20 in the year 2016.
On the basis of information submitted, the NRC staff has determined that the proposed relief request for deferring the VT-3 examinations of the reactor vessel interior (Category B-N-1, B13.10) until RFO-20 in 2016 is acceptable for the following reasons:
1
(a) Previous examinations of the reactor vessel interior at GGNS, found no indications of distortion, corrosion, wear, loose and/ or missing parts, with the exception of a gouge to the vessel interior wall above the top guide.
Subsequent examinations of the gouged area revealed no change in the size of the gouge which indicates that there is no active degradation associated with the gouge; (b) continuation of VT-3 examination of the reactor vessel interior with manually operated inspection methods would result in an increase in radiological dose of approximately 397 millirem during RFO-19 without a compensating increase in the level of quality and safety; and, (c) deferring the examinations of the reactor vessel interior does not compromise the structural integrity and safety and functionality of the reactor vessel interior.
The NRC staff finds that continuation of VT-3 examinations during the current outage (RFO-19) of the reactor vessel interior would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii).
Therefore, the NRC staff authorizes the Request for relief for a one-time deferral of the examination of the ASME Code,Section XI, Category B-N-1, B13.10 reactor vessel interior at GGNS, Unit 1, until RFO-20 in 2016. The reactor vessel interior (Category B-N-1, B13.10) shall be examined using the VT-3 technique in 2016.
Authorization read by Douglas Broaddus, Chief of the Plant Licensing Branch IV-2, NRR As Chief of the Plant Licensing Branch IV-2, Office of Nuclear Reactor Regulation, I concur with the conclusions of the Vessel and Internals Integrity Branch. The NRC staff determines that the proposed alternative provides reasonable assurance of structural integrity reactor vessel interior. Therefore, as of March 5, 2014, the NRC staff authorizes the Request for verbal relief for deferring the examination of the ASME Code,Section XI, Category B-N-1, B13.10 reactor vessel interior at GGNS, Unit 1, until RF-20 in 2016. The reactor vessel interior (Category B-N-1, B13.10) shall be examined using VT-3 technique in 2016.
All other requirements of ASME Code,Section XI, for which relief was not specifically requested and authorized by the NRC staff remain applicable, including the third party review by the Authorized Nuclear In-service Inspector.
The NRC staffs goal is to issue the written safety evaluation within 150 days in accordance with the Office of Nuclear Reactor Regulation standards.
2
Hearing Identifier: NRR_PMDA Email Number: 1146 Mail Envelope Properties (James.Kim@nrc.gov20140306072000)
Subject:
Verbal Authorization for Grand Gulf Relief Request, GG-ISI-17 Sent Date: 3/6/2014 7:20:36 AM Received Date: 3/6/2014 7:20:00 AM From: Kim, James Created By: James.Kim@nrc.gov Recipients:
"Wang, Alan" <Alan.Wang@nrc.gov>
Tracking Status: None "Broaddus, Doug" <Doug.Broaddus@nrc.gov>
Tracking Status: None "Rosenberg, Stacey" <Stacey.Rosenberg@nrc.gov>
Tracking Status: None "Cheruvenki, Ganesh" <Ganesh.Cheruvenki@nrc.gov>
Tracking Status: None "Allen, Don" <Don.Allen@nrc.gov>
Tracking Status: None "Smith, Rich" <Rich.Smith@nrc.gov>
Tracking Status: None "Robinson, Christopher" <crobin8@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 5209 3/6/2014 7:20:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: