ML24152A266

From kanterella
Jump to navigation Jump to search
Submittal of Updated Final Safety Analysis Report
ML24152A266
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/23/2024
From: Kapellas B
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML24152A291 List:
References
GNRO2024-00018
Download: ML24152A266 (1)


Text

) entergy GNRO2024-00018 May 23, 2024 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 Brad Kapellas Site Vice President Grand Gulf Nuclear Station Tel: 601-437-7500 10 CFR 50.73

SUBJECT:

Grand Gulf Nuclear Station, Unit 1 Updated Final Safety Analysis Report Submittal Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 Renewed License No. NPF-29 Pursuant to the requirements of §1 O CFR 50.71 (e) and 50.4(b)(6), Entergy Operations Inc.

hereby submits one pdf copy on CD-ROM (Enclosure) of the Grand Gulf Nuclear Station (GGNS) Updated Final Safety Analysis Report (UFSAR). The UFSAR pdf is a complete copy of the 1 O CFR 50 Appendix B controlled copy of the UFSAR. This revision of the UFSAR includes changes made to the facility as described in the UFSAR during the period of July 20, 2022 through April 30, 2024. One USB and one CD are enclosed and labeled GGNS UFSAR-Full and GGNS UFSAR-Redacted.

In addition to the requirements of §10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, this update must include any Structures, System, or Components (SSCs) with newly identified Aging Management evaluations in accordance with

§1 O CFR 54.21. There were no newly identified SSCs subject to aging management review or evaluation during the specified period.

This letter contains no new Regulatory Commitments. Should you have any questions concerning the content of this letter, please contact Jeff Hardy, Manager Regulatory Assurance at 802-380-5124. I declare under penalty of perjury; that the foregoing is true and correct.

Executed on Letter Date May 23, 2024.

GNRO2024-00018 Page 2 of 2 Sincerely, ellas

Enclosure:

1. Grand Gulf Nuclear Station UFSAR-Full
2. Grand Gulf Nuclear Station UFSAR-Redacted cc:

NRC Region IV - Regional Administrator NRC Senior Resident Inspector, Grand Gulf Nuclear Station NRR Project Manager

Meister, Richard From:

Sent:

To:

Cc:

Subject:

Jarvis, WOODS, SHIRLEY A Thursday, May 23, 2024 8:11 AM Sims, Jarvis Meister, Richard FedEx Here the information to for the FedEx package.

Ship To :

U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Mail Stop OWFN/8 Bl 11555 Rockville Pike Rockville, MD 20852-2738 From:

Jeffery Hardy/Richard Meister Grand Gulf Nuclear Station 7003 Bald Hill Road Port Gibson, MS 39150 Phone: 601-437-6685 Budget:

BU - ROOOO Dept. - NSCLl Project - F5PPNROGLO Resource - 298 Activity - LIDO Physical Location - GGl

%anf<:?1 Sliirfe!J JI.. 'Wooas

{j{j9\\[S 1(&Jl Jlaministrative Specia[ist I'V Office: 601-437-6399

'Email-swoorfs@entergy.com

} entergy