MONTHYEARML13310A9171983-08-26026 August 1983 Notifies That Proposed Change to Tech Specs Re Battery Surveillance Requirements Will Be Submitted in Oct 1983. Results of Recent 60-month Battery Performance Test Will Also Be Delayed Due to Efforts Involved Project stage: Request ML13310B0951983-11-28028 November 1983 Application to Amend License DPR-13,consisting of Proposed Change 126 to Tech Specs,Revising Limiting Conditions for Operation & Corresponding Surveillance Requirements for Electrical Supplies Project stage: Request ML13310B0921983-11-30030 November 1983 Forwards Application to Amend License DPR-13,consisting of Proposed Change 126 to Tech Specs,Specifying Limiting Conditions for Operation & Surveillance Requirements for Electrical Supplies for Each Mode of Operation Project stage: Request ML13310B0971983-11-30030 November 1983 Existing & Proposed Tech Specs 3.7, Auxiliary Electrical Supply, & 4.4, Emergency Power Sys Periodic Testing Project stage: Other ML13316A5731983-12-22022 December 1983 Advises That Proposed Change 126 to Tech Specs to Delete Existing Auxiliary Feedwater Pump Requirements in Section 4.4.E Does Not Provide Adequate Justification for Deletion of Provisions of Spec Project stage: Other ML13310B1341983-12-30030 December 1983 Submits Addl Info to Support Util 831130 Proposed Change 126 to Delete Tech Spec 4.4.E Re Operability of Auxiliary Feedwater Sys.Surveillance Requirements in Tech Spec 4.4.E Superseded by Tech Spec 4.1.9 Issued in Amend 65 Project stage: Request ML13310B1421984-01-13013 January 1984 Requests No Addl Consideration Be Given to Removal of Tech Spec 4.5.E as Part of Proposed Change 126 Submitted on 831130.Removal of Surveillance Requirement for Auxiliary Feedwater Sys Will Be Handled in Future Proposed Change Project stage: Request ML13310B2891984-03-0909 March 1984 Forwards Request for Addl Info Re Proposed Changes 76 & 126 to Tech Specs.Info Requested within 30 Days of Ltr Date Project stage: RAI ML13310B3241984-04-12012 April 1984 Addl Info Re Proposed Changes 76 & 126 to License DPR-13. Response to NRC 840309 Request for Info Will Be Submitted in 45 Days,Following Replacement of Dc Battery Bank 1 Due to End of Svc Life Project stage: Request ML13310B6031984-07-27027 July 1984 Forwards Addl Info Re Proposed Changes 76 & 126 to Tech Specs,In Response to NRC 840309 Request.Calculation Sheets Encl.W/Three Oversize Drawings.Aperture Cards Available in PDR Project stage: Request ML13330A4461984-10-15015 October 1984 Application to Amend License DPR-13,revising Proposed Change 126,to Maintain Battery Charger Output Current Consistent W/Existing Tech Specs & to Omit Operability Contingency That Battery Parameters Must Be within Allowable Values Project stage: Request ML13316A7431984-11-14014 November 1984 Amend 84 to License DPR-13,approving Changes to Tech Specs & Bases to Incorporate Mods to Operability & Surveillance Requirements for Auxiliary Electric Supplies Project stage: Other ML13316A7461984-11-14014 November 1984 Safety Evaluation Supporting Amend 84 to License DPR-13 Project stage: Approval ML13316A7401984-11-14014 November 1984 Forwards Amend 84 to License DPR-13 & Safety Evaluation. Amend Approves Tech Spec Changes & Bases Incorporating Mods to Operability & Surveillance Requirements for Auxiliary Electric Supplies Project stage: Approval 1984-01-13
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE KENNETH P. BASKIN ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE PRESIDENT 213-572-1401 November 30, 1983 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Amendment No. 116 San Onofre Nuclear Generating Station Unit 1 Enclosed are three executed and thirty-seven conformed copies of Amendment No. 116 in Docket No. 50-206. Amendment No. 116 consists of Proposed Change No. 126 to the Technical Specifications incorporated into Provisional Operating License No. DPR-13 as Appendices A and B.
Proposed Change No. 126 is a request to revise Appendix A Technical Specifications 3.7, Auxiliary Electrical Supply, and 4.4, Emergency Power System Periodic Testing. This proposed change will specify the limiting conditions for operation and corresponding surveillance requirements for the station electrical supplies for each mode of operation.
By application dated October 20, 1978 (Proposed Change No. 76) we requested a revision to Technical Specification 4.4. The Commission granted partial approval of this application in Amendment No. 56 to Provisional Operating License No. DPR-13. The Commission determined that further study was necessary before approval could be granted to the remaining open items in Proposed Change No. 76. The NRC staff has indicated that an acceptable resolution to Proposed Change No. 76 open items is to revise Technical Specification 4.4 consistent with the Standard Technical Specifications.
Accordingly, Proposed Change No. 126 is being submitted consistent with the NRC staff recommended resolution of Proposed Change No. 76 open items. In accordance with 10 CFR 170.22, Proposed Change No. 76 was'determined to be a Class III amendment and a Southern California Edison Company check for
$4,000.00 was provided with the October 20, 1978 application. Since submittal 8312020336 831130 PDR ADOCK 05000206 PDR
Mr. H.
November 30, 1983 of Proposed Change No. 126 has been requested by the NRC staff and is being submitted to, support the NRC staff review of Proposed Change No. 76, no additional fee is required.
Very truly yours.,
Enclosures cc:
J. B. Martin., Regional Administrator, NRC Region V J. 0. Ward, Chief, Radiological Health Branch, State Department of Health Services