ML13289A221

From kanterella
Jump to navigation Jump to search
6.a.ii.9 Sequoyah Nuclear Plant, Hours of Operation Annual Air Report 2007
ML13289A221
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/01/2008
From: Nida D
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Tennessee Valley Authority
To: Frazier J
Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A221 (3)


Text

558 080501 800 Air Correspondence May 1,2008 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Enclosed with this letter is the annual report on the hours of operation for Auxiliary Boilers A and B; Diesel Generators 1-A, 1-B, 2-A, and 2-B3; and Blackout Diesel Generators I and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-1I1C. This report covers the period from April 1, 2007 to March 31, 2008. If you have any questions regarding this report, please contact me at (423)843-7332.

Sincerely,

~4U~ '4 Diedre B. Nida Chemistry/Environmental Support Manager Signatory Authority for Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN J. D. Smith, OPS 4A-SQN T. P. Cleary, OPS 4A-SQN G. R. Signer, WT 6A-K D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)

Tennessee Valley Authority, Post Ofice Box 2000, Soddy-Daisy, Tennessee 37384-2000 May 1, 2008 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Enclosed with this letter is the annual report on the hours of operation for Auxiliary Boilers A and B; Diesel Generators I1-A, I -B, 2-A, and 2-B; and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-1 1C. This report covers the period from April 1, 2007 to March 31, 2008. if you have any questions regarding this report, please contact me at (423)843-7332.

Sincerely, Diedre B. Nida Chemistry/Environmental Support Manager Signatory Authority for Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Enclosure P, W-e -- ,oJ~e pd o

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2007 to MARCH 31, 2008 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxilliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 59.8 Hours Generator 1-A Emergency Diesel 204 Hours 56.3 Hours Generator 2-A Emergency Diesel 204 Hours 63.9 Hours Generator 1-B Emergency Diesel 204 Hours 59.8 Hours Generator 2-B Blackout Diesel 204 Hours 5.0 Hours Generator 1 Blackout Diesel 204 Hours 5.0 Hours Generator 2