ML13170A141

From kanterella
Jump to navigation Jump to search
Comment (60) of Gary Shaw on Behalf of Himself Opposing Entergy'S Request for Exemption from Fire-safe Federal Regulation Standards for Indian Point Unit 3
ML13170A141
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/29/2013
From: Shaw G
Indian Point Safe Energy Coalition
To:
Rules, Announcements, and Directives Branch
References
78FR26662 00060, NRC-2013-0063
Download: ML13170A141 (1)


Text

RULES AND DIRECTIVES BRA-NCH LI, in "'As of: June 11., 2013 Received:

May 29, 2013 PUBLIC SUB I SS10N 0 1 3 JUN 11 Pn 3: Status: PendingPost Tracking No. ljx-85ml-5tps Comments Due: June 03, 201 Submission Type: Web Docket: NRC-2013-0063 R EC EIVED Draft Environmental Assessment and Finding of No Significant Impact Comment On: NRC-2013-0063-0002 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3; Extension of Public Comment Period Document:

NRC-2013-0063-DRAFT-0049 Comment on FR Doc # 2013-10792 1 of 1 13 Submitter Information Name: Gary Shaw Address: 9 Van Cortlandt Pl.Croton on Hudson, NY, 10520 Organization:

Indian Poiint Safe Energy Coalition 4-3;/L26~General Comment It is unconscionable that the NRC could not get the industry to test Hemyc because the NEI said there was not enough evidence to warrant industry expenditures, so NRC had to run their own tests and found the fire protection material deficient.

Yet the agency did not force the operator to retrofit with better insulation, the agency granted another regulatory extemption.

This is unacceptable and should be an embarrassment to the agency that constantly touts its integrity.

I believe the agency should be totally dismantled and reconstituted with nuclear engineers who actually put public health and safety ahead of industry financials.

It should be noted that the Region 1 Administrator who granted that exemption is the same one who was severely criticized by the NRC Inspector General's Office for putting the financial impact of the operator above public safety when he let Davis-Besse get within one quarter of an inch of breach of containment.

Where are the lessons learned? Shame on you NRC.SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add= D. Pickett (dvpl)https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=09000064812ffc74&for...

06/11/2013