Email from J. Mitman, NRR to R. Wescott, Rii OUO - Sensitive Information - Apob Jocassee Hydrograph
ML13066A756
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/09/2011
From: Jeffrey Mitman
Office of Nuclear Reactor Regulation
To: Wescott R
NRC/RGN-II
References
FOIA/PA-2012-0325
Download: ML13066A756 (7)


Text

Mitman, Jeffrey From: Mitman, Jeffrey Sent: Sunday, January 09, 2011 5:42 PM To: Wescott, Rex Cc: Ferrante, Fernando

Subject:

RE: " t -- APOB Jocassee Hydrograph Rex, February works for me. It will be good and useful to discuss approaches and understandings. I'm not too concerned with specific values. I'm more interested in ranges of the inputs and what the modeling can tell us about the ranges of potential consequences to ONS. There is always more for me to learn and your help is appreciated.

Jeff From: Wescott, Rex Sent: Friday, January/0,2011 9:14 AM To: Mitman, Jeffrey

Subject:

RE: '"O .... *,,ve lriru,,,,ation -- APOB Jocassee Hydrograph I'm occupied with preparation for a hearing up to the end of January, but we should be able to get together in February. I'm sure that we'll have some different values for some inputs, discussing the methodology should be beneficial.

From: Mitman, Jeffrey Sent: Thursday, January 06, 2011 6:15 PM To: Wescott, Rex Cc: Ferrante, Fernando

Subject:

RE: nL'-o- SznJst 1 iL 1i an ý-e013 Jocassee Hydrograph AOB Rex, when you have time I would like to compare methods and results.

Thanks.

Jeff From: Wescott, Rex Sent: Thursday, January 06, 2011 8:53 AM To: Mitman, Jeffrey; Coleman, Neil; Rogers, Walt Cc: Khanna, Meena; Wilson, George; Rodriguez, Veronica; Ferrante, Fernando

Subject:

RE: .Ohf - inormation -- APOB Jocassee Hydrograph "St

Jeff, Thanks, I was playing some of the same games with the LAW Engineering Jocassee PMF early on using the HEC-1 computer program when I was evaluating the effects of a larger CN value as suggested by Ken See. I also looked at different assumptions of turbine inoperability. I'll have to get all my runs together and compare notes with you and Fernando. I think that there are lots of insights to be gained, especially if we could get a better handle on extreme storm probability, particularly the PMF and fractions of the PMF.

Rex From: Mitman, Jeffrey Sent: Wednesday, January 05, 2011 5:23 PM To: Coleman, Neil; Wescott, Rex; Rogers, Walt

Cc: Khanna, Meena; Wilson, George; Rodriguez, Veronica; Ferrante, Fernando

Subject:

- m

. i -- APOB Jocassee Hydrograph All, before the break we discussed the calculations that Fernando and I put together in Matlab and Excel. The Excel spreadsheet is attached for your consideration. The Matlab and Excel analyses are consistent. The Matlab results are not included as there is no way to allow user manipulation without a copy of Matlab.

The first Excel tab shows the hydrograph. The current spreadsheet values should mimic the "Law" hydrograph (from Jocassee Dam Hydrologic Analysis by Law Environmental, dated January 1991 as updated through 6/16/2009). It can easily be tweaked to show different scenarios by changing the cells highlighted in red.

These red cells are setup to allow different what-if analysis. For example if one turbo-generator is unavailable, change the value labeled "Turbine-Generators Available" from 4 to 3. The 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> PMF has been subdivided into 4340 time-steps, each of about 1 minute. Therefore, once a change is made, the spreadsheet will take a second or two to recalculate and display the new results.

The second tab shows the various curves that were derived to represent reservoir and spillway characteristics.

The bottom line is: These tools allow us to explore what conditions would cause Jocassee Reservoir level to exceed 1110 ft. msl.

A couple of points.

1. The PMP inflow values are taken directly from the "Law" analysis. If there are problems with the PMP inflow they come from "Law" and I have no capability of calculating the inflow. However, the spreadsheet does allow "what-ifs" on fractions of the PMP including those greater than the PMP. To try a storm of "half' the PMP change the cell labeled "Fraction of PMF by Total Volume" from I to 0.5. This multiplies the inflow at every time step by 0.5. Its effect is to decrease the total inflow by 50%.
2. All of the parameters for spillway capacity, generator capacity, reservoir volume by reservoir height, etc.

are taken directly from various Duke supplied reports including the "Law" analysis and the 1-D results supplied in -March 2009.

3. I've added the capability to what-if a failure of one or both of the spillways to open. There are spreadsheet switches to model these scenarios. Under these conditions I've assumed that each unopened spillway will overtop when level exceeds 1110 ft. msl as that is the physical top of the spillway. The flow across the top of an unopened spillway is a swag on my part, I've assumed the flow would mimic an opened spillway with a bottom elevation of 1110. It's not accurate, it's probably non-conservative (i.e., it gives too much credit) but it should be reasonably close and much better than assuming the unopened spillway passes no flow.
4. I've differentiated between "early" and "late" turbine-generator flow to allow exploration of the possibility that the TGs might be available early but then fail late potentially due to the unavailability of the switchyard due to the very large storm. The initial condition of the spreadsheet has the TGs available both early and late. If you want to see the impact of TGs unavailable late simply change the "Total Late Generator Flow" to zero (or any other value you may want to explore). The cutoff time between early and late was arbitrarily set at 1900 minutes based on my judgment that they might fail when the storm inflows become substantial which I picked off the PMP graph at a time when the PMP inflows exceeded the TG capacity. This is arbitrary but I don't believe that the choice of time would substantially change the results. If you want to pick a different time, a small change to the spreadsheet would allow additional analysis. (There currently is no spreadsheet "switch" to allow this change.)
5. I've added the capability to explore both "30" and "38" foot wide spillways. The base analysis was performed with a 30 foot spillway. If a 38 foot spillway is used, the results change moderately. I'm not convinced that 38 ft. spillways is appropriate (or inappropriate) because Duke has not provided a bases for the wider value. Likewise, the spillways analysis does not take into consideration that there is a bridge across the top of the spillways starting at -1123.5 ft. A more accurate calculation would take this bridge into account and change the flow from a "weir" model to an "orifice" model at high reservoir levels. Ignoring the bridge is somewhat non-conservative by increasing the spillway capacity ifthe level should approach the top of the spillway.

2

6. Finally, this model is not in any way accurate if level goes over the top of dam. No attempt was made to model flow across the top of the dam. The only thing this model will tell you in this case is that level has exceed 1125 ft. msl.

If you have questions or comments, please let me know.

Jeff 3

Jocassee Spillway Rating 90000 80000 I - ________ ________ 4 +/- 4 70000 60000 + 4 - -~-

--- Chow

' 50000 II * +/- I i


LAW HEC-1 U 40000 -- HDR/DTA 30000 20000 10000 0 +

111* 1112 1114 1116 1118 1120 1122 1124 1126 water level, ft msl

Jocassee Spillway Rating 90000 80000 70000

..- Chow "G 50000 - LAW HEC-1 40000 .. ... HDR/DTA 30000 20000 10000 0

1110 1112 1114 1116 1118 1120 1122 1124 1126 water level, ft msl

Jocassee Spillway rating 90000 80000 70000 60000 50000 0--Chow I-

--- LAW HEC-1 MU a

40000 HDR/DTA 30000 20000 10000 -

0 1110 1112 1114 1116 1118 1120 1122 1124 1126 water level, ft

1 -

elev Chow LAW HEC-1 HDR/DTA 1111 47937 40,875 49,484 56,000 LAW and I HDR/DTA 1112 50,068 42,474 51,020 59,000 1114 54,420 45,696 54,987 63,000 1116 58,891 48,939 58,088 69,000 1118 63,479 52,201 61,545 68,000 1120 68,180 55,475 65,274 71,000 1122 72,992 58,759 69,140 73,000 1123.5 76,671 61,222 71,503 1123.51 55,663 1125 58,453