WBN2Public Resource From: Poole, Justin Sent: Friday, May 11, 2012 4:19 PM To: 'garent@tva.gov' Cc: WBN2HearingFile Resource

Subject:

RE: DRAFT Need for clarification on Fire Protection Report Attachments: WBN clarifying question (5-11-12) (revised).docx

Gordon, As a follow on to the email sent Thursday afternoon, the staff would like to add the attached question to the ones sent previously. Again, this email does not convey a formal NRC staff position, and it does not formally request information. Thanks.

Justin C. Poole Sr. Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov From: Poole, Justin Sent: Thursday, May 10, 2012 3:07 PM To: 'garent@tva.gov' Cc: WBN2HearingFile Resource

Subject:

DRAFT Need for clarification on Fire Protection Report

Gordon, In reviewing TVAs recent FPR submittal, the staff has come up with the attached questions. Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained, and to determine if the information was previously docketed. If further clarification is needed, and you would like to discuss the questions in a conference call, let us know. This email does not convey a formal NRC staff position, and it does not formally request for additional information.

1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 689 Mail Envelope Properties (19D990B45D535548840D1118C451C74DDFE935558A)

Subject:

RE: DRAFT Need for clarification on Fire Protection Report Sent Date: 5/11/2012 4:19:03 PM Received Date: 5/11/2012 4:19:05 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None

"'garent@tva.gov'" <garent@tva.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1160 5/11/2012 4:19:05 PM WBN clarifying question (5-11-12) (revised).docx 16932 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

9. The description of Fire Area 2-1 (Part VI, Section 3.4.1, RHR Pump Room 1B-B) is, in part:

This is a separate fire area and the capability to achieve safe shutdown has been demonstrated through analysis. Yet, Part I, Table I-1 shows that Fire Area 2-1 has a III.G.1 Appendix R compliance strategy. This classification is only appropriate for fire areas that do not contain redundant trains of equipment or cables.

Does Fire Area 2-1 (RHR Pump Room 1B-B) contain redundant trains of equipment or cables? If so, identify the III.G compliance strategy of this fire area, and reference the appropriate evaluation deviation that addresses the analysis. If not, the description in the FPR of this area should be aligned with the other, similar fire areas (RHR Pump Room 1A-A, as an example).