MONTHYEARML24253A1932024-05-21021 May 2024 PV-2024-04 Exam Security Agreement (Final) ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24170B0072024-05-0909 May 2024 11-PV-2024-04 Public Forms ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23151A6492023-05-11011 May 2023 11-PV-2023-05 Public Forms ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22196A3782022-07-15015 July 2022 Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22143A9892022-05-19019 May 2022 PV-2022-05-Post Exam Comments ML22144A0232022-05-12012 May 2022 2022-05-DRAFT Op Test Comments ML22143A9872022-05-12012 May 2022 PV-2022-05-FINAL Op Test ML22143A9882022-05-12012 May 2022 PV-2022-05-FINAL Written Exam ML22144A0252022-05-12012 May 2022 2022-05-DRAFT Outline Comments ML22144A0292022-05-12012 May 2022 PV-2022-05-Final Outlines ML22144A0282022-05-12012 May 2022 PV-2022-05-DRAFT Written Exam ML22144A0262022-05-12012 May 2022 PV-2022-05-Draft Outlines ML22144A0242022-05-12012 May 2022 2022-05-DRAFT Op Test ML22144A0272022-05-12012 May 2022 PV-2022-05-DRAFT Written Exam Comments ML22178A1772022-04-12012 April 2022 PV-2022-05-Public Forms ML23193A8502022-04-12012 April 2022 PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist ML22070A1382022-03-10010 March 2022 Response to Regulatory Issue Summary (RIS) 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21160A0832021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21147A5452021-05-0606 May 2021 04 Public Forms ML21147A5442021-05-0606 May 2021 04 Post Examination Analysis ML21106A3042021-04-16016 April 2021 Response to Regulatory Issue Summary (RIS) 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21020A0932020-12-10010 December 2020 11 Draft Written Examination Comments ML21020A0912020-12-10010 December 2020 11 Draft Outline Comments ML21020A0922020-12-10010 December 2020 11 Draft Outlines ML21020A0972020-12-10010 December 2020 11 Final Written Examination ML21020A0902020-12-10010 December 2020 11 Draft Operating Test ML21020A0942020-12-10010 December 2020 11 Draft Written Examination ML21020A0982020-12-10010 December 2020 2020-11 Draft Operating Test Comments ML21020A0952020-12-10010 December 2020 11 Final Operating Test ML21020A0962020-12-10010 December 2020 11 Final Outlines ML21020A1042020-12-10010 December 2020 11 Public Forms ML21020A1032020-12-10010 December 2020 11 Post Examination Analysis ML20325A3682020-11-20020 November 2020 NRC Initial Operator Licensing Examination Approval 05000528/2020301; 05000529/2020301; 05000530/2020301 ML20199M3832020-07-17017 July 2020 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20003E2762019-10-11011 October 2019 PV-2019-10 Post Exam Comments and Analysis ML19273C8072019-09-30030 September 2019 NRC Initial Operator Licensing Exam Approval Letter 05000528/529/530/2019301 ML19135A3352019-05-15015 May 2019 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20042C1192019-03-12012 March 2019 PV-2019-10 Public Forms ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18284A4942018-09-25025 September 2018 NRC Retake Initial Operator Licensing Examination Approval 05000528/2018302, 05000529/2018302 and 05000530/2018302 ML18184A3552018-06-29029 June 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update 2024-05-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24253A1932024-05-21021 May 2024 PV-2024-04 Exam Security Agreement (Final) ML24170B0072024-05-0909 May 2024 11-PV-2024-04 Public Forms ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23151A6492023-05-11011 May 2023 11-PV-2023-05 Public Forms ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22196A3782022-07-15015 July 2022 Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22143A9892022-05-19019 May 2022 PV-2022-05-Post Exam Comments ML22143A9882022-05-12012 May 2022 PV-2022-05-FINAL Written Exam ML22144A0262022-05-12012 May 2022 PV-2022-05-Draft Outlines ML22144A0232022-05-12012 May 2022 2022-05-DRAFT Op Test Comments ML22144A0252022-05-12012 May 2022 2022-05-DRAFT Outline Comments ML22143A9872022-05-12012 May 2022 PV-2022-05-FINAL Op Test ML22144A0242022-05-12012 May 2022 2022-05-DRAFT Op Test ML22144A0272022-05-12012 May 2022 PV-2022-05-DRAFT Written Exam Comments ML22144A0292022-05-12012 May 2022 PV-2022-05-Final Outlines ML22144A0282022-05-12012 May 2022 PV-2022-05-DRAFT Written Exam ML23193A8502022-04-12012 April 2022 PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist ML22178A1772022-04-12012 April 2022 PV-2022-05-Public Forms ML22070A1382022-03-10010 March 2022 Response to Regulatory Issue Summary (RIS) 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21160A0832021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21147A5442021-05-0606 May 2021 04 Post Examination Analysis ML21147A5452021-05-0606 May 2021 04 Public Forms ML21106A3042021-04-16016 April 2021 Response to Regulatory Issue Summary (RIS) 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21020A0932020-12-10010 December 2020 11 Draft Written Examination Comments ML21020A0902020-12-10010 December 2020 11 Draft Operating Test ML21020A1042020-12-10010 December 2020 11 Public Forms ML21020A1032020-12-10010 December 2020 11 Post Examination Analysis ML21020A0962020-12-10010 December 2020 11 Final Outlines ML21020A0912020-12-10010 December 2020 11 Draft Outline Comments ML21020A0942020-12-10010 December 2020 11 Draft Written Examination ML21020A0952020-12-10010 December 2020 11 Final Operating Test ML21020A0922020-12-10010 December 2020 11 Draft Outlines ML21020A0982020-12-10010 December 2020 2020-11 Draft Operating Test Comments ML21020A0972020-12-10010 December 2020 11 Final Written Examination ML20325A3682020-11-20020 November 2020 NRC Initial Operator Licensing Examination Approval 05000528/2020301; 05000529/2020301; 05000530/2020301 ML20199M3832020-07-17017 July 2020 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20003E2762019-10-11011 October 2019 PV-2019-10 Post Exam Comments and Analysis ML19273C8072019-09-30030 September 2019 NRC Initial Operator Licensing Exam Approval Letter 05000528/529/530/2019301 ML19135A3352019-05-15015 May 2019 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20042C1192019-03-12012 March 2019 PV-2019-10 Public Forms ML18284A4942018-09-25025 September 2018 NRC Retake Initial Operator Licensing Examination Approval 05000528/2018302, 05000529/2018302 and 05000530/2018302 ML18184A3552018-06-29029 June 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update ML18122A3722018-05-0101 May 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17124A2082017-05-0404 May 2017 Response to Regulatory Issue Summary (RIS) 2017-03, Preparation and Scheduling of Operator Licensing Examinations 2024-05-09
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: PVNGS First Exam Date: 3/2012 Written Exam Outline (9/21/2011)
Comment Resolution The SRO-only outline does not reflect This will be on Rev 1 of the 401-2.
1 the changes described in the ES-401-4 Rejected KAs document.
RO Tier 1 / Group 2: CE/A11 RCS The error was corrected and subsequently 2 Overcooling - PTS, EK3.1 should read this KA was rejected.
AK3.1 RO Tier 1 / Group 2: CE/A13 Natural This is Correct and will be changed to reflect Circ., EK1.2 - Normal, abnormal and AK1.2 Natural Circulation Operations.
emergency operating procedures associated with (Natural Selection 3
Operations). SHOULD READ AK1.2 -
Normal, abnormal and emergency operating procedures associated with (Natural Circulation Operations) 4 5
Administrative JPM Outline (11/9/11)
Comment Resolution Label the JPMs A-1 through A-9 starting Done 1
with the RO JPMs.
2 Control Room / In-Plant System JPM Outline (11/9/11)
Comment Resolution 1 JPM e., should RDT read RTD? No, RDT is correct for Reactor Drain Tank.
Label the JPMs S-1, S-2, P-1, etc., and Done as much as practical.
make the JPMs line up between RO, 2 SRO-I, and SRO-U so that its easily identified which ones are common among all applicants.
JPM g on the SRO-I outline (JPM c This is correct. The g JPM on the SRO-I will 3 on SRO-U) does not appear on the RO not be done by the ROs.
outline. Clarify if this is intentional or not. OBDI 202 - ILE Process
Simulator Scenario Outline Comments (11/9/11)
Comment Resolution On final D-1s, include the chart of Done Target Quantity Attributes found at the 1
bottom of Form ES-301-4 as an examiners aid.
Scenario 1, should there be a Critical No, SBCS is available so this would not 2 Task to commence cooldown prior to happen without a SBCS failure.
lifting the SG Safety Valve?
Scenario 2 Event 5 could be a Changed (also changed on 301-5) 3 Component Malfunction instead of Normal Evolution.
Scenario 2 Events 8 and 9, the word Fixed 4
CRITICAL is misspelled.
5 Scenario 4 Event 8 is a Major transient. Changed to a major (also changed on 301-5)
When the D-2s are generated, for each Done 6 scenario, include a one page synopsis of how each event will play out.
General Outline Comments (9/21/11)
Need to send the original copy of draft Received with Operating Test outline 1 outline quality checklist ES-201-2 (may submittal.
send it with the draft op test outline)
What plant-specific priorities (including Aux Feed and Class electrical power issues PRA and IPE insights) are covered in the are covered on the exam. These are 2 major appropriate exam sections? inputs to PRA.
2 Will add to comment section of appropriate question.
RO#s 12,14,15,48,49 Any recent OE included (plant specific or Yes. Previous site specific OE has been other)? incorporated into written and operating exams.
3 Will add to comment section of appropriate question.
RO#s 18,50,51 Are differences between units being Yes, Unit differences are slight at PVNGS but tested on? a sampling of topics will address this.
4 Will add to comment section of appropriate question.
RO# 14 OBDI 202 - ILE Process
Are they any operationally-important, No, PVNGS has not added any systems or site-specific systems/evolutions which evolutions that meet this criterion.
5 are not included on form ES-401-2 that should be?
Outline Generation Methodology: This is the Westinghouse KA exam generator Describe how the program functions, program. The suppression list is incorporated how it ensures a random and systematic by manually deselecting the KA from the sampling, and how the K/A Suppression programs database as a suppressed KA.
List is incorporated into it. Also, the The list of suppressed KAs was generated by document provided describes the 2010 the Westinghouse program and sent as such.
exam, not the 2012 exam.
6 Less than 2.5 has been evaluated per our previous correspondence.
See attached documentation provided by Westinghouse.
XXI. Random Selection Methodology For the random selection of both the RO and SRO exam, the random number generator is seeded with the ticks from the system clock. This helps to ensure a different seed every time an exam outline is generated.
Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list.
Begin Loop
- 1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
- 2) Select the system in the same row as the random number.
- 3) Create list of KAs for Tier, ROGroup, and randomly selected system number.
- 4) Generate a random number between 1 and number of KAs in KA list.
- 5) Pick KA from KA list at the row designated by the random number.
- 6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
- 7) Add KA To RO outline.
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Go back to top of list until all tiers, groups, and categories have been cycled through.
36 Random Selection: SRO Exam OBDI 202 - ILE Process
25 SRO Only KAs are first selected for the following categories:
Tier 1: A2 and G (10 KAs are selected)
Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected)
Tier 3 (7 KAs are selected, at least one for each category)
System lists are generated based upon the following criteria:
Tier, SROGroup, Category, SROOnly = True in tblCFRs Then 25 KAs are selected based upon systems selected with the following criteria:
Tier, SROGroup, Category Select Tier, Group, and Category to add KAs to.
Generate Random Number Between 1 and number of systems in the list.
Begin Loop
- 1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
- 2. Select the system in the same row as the random number.
- 3. Create list of KAs for Tier, SROGroup, and randomly selected system number.
- 4. Generate a random number between 1 and number of KAs in KA list.
- 5. Pick KA from KA list at the row designated by the random number.
- 6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
7.Add KA To SRO outline.
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Go back to top of list until all tiers, groups, and categories have been cycled through. OBDI 202 - ILE Process