Audit of the Licensee'S Management of Regulatory Commitments, Audit Performed August 16-17, 2011
ML112440514
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/23/2011
From: Balwant Singal
Plant Licensing Branch IV
To: Flores R
Luminant Generation Co
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC ME5298, TAC ME5299
Download: ML112440514 (18)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 23, 2011 Mr. Rafael Flores Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 SUB~IECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - AUDIT OF THE LICENSEE'S MANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS. ME5298 AND ME5299)

Dear Mr. Flores:

In Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000, the U.S. Nuclear Regulatory Commission (NRC) informed licensees that the Nuclear Energy Institute (NEI) document NEI 99-04, "Guidelines for Managing NRC Commitment Changes," contains acceptable guidance for controlling regulatory commitments and encouraged licensees to use the NEI guidance or similar administrative controls to ensure that regulatory commitments are implemented and that changes to the regulatory commitments are evaluated and, when appropriate, reported to the NRC.

The NRC Office of Nuclear Reactor Regulation has instructed its staff to perform an audit of licensees' commitment management programs once every 3 years to determine whether the licensees' programs are consistent with the industry guidance in NEI 99-04, and that the regulatory commitments are being effectively implemented.

An audit of Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2, commitment management program was performed at the plant site on August 16-17, 2011. The NRC staff concludes, based on the audit, that Luminant Generation Company LLC (the licensee) has implemented NRC commitments on a timely basis, and (2) the licensee has implemented an effective program for managing NRC commitment changes at CPNPP, Units 1 and 2. The details of the audit including the NRC staff's observations and recommendations are set forth in the enclosed audit report.

R. Flores -2 The NRC staff appreciates the resources that were made available by your staff, both before and during the audit. If there are any questions, I can be contacted at (301) 415-3016.

Sincerely, b ~'- l ~i ~~ l~C'0 i

Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446

Enclosure:

Audit Report cc w/encls: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION LICENSEE MANAGEMENT OF REGULATORY COMMITMENTS LUMINANT GENERATION COMPANY LLC COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446

1.0 INTRODUCTION AND BACKGROUND

In Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML003741774), the U.S. Nuclear Regulatory Commission (NRC) informed licensees that the Nuclear Energy Institute (NEI) document NEI 99-04, "Guidelines for Managing NRC Commitment Changes," contains acceptable guidance for controlling regulatory commitments and encouraged licensees to use the NEI guidance or similar administrative controls to ensure that regulatory commitments are implemented and that changes to the regulatory commitments are evaluated and. when appropriate, reported to the NRC.

The NRC Office of Nuclear Reactor Regulation (NRR) has instructed its staff to perform an audit of licensees' commitment management programs once every 3 years to determine whether the licensees' programs are consistent with the industry guidance in NEI 99-04, and that the regulatory commitments are being effectively implemented.

NEI 99-04 defines a "regulatory commitment" as an explicit statement to take a specific action agreed to. or volunteered by. a licensee and submitted in writing on the docket to the NRC.

NRR guidelines direct the NRR Project Manager to audit the licensee's commitment management program by assessing the adequacy of the licensee's implementation of a sample of commitments made to the NRC in past licensing actions (amendments, relief requests, exemptions, etc.) and licensing activities (bulletins, generic letters, etc.). The audit is to be performed every 3 years.

2.0 AUDIT PROCEDURE AND RESULTS An audit of the Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2 commitment management program was performed at the plant site on August 16-17, 2011. The audit reviewed commitments made since the previous audit on June 9,2008 (audit report issued on July 31,2008 (ADAMS) Accession No. ML081970666). The audit consisted of two major parts:

Enclosure

-2 (1) verification of the licensee's implementation of NRC commitments that have been completed, and (2) verification of the licensee's program for managing changes to NRC commitments.

2.1 Verification of Licensee's Implementation of NRC Commitments The primary focus of this part of the audit is to confirm that the licensee has implemented commitments made to the NRC as part of past licensing actions/activities. For commitments not yet implemented, the NRC staff determines whether they have been captured in an effective program for future implementation.

2.1.1 Audit Scope The audit addressed a sample of commitments made during the review period. The audit focused on regulatory commitments (as defined above) made in writing to the NRC as a result of past licensing actions (amendments, exemptions, relief requests, etc.) or licensing activities (bulletins, generic letters, etc.). Before the audit, the NRC staff searched ADAMS for the licensee's submittals since the last audit and selected a representative sample of regulatory commitments for verification. The identified list of commitments was forwarded to the licensee with a request to locate documentation for the listed regulatory commitments ahead of the NRC staff visit.

The audit excluded the following types of commitments that are internal to licensee processes:

1. Commitments made on the licensee's own initiative among internal organizational components.
2. Commitments that pertain to milestones of licensing actions/activities (e.g.,

respond to an NRC request for additional information by a certain date).

Fulfillment of these commitments was indicated by the fact that the subject licensing action/activity was completed.

3. Commitments made as an internal reminder to take actions to comply with existing regulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports. Fulfillment of these commitments was indicated by the licensee having taken timely action in accordance with the subject requirements.

2.1.2 Audit Results Luminant Generation Company LLC (Luminant, the licensee) has implemented Procedure STA-509, "Commitments Management Program," which identifies the methods and site organization tools for managing development, review, and implementation of station commitments. The licensee's Procedure REG-509, "Nuclear Licensing Commitment Administration," establishes the processes, guidelines, and activities the licensee uses to manage the development, review, and implementation of commitments generated from regulatory obligations and self-imposed requirements. An electronic commitment tracking

- 3 system (ECTS) database is used in conjunction with other information sources to address and track regulatory commitments.

The documents furnished by the licensee during the audit included summary sheets from the ECTS database providing the status of the commitments and appropriate backup documentation, as needed (Le., plant procedures, examination records, and/or other plant documentation). The NRC staff reviewed the documents and summarized the selected commitments information in the attachment to this audit report.

The NRC staff's audit was intended to confirm that the licensee has documented its implementation of its regulatory commitments made to the NRC staff as part of past licensing communications, and the commitments that had not yet been implemented or incorporated in design bases documents are captured in an effective manner for future implementation.

As discussed above, the ECTS and commitments material change evaluation (CMCE) provided by the licensee's Procedures STA-509 and REG-509, provide acceptable tools for the licensee to capture the NRC guidance on commitment management programs. The licensee enters the regulatory commitments made to the NRC into a database. The regulatory commitments are labeled as regulatory commitments. Each commitment is numbered and described by a commitment title and brief description. Status of the commitments, implementation dates, target implementation (documents which finally capture the commitment) document information associated with each specific commitment, and comments are captured in the database. The licensee's staff is well trained in updating the commitment management program.

The NRC staff's audit of the licensee's commitment management program for CPNPP, Units 1 and 2, did not identify any regulatory commitments that were not satisfied or incorporated. The licensee has maintained the ECTS database very well and all the commitments selected for this audit were easily traceable in the database. In case the commitment was already incorporated, the database provided an accurate status of the commitment providing reference to the implementation document.

The review did not identify any errors in the ECTS database. A discrepancy in implementing Commitment No. 3618664, as described below, was identified. However, this was only a procedural discrepancy and did not have any safety significance. The licensee was in the process of writing a condition report to remove the discrepancy.

Commitment No.: 3618664 STA-202, Revision 35 "Station Administration Manual - Nuclear Generation Procedure Change Process," Step 2.8.2, requires that for those cases where the entire procedure satisfies the commitment, the [C] designating the entire procedure to satisfy the commitments, should be placed in the left margin for the PURPOSE section (Section 1.0) and the commitment number identified in the REFERENCES section OR the commitment(s) may be identified by commitment number within a step in the procedure. Procedure STA-698 was developed to satisfy Commitment No. 3618664. The procedure did not label Section 1.0, "PURPOSE" with [C], as required by Procedure STA-202. However, the Commitment No. was added to the Reference section and the sections of the

-4 procedure containing the commitment were labeled with [C] (not the commitment number.

To ensure that the regulatory commitments are not removed/changed in future revisions to the target documents, a database search is performed to identify all the open and closed commitments against the document/procedure being revised and it is ensured that all the closed commitments are captured. In addition, the plant procedures require that all the specific regulatory commitments pertaining to the individual document be included in the reference section. This ensures that the commitments are neither removed nor changed without management approval in accordance with the plant procedures.

As a result of the audit in 2008, the NRC staff identified one area with potential for improvement.

The NRC staff recommended that the area of change in the target document should be marked consistently with the regulatory commitment number to ensure that the commitment is easily traceable and eliminates any potential for it to be changed or deleted. The licensee revised its Procedure STA-202 to incorporate this recommendation. The procedure (step 2.8.2) was revised to state:

[C] denotes the incorporation of a CPNPP commitment (See STA-509).

Procedural steps required to be performed due to a station commitment, identified in the commitment tracking system (e.g. SOERs [Significant Operating Experience Reports], NRC items, etc.), should be specified in the left margin by using a [C] except for those cases where the entire procedure, not a section or step, satisfies the commitment or where the unique formatting method of the procedure does not allow entering a [C] in the left margin or where commitment number is clearly identified.

For those cases where the entire procedure satisfies the commitment, typically identified in the commitment as ALL, the [C] should be placed in the left margin for the PURPOSE section (Section 1.0) and the commitment number identified in the REFERENCES section OR the commitment(s) may be identified by commitment number within a step in the procedure.

Even if the licensee chose not to include the specific commitment number in the area of change in the target document, the commitment number is included in the reference section of the procedure in addition to a permanent marking [C] in the area of change to reflect the area containing the commitment. It ensures that all the regulatory commitments are identified in the target document and can be tracked easily. The NRC staff views this as an improvement of the*

commitment management program Based on the results of the on-site audit, the NRC staff believes that the licensee has implemented the regulatory commitment management program effectively in accordance with UC-105, "Managing Regulatory Commitments Made by Licensees to the NRC," and consistent with NEI 99-04.

The attachment to this audit report contains details of the audit and a summary of the audit results.

-5 2.2 Verification of the Licensee's Program for Managing NRC Commitment Changes The primary focus of this part of the audit is to verify that the licensee has established administrative controls for modifying or deleting commitments made to the NRC. The NRC staff compared the licensee's process for controlling regulatory commitments to the guidelines in NEI 99-04, which the NRC has found to be an acceptable guide for licensees to follow for managing and changing commitments. The process used at CPNPP, Units 1 and 2, is contained in Procedures STA-509 and REG-509. The primary focus of the audit was to ensure that the commitments are implemented without a change and if a change is made, it is in accordance with the approved plant procedures and with the approval of the plant's management. The audit also verified that the licensee's commitment management system includes a mechanism to ensure traceability of commitments following initial implementation.

This ensures that the licensee's personnel are able to recognize that future proposed changes to the affected design features or operating practices require evaluation in accordance with the commitment change control process.

2.2.1 Audit Results Detailed processes are outlined by which the licensee carries out obligations under its regulatory commitments. Any changes to the commitments are processed through the CMCE process. Changes to obligatory commitments are reported to the NRC in accordance with the recommendations of LlC-105. CMCE identifies the affected commitments, their origin, original criteria, proposed changes, and justification for change. The commitment changes are documented in CMCE forms for submittal to the NRC staff.

The licensee performed an ECTS database search and provided a list of commitment changes made since the last audit. The list contained a total of 79 items, identified as commitment changes. The initial NRC staff review indicated that, with the exception of six items, the remaining of the items were the licensee's internal commitments; therefore, the review was limited to the items related to regulatory commitments only. Further, the review indicated that the licensee search tracked corrections to the ECTS database, not resulting from an actual commitment change, also as commitment changes. The rest of the items fell in this category.

Hence, it was concluded that there were no regulatory commitment changes made by the licensee for this audit period. The completion date for Commitment No. 3641550 was revised.

However, the completion date for this commitment was tied to issuance of the safety evaluation (SE) for WCAP-16793 by NRC staff (90 days after issuance of the SE). The NRC staff had not issued the SE for WCAP-16793 as of the date of this letter. Hence, the change did not require CMCE.

Based on the results of the on-site audit, the NRC staff believes that the licensee has implemented regulatory commitment changes appropriately, in accordance with LlC-105 and consistent with NEI 99-04.

3.0 OBSERVATIONS AND RECOMMENDATIONS The ECTS database does not have a field to include the closing date for commitments.

Presently, the licensee is using the field for "Last Update Date" as the date for commitment closure. However, it could potentially be misleading if the ECTS database is revised for any

- 6 other corrections after closing the commitment. The NRC recommended that the ECTS database should include an additional field to clearly state the commitment closing date. The licensee plans to incorporate the recommendation as an enhancement to its commitment management program.

4.0 CONCLUSION

Based on the results of the audit, the NRC staff concludes that the licensee has implemented the regulatory commitment management program effectively, and implemented regulatory commitment changes appropriately, in accordance with LlC-105 and consistent with NEI 99-04.

The specific observations and recommendations identified during the audit are detailed in Section 3.0 of the report.

5.0 LICENSEE PERSONNEL CONTACTED FOR THIS AUDIT Tamera Ervin-Walker and Steve Dixon.

Principal Contributor: Balwant K. Singal Date: September 23, 2011

Attachment:

Regulatory Commitments and Summary of Audit Results

REGULATORY COMMITMENTS AND

SUMMARY

OF AUDIT RESULTS COMANCHE PEAK NUCLEAR POWER PLANT AUDIT PERFORMED FROM AUGUST 16-17, 2011 Letter No. Subject Commitment Description of Commitment Implementation Status No.

TXX-09118, Supplemental 3618664 As a result of the GL 2008-01 evaluation, a new Gas Intrusion Closed.

dated Response to Program is required to be developed. The program will include The Procedure STA-698, "Gas September 21 , NRC Generic as a minimum:

Intrusion Program," was 2009 (ADAMS Letter (GL)

  • Ultrasonic Testing (UT) of selected system and local high developed and the commitment Accession No. 2008-01 points after unit refueling outages to confirm that the was closed on March 31, 2010.

ML092650236) systems are full of water. Screening criteria for the Final Design Authorization process

  • Condition based evaluation process that is initiated upon was revised to address the the occurrence of any event identified as a potential source impact changes in piping for gas intrusion, including UT examinations and continued configurations.

frequency requirements.

Verified training modules for

  • Addition of a Design Impact in the design control program organizations.

for any piping configuration change to ECCS, RHR, or CSS For additional comments on system. procedural discrepancy, please

  • Providing additional training for Operations, Maintenance, refer to the Note on page 9 of and Engineering on gas intrusion potential. this Attachment The program will be developed by October 11, 2009.

Commitment was made under letter TXX-08120. This letter changed the commitment date to March 31, 2010. I Attachment

-2


~

Letter No. Subject Commitment Description of Commitment Implementation Status No.

TXX-08095, Supplement to 27330 In response to the request for information in Part 1 of Closed.

dated Response to GL 2004-02, Comanche Peak Nuclear Power Plant (CPNPP)

This commitment was August28,2008 GL 2004-02 has substantially completed an analysis of the susceptibility of incorporated before issuance of (ADAMS the ECCS and CSS recirculation functions for CPNPP, Units 1 this letter and Engineering Accession No. and 2. The methodology used will conform to the intent of Report ER-ESP-001 has been ML082520253) Nuclear Energy Institute (NEI) 04-07, "Pressurized Water updated. Engineering Report Reactor Sump Performance Evaluation Methodology." The transmitted to NRC via letter analyses, when fully completed, will provide the basis to show TXX-08141, dated November 26, compliance with the applicable regulatory requirements 2008 (ADAMS Accession No.

including Title 10 of the Code of Federal Regulations (10 CFR)

ML083500465).

Section 50.46 and 10 CFR 50, Appendix A, General Design Criteria 35 and 38. The final analysis is scheduled to be completed by August 31, 2008.

27369 The ECCS and CSS recirculation functions under debris Closed.

loading conditions at CPNPP, Units 1 and 2, will be in This commitment was compliance with the regulatory requirements listed in the incorporated before issuance of Applicable Regulatory Requirements section of GL 2004-02 by this letter and Engineering August 31,2008.

Report ER-ESP-001 has been updated. Engineering Report transmitted to NRC via letter TXX-OB141 , dated November 26, 200B (ADAMS Accession No. MLOB3500465).

3582478 Luminant Power will update engineering report ER-ESP-001, Closed.

"Generic Letter 2004-02 Supplemental Response (Luminant Updated report transmitted to Power's Update to the modifications and Maintenance actions NRC via letter TXX-08141 , dated for Resolution of GL 2004-02)" provided in reference 6 [Letter November 26, 2008 (ADAMS TXX-07164, dated December 3,2007) by November 26,2008.

Accession No. ML083500465).

-3 Letter No. Subject Commitment Description of Commitment Implementation Status No. ~~ ~

TXX-08141, Supplement to 3641550 The CPNPP analysis and licensing basis are in accordance Open.

dated Response to GL with WCAP-16793. When the NRC final Safety Evaluation NRC's SE for WCAP-16793 is November 26, 2004-02 (SE) on WCAP-16793 is issued, it will be reviewed for impact still pending. No commitment 2008 (ADAMS and the evaluation of long-term cooling will be revised as material change evaluation Accession No. appropriate. The supplemental response will be revised and (CMCE) was needed since the ML083500465) submitted within 90 days after issuance of the final SE.

completion of the commitment was tied to issuance of the NRC's SE.

NRC letter dated Establish 3740011 Luminant Power commits to monitor for tube slippage as part of Closed.

October 9, 2009 Alternate Repair the steam generator tube inspection program. Slippage Procedures NDE 7.13, "Steam (ADAMS Criteria and monitoring will occur for each inspection of the CPNPP Unit 2 Generator Degradation Accession No. Reporting steam generators. This commitment is required to be Mechanism Assessment," and ML092740076) Requirements completed during each Unit 2 steam generator eddy current NDE 7.10, "Steam Generator for Steam inspection starting in Refueling Outage 2RF12.

Tube Selection and Generator Examination," were revised to Program incorporate this commitment.

3740015 Luminant Power commits to perform a one-time verification of Closed.

tube expansion locations to determine if any significant Luminant performed a one-time deviations exist from the top of the tubesheet to the beginning verification as committed and of expansion transition. If any deviations are found, the concluded that the deviation was condition will be entered into the CPNPP corrective action not significant and did not require program. Additionally, Luminant Power commits to notify the NRC notification. Condition NRC of any significant deviations. This commitment will be Report CR-2009-005402-00 was performed prior to start of Refueling Outage 2RF 11.

reviewed as part of the documentation.

-4 Letter No. Subject Commitment Description of Commitment Implementation Status No. I i

NRC letter dated Establish 3779679 For the condition monitoring (CM) assessment, the component Closed.

October 9, 2009 Alternate Repair of operational leakage from the prior cycle from below the H*

Procedure NDE 7.14, "Steam (ADAMS Criteria and distance will be multiplied by a factor of 3.16 and added to the Generator Tube Integrity Accession No. Reporting total accident leakage from any other source and compared to Assessment" was revised to ML092740076) Requirements the allowable accident-induced leakage limit. For the incorporate the commitment.

(Continued) for Steam operational assessment (OA), the difference in the leakage Generator between the allowed accident-induced leakage and the Program accident-induced leakage from sources other than the (Continued) tubesheet expansion region will be divided by 3.16 and compared to the observed operational leakage. An administrative limit will be established to not exceed the calculated value. This commitment will be implemented prior to entry to Mode 4 from Refueling Outage 2RF11.

NRC Letter Extension of the 3792121 The temporary power diesel generators (TPDGs) provided for Closed.

dated Completion each Unit will be verified available to provide power to Defense in Depth Contingency October 29, Times for the equipment for long-term cooling once per shift during the Plan (DIDCP) XST2-01 was 2010 (ADAMS Offsite Circuits 14-day Completion Time.

developed to incorporate this Accession No. on One-Time commitment.

ML102810130) Basis 3792145 During the one-time, 14-day Completion Time for XST2, one Closed.

set of TPDGs will be provided for each Unit.

DIDCP XST2-01 was developed to incorporate this commitment.

3792165 All four emergency diesel generators (EDGs) and both turbine- Closed.

driven auxiliary feed water pumps (TDAFWPs) will be verified DIDCP XST2-01 was developed OPERABLE within the 2-week period prior to the start of the to incorporate this commitment.

one-time, 14-day Completion Time.

3792166 All routine or elective testing and maintenance activities Closed.

affecting the switchyards and relay houses (with the exception DIDCP XST2-01 was developed of operator rounds), EDGs, TDAFWPs, station service water to incorporate this commitment.

(SSW) pumps, XST1 and work activities along the route associated with power and control cabling for XST1 will be suspended for the duration of the one-time, 14-day Completion Time.

-5 Letter No. Subject Commitment Description of Commitment Implementation Status No.

NRC Letter Extension of the 3792168 Roving hourly fire watches along the route associated with Closed.

dated Completion power and control cabling for the in-service startup transformer, DIDCP XST2-01 was developed October 29, Times for the XST1, will be established for the duration of the one-time, 14 to incorporate this commitment.

2010 (ADAMS Offsite Circuits day Completion Time.

Accession No. on One-Time 3792169 Plant modification activities requiring the use of the one-time, Closed.

ML102810130) Basis 14-day Completion Time will be planned so as to minimize the (Continued) (Continued) DIDCP XST2-01 was developed probability of severe weather or grid stress. Administrative to incorporate this commitment.

controls in place within 120 days of NRC approval.

3792197 Local weather conditions and forecasts will be monitored by Closed.

Operations twice per shift to assess potential impacts on plant DIDCP XST2-01 was developed conditions during the 14-day Completion Time.

to incorporate this commitment.

3792171 A walkdown will be completed prior to entering the 14-day Closed.

Completion Time to identify any issues that could adversely DIDCP XST2-01 was developed affect the availability of the EDGs or TDAFWPs during a to incorporate this commitment.

seismic event.

3792177 Access to the switch yards, the relay houses, the EDGs, the Closed.

TDAFWPs, the SSW Pumps and XST1, will be posted and DIDCP XST2-01 was developed controlled prior to the implementation of the 14-day Completion to incorporate this commitment.

Time. .

3792178 CPNPP's Operations Department will contact the Transmission Closed.

Operator (Transmission Grid Controller) once per day during DIDCP XST2-01 was developed the 14-day Completion Time to ensure no problems exist in the to incorporate this commitment.

transmission lines feeding CPNPP or their associated switchyards that would cause post trip switch yard voltages to exceed TS limits.

-6 Letter No. Subject Commitment Description of Commitment Implementation Status No.

NRC Letter Extension of the 3792184 Just-in-time training for affected work groups will be completed Closed.

dated Completion prior to the start of the XST2 outage, prior to implementation of DIDCP XST2-01 was developed October 29, Times for the the 14-day Completion Time.

to incorporate this commitment.

2010 (ADAMS Offsite Circuits Accession No. on One-Time Also, Procedure L044.ECAXG1 ML102810130) Basis for Loss of All AC [alternating (Continued) (Continued) current] Power was developed as a result of this commitment.

Reviewed the training records for maintenance and operations personnel for completion of the training before implementing the modification.

3792190 Operating and maintenance procedures will be developed and Closed.

issued for using XST2A as an alternate startup transformer for DIDCP XST2-01 was developed XST2, prior to implementation of the 14-day Completion Time.

to incorporate this commitment.

Also, Procedures ABN-601 for Response to a 138/345 kilovolt (KV) System Malfunction, SOP-602 for 138 KV and 345 KV Transformers and Switchyard Air Switches, MSE-PX-0764 for XST2 and XST2A Startup Transformer Phase Rotation Check, MSE-G0-6001 for Main Generator, Isophase Bus and Power Transformer Link and Support Activities, and MSE-PX-0765 for Interchanging Startup Transformers XST2 and XST2A were developed to implement the modification and to comply with this commitment.

-7 letter No. Subject Commitment Description of Commitment tmplementation Status No.

NRC Letter Extension of the 3932461 Procedures will be revised to facilitate the TPDGs to power the Closed.

dated Completion loads necessary for safe shutdown and long-term cooling of the Procedures ECA-O.OA and October 29, Times for the Unit, that has lost all onsite and offsite power, prior to the one-ECA-O.OB for Loss of All AC 2010 (ADAMS Offsite Circuits time, 14-day TS Completion Time for Startup Transformer Power, ECA-TP-11-001 A and Accession No. on One-Time XST2 by March 1, 2011.

ECP-TP-11-001B for Loss of all ML102810130) Basis AC Power Recovery without SI (Continued) (Continued)

Required and APG Supplying Power, SOP-614A and SOP-614B for Alternate Power Generator Operation, and ABN-601 for Response to a 138/345 KV Malfunction were generated to implementing the modification and to comply with the commitment TXX-08008, Revise Rated 3435228 The requested information corresponding to a better estimate Closed.

dated Thermal Power type analysis (e.g., with nominal initial conditions, is scheduled By letter TXX-08014, dated January 10, from 3458 MWt to be provided in a separate letter by February 29,2008).

February 28, 2008 (ADAMS 2008 (ADAMS to 3612 MWt Accession No. ML080660070),

Accession No. (Stretch Power Luminant provided the revised ML080160118) Uprate) analysis of the loss of external electricalload/turbine trip event.

3435242 The Unit 2 high-energy line break temperature evaluation is Closed.

expected to-be completed by April 15, 2008.

Stone and Webster, Inc.

completed the Main Steam and Feedwater Penetration Area Environmental Analysis by letter dated March 31, 2008.

-8 Letter No. Subject Commitment Description of Commitment Implementation Status No.

TXX-09046, Adoption of 3696981 Removal of the plant-specific TS requirements will be Closed.

dated April 1, Technical performed concurrently with the implementation of the The TS changes were 2009 (ADAMS Specification 10 CFR 26, Subpart I requirements and commitment will be incorporated in TS Amendment Accession No. Task Force completed no later than October 1, 2009.

No. 148, issued on October 1, ML090910744) (TSTF) Change 2009.

Traveler TSTF-511, Revision 0 1---...

TXX-09130, Update of 3495809 Environmental Qualification (EQ) packages will subsequently Open.

dated Commitment be updated to reflect completed evaluations using the revised The EQ packages have been October 22, Regarding pressure and temperature profiles prior to startup from the updated and are currently being 2009 (ADAMS Equipment current refueling outage (Unit 2 only, Unit 1 already completed) reviewed. There was no specific Accession No. Qualification date for completing the ML093020119) Bounding Post commitment.

Loss-of Coolant Accident Profiles c*** ..._...

TXX-11021, Order for 3977962 Achieve full compliance with the provisions of Attachments 1 Closed.

dated Implementation and 2 of the NRC issued "Order for Implementation of By letter TXX-11 076, dated February 25, of Additional Additional Security Measures and Fingerprinting for Unescorted June 13, 2011 (ADAMS 2011 (ADAMS Security Access to Comanche Peak Steam Electric Station Independent Accession No. ML11173A132),

Accession No. Measures Spent Fuel Storage Installation" (EA-2010-051 , dated June 9, Luminant informed NRC that ML110660481) 2010) by June 21,2011.

Luminant is in full compliance with the requirements of Order EA-201 0-051.

- 9 letter No. Subject Commitment Description of Commitment Implementation Status No.


~~~~-

TXX-10097, License 3834209 Implement all cyber-security-related modifications (outage and Open.

dated June 15, Amendment non-outage) and enter the maintenance phase of the NRC The NRC staff approved the 2010 (ADAMS Request 10-002, approved Cyber Security Program (CSP).

Cyber Security Plan for CPNPP Accession No. for Approval of Note: on July 26, 2011. The NRC staff ML102030124) the CPNPP did not regard the CSP milestone Cyber Security The commitment completion date is as specified in the letter implementation dates as Plan dated June 15, 2010. Luminant also made additional regulatory commitments that can commitments in Enclosure 2, "CPNPP Cyber Security Plan be changed unilaterally by the Proposed Implementation Schedule," in its letter dated licensee. The NRC staff June 15, 2010, and the completion dates are listed against indicated that all subsequent each commitment. The completion dates for these changes to the NRC-approved commitments being security-related information, are not CSP implementation schedule included here.

will require prior NRC approval pursuant to 10 CFR 50.90.

Hence, these commitments do not need any more tracking.

Based on the NRC staffs decision, the licensee is in the process of closing these

~~~L.... ~~ .._ ..~~

commitments.

Note (Applicable to Commitment No. 3618664):

STA-202, Step 2.8.2, requires that for those cases where the entire procedure satisfies the commitment, the [C] designating the entire procedure to satisfy the commitments, should be placed in the left margin for the PURPOSE section (Section 1.0) and the commitment number identified in the REFERENCES section OR the commitment(s} may be identified by commitment number within a step in the procedure. Procedure STA-698 was developed to satisfy this commitment (Commitment No. 3618664). The procedure did not label Section 1.0, "PURPOSE" with [C], as required by Procedure STA-202. However, the Commitment No. was added to the Reference section and the sections of the procedure containing the commitment were labeled with [C] (not the commitment number. The licensee was in the process of creating a condition report to remove the discrepancy.

R. Flores -2 The NRC staff appreciates the resources that were made available by your staff, both before and during the audit. If there are any questions, I can be contacted at (301) 415-3016.

Sincerely, tRAJ Balwant K. Singal, Senior Project Manager Plant licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446

Enclosure:

Audit Report cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMComanchePeak Resource LPLIV rtf RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource SMeighan, TAJDORL RidsNrrLAJBurkhardt Resource ADAMS Accession No.: ML112440514 OFFICE NRRtLPL4/PM NRRtLPL4tLA NRRtLPL4tBC NRRtLPL4tPM NAME BSingal JBurkhardt MMarkley BSingal DATE 9/16/11 9/16/11 9/23/11 9/23/11 OFFICIAL RECORD COpy