Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24024A210 | 29 January 2024 | Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | |
ML23172A147 | 9 August 2023 | Breakout Questions - Aging Management Audit - Comanche Peak Units 1 and 2 - License Renewal Application | Hot Short Safe Shutdown Boric Acid Fire Barrier Coatings Nondestructive Examination Incorporated by reference Aging Management Moisture barrier License Renewal Subsequent License Renewal Maintenance Rule Program Biofouling Pressure boundary leak Through-Wall Leak Fire Protection Program Dissimilar Metal Weld Stretch Power Uprate |
ML23172A146 | 9 August 2023 | Aging Management Audit Report - Comanche Peak Units 1 and 2 - License Renewal Application | Safe Shutdown Boric Acid Fire Barrier Anticipated operational occurrence Weld Overlay Hydrostatic Coatings Nondestructive Examination Aging Management Pressure and Temperature Limits Report Moisture barrier License Renewal Subsequent License Renewal Control of Heavy Loads Through-Wall Leak Through Wall Leak Fire Protection Program Dissimilar Metal Weld DM weld Flow Induced Vibration Power Uprate Stretch Power Uprate |
ML22152A041 | 10 June 2022 | Summary of Regulatory Audit License Amendment Request to Revise TS to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b | High winds Internal Flooding Probabilistic Risk Assessment Open Phase Condition |
ML16131A582 | 9 June 2016 | NRC Report for the Audit of Luminant Generation Company, Llc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Comanche Peak Nuclear Power Plant, Units 1 and 2 | Fukushima Dai-Ichi |
ML15180A261 | 5 August 2015 | Report for the Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 | Safe Shutdown Boric Acid Shutdown Margin Tornado Missile Safe Shutdown Earthquake FLEX Tornado Generated Missile Spent Fuel Pool Instrumentation |
ML14213A033 | 2 September 2014 | Audit of the Licensee'S Management of Regulatory Commitments, Audit Performed July 15-17, 2014 | Boric Acid Nondestructive Examination Cyber Security Offsite Circuit Hourly Fire Watch Seismic Walkdown Report |
ML13225A575 | 19 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Frazil ice Battery sizing Earthquake |
ML13296A543 | 22 November 2013 | Audit Report for 7/9-11/2013 Audit Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Fukushima Dai-Ichi Earthquake Scaffolding |
ML112440514 | 23 September 2011 | Audit of the Licensee'S Management of Regulatory Commitments, Audit Performed August 16-17, 2011 | Safe Shutdown Cyber Security Offsite Circuit |
ML081970666 | 31 July 2008 | Audit of the Licensee'S Regulatory Commitment Management Program, Audit Performed 6/9/2008 to 6/11/2008 | Weld Overlay |
ML043420308 | 16 December 2004 | Regulatory Commitments Management Program Audit Report | Boric Acid Ultimate heat sink Through-Wall Leakage |