ML11165A105
| ML11165A105 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 06/06/2011 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML11165A105 (3) | |
Text
1 WBN2Public Resource From:
Poole, Justin Sent:
Monday, June 06, 2011 9:12 AM To:
Crouch, William D Cc:
WBN2HearingFile Resource Attachments:
WBN2 GALE LWR INPUT 7c.docx
- Bill, See the staffs request below. I will explain more on todays bucket list call.
JustinC.Poole ProjectManager NRR/DORL/LPWB U.S.NuclearRegulatoryCommission (301)4152048 email:Justin.Poole@nrc.gov
I need you to set up a conference call with TVA's subject matter experts to discuss their response my questions about the source term listed in FSAR Table 11.3-7(c). See their response number 16 in the Feb.
25, 2011 submittal. In addition, since TVA is now using this as the effluent design basis, I need to validate this revised effluent gaseous waste source term. Attached is a listing of the parameters the staff needs to run the GALE code to verify this new/revised source term. Please forward this list to TVA so that they can describe where the appropriate values for each of these parameters is found in the FSAR.
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
379 Mail Envelope Properties (19D990B45D535548840D1118C451C74D886EB31E21)
Subject:
Sent Date:
6/6/2011 9:12:06 AM Received Date:
6/6/2011 9:12:07 AM From:
Poole, Justin Created By:
Justin.Poole@nrc.gov Recipients:
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 887 6/6/2011 9:12:07 AM WBN2 GALE LWR INPUT 7c.docx 20058 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
WATTS BAR UNIT 2 GALE INPUT CARD 1 NAME NAME OF REACTOR WATTS BAR 2 TYPE = PWR CARD 2 POWTH THERMAL POWER LEVEL (MEGAWATTS) ____.
CARD 3 PCVOL MASS OF PRIMARY COOLANT (THOUSAND LBS) ____.
CARD 4 LETDWN PRIMARY SYSTEM LETDOWN RATE (GPM) ____.
CARD 5 CBFLR LETDOWN CATION DEMINERALIZER FLOW (GPM) ____.
CARD 6 NOGEN NUMBER OF STEAM GENERATORS ____.
CARD 7 TOSTFL TOTAL STEAM FLOW (MILLION LBS/HR) ____
CARD 8 WLI MASS OF LIQUID IN EACH STEAM GENERATOR (THOUSAND LBS) ____.
CARD 9 BLWDWN BLOWDOWN-THOUS LB/HR ____BLOWDOWN TREATMENT-INPUT __
CARD 10 REGENT CONDENSATE DEMINERALIZER REGENERATION TIME (DAYS) __
CARD 11 FFCDM CONDENSATE DEMINERALIZER FLOW FRACTION ____
CARD 12 SHIM BLEED RATE ____ GPD CARD 13 DFI= ____DFCS= ____DFO = ____
CARD 14 COLLECTION ____DAYS PROCESS ____DAYS FRACT DISCH ____
CARD 15 EQUIPMENT DRAINS INPUT ____ GPD AT ____ PCA CARD 16 DFI= ____DFCS= ____DFO = ____
CARD 17 COLLECTION ____DAYS PROCESS ____ DAYS FRACT DISCH ____.
CARD 18 CLEAN WASTE INPUT ____ GPD AT ____ PCA CARD 19 DFI= ____DFCS= ____DFO = ____
CARD 20 COLLECTION ___DAYS PROCESS ___DAYS FRACT DISCH ____
CARD 21 DIRTY WASTES ____ GPD AT ____PCA CARD 22 DFI= ____DFCS= ____DFO = ____
CARD 23 COLLECTION ____DAYS PROCESS ____DAYS FRACT DISCH ____
CARD 24 BLOWDOWN FRACTION PROCESSED 1.
CARD 25 DFI= ____DFCS= 1.00E02DFO = 1.00E03 CARD 26 COLLECTION ____DAYS PROCESS ____DAYS FRACT DISCH ____
CARD 27 REGENERANT FLOW RATE (GPD) ____
CARD 28 DFI= ____DFCS= ____DFO = ____
CARD 29 COLLECTION ____DAYS PROCESS ____DAYS FRACT DISCH ____
CARD 30 IS THERE CONTINUOUS STRIPPING OF FULL LETDOWN FLOW! ____
CARD 31 TAU1 HOLDUP TIME FOR XENON (DAYS) ____
CARD 32 TAU2 HOLDUP TIME FOR KRYPTON (DAYS) ____
CARD 33 TAU3 FILL TIME OF DECAY TANKS FOR THE GAS STRIPPER (DAYS) ____
CARD 34 GAS WASTE SYSTEM HEPA! ____
CARD 35 FUEL HANDLG BLDG CHARCOAL! ____ HEPA! ____
CARD 36 AUXILIARY BLDG CHARCOAL! ____HEPA! ____
CARD 37 CONVOL CONTAINMENT VOLUME (MILLION FT3) ____
CARD 38 CNTMT ATM. CLEANUP CHARCOAL! __ HEPA! __ RATE(1000CFM) ____
CARD 39 CNTMT-HIGH VOL PURGE CHARCOAL! __ HEPA! __ NUMBER/YEAR __
CARD 40 CNTMT LOW VOL PURGE CHARCOAL! __ HEPA! __ RATE (CFM) ____
CARD 41 FVN FRACTION IODINE RELEASED FROM BLOWDOWN TANK VENT ___
CARD 42 FEJ PERCENT OF IODINE REMOVED FROM AIR EJECTOR RELEASE ___
CARD 43 PFLAUN DETERGENT WASTE PF 1.