OL - Bucket List 5/19/11
ML11165A146
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/18/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11165A146 (9)


Text

WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]

Sent: Wednesday, May 18, 2011 2:35 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Adair, James G; Arent, Gordon; Beach, Charles D; Bryan, Robert H Jr; Detchemendy, Thomas F; Elliott, Walter L Jr; Elton, Thomas L; Freeman, Edwin E; Glover, Christopher Edmund; Helms, Douglas F; Hemmer, Gerald L Jr; Henrich, Nolan T Jr; Hilmes, Steven A; Johnson, Robert M; Jones, Dennis Michael; Knuettel, Edward Terry; Koontz, Frank A Jr; Metzler, Ernest Thomas; Miller, Lee R; Olson, Peter Edwin; Riedl, Christopher John; Schlessel, Jerry V; Shea, Joe; Smith, James D; Snyder, Laura L; Spink, Thomas E; Stephenson, Catherine L; Stinson, Kelly David Jr; Stockton, Rickey A; Tinley, Mary Darlene; Woods, Steven E

Subject:

Bucket List 5/19/11 Attachments: NRC PM Open Items List 5-19-11.docx William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 387 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F08499DE1)

Subject:

Bucket List 5/19/11 Sent Date: 5/18/2011 2:35:28 PM Received Date: 5/18/2011 2:35:57 PM From: Crouch, William D Created By: wdcrouch@tva.gov Recipients:

"Adair, James G" <jgadair0@tva.gov>

Tracking Status: None "Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Beach, Charles D" <cdbeach@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Detchemendy, Thomas F" <tfdetchemendy@tva.gov>

Tracking Status: None "Elliott, Walter L Jr" <wlelliot@tva.gov>

Tracking Status: None "Elton, Thomas L" <tlelton@tva.gov>

Tracking Status: None "Freeman, Edwin E" <eefreeman@tva.gov>

Tracking Status: None "Glover, Christopher Edmund" <ceglove0@tva.gov>

Tracking Status: None "Helms, Douglas F" <dfhelms@tva.gov>

Tracking Status: None "Hemmer, Gerald L Jr" <glhemmer@tva.gov>

Tracking Status: None "Henrich, Nolan T Jr" <nthenrich@tva.gov>

Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>

Tracking Status: None "Johnson, Robert M" <rmjohnson1@tva.gov>

Tracking Status: None "Jones, Dennis Michael" <dmjones0@tva.gov>

Tracking Status: None "Knuettel, Edward Terry" <etknuettel@tva.gov>

Tracking Status: None "Koontz, Frank A Jr" <fakoontz@tva.gov>

Tracking Status: None "Metzler, Ernest Thomas" <etmetzler@tva.gov>

Tracking Status: None "Miller, Lee R" <lrmiller@tva.gov>

Tracking Status: None "Olson, Peter Edwin" <peolson@tva.gov>

Tracking Status: None "Riedl, Christopher John" <cjriedl@tva.gov>

Tracking Status: None "Schlessel, Jerry V" <jvschlessel@tva.gov>

Tracking Status: None "Shea, Joe" <jwshea@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Snyder, Laura L" <llsnyder@tva.gov>

Tracking Status: None "Spink, Thomas E" <tespink@tva.gov>

Tracking Status: None "Stephenson, Catherine L" <clstephenson@tva.gov>

Tracking Status: None "Stinson, Kelly David Jr" <kdstinson@tva.gov>

Tracking Status: None "Stockton, Rickey A" <rastockton@tva.gov>

Tracking Status: None "Tinley, Mary Darlene" <mdtinley@tva.gov>

Tracking Status: None "Woods, Steven E" <sewoods@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 86 5/18/2011 2:35:57 PM NRC PM Open Items List 5-19-11.docx 34812 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 6 NRC PM Open Items List 5/19/11 (423) 751-6338 ID 657601 No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and Assess Update Cyber Security Plan IAW NEI 08-09 Rev 6 per Heinrich/Snyder Implementation CDAs/Identify NRC letter dated 5/24/10. NRC Inspection in 2011 (Bryan)

Mods 2/28/11A Provide update to change commitment for April ready for Inspection RAI Response 4/7/11A Response to 3 Generic RAIs Plan for Common Systems Identify Required Exemptions Scope Mods 5/31/11 TI issued 5/30/11 NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Inspection Dec 2011

Page 2 of 6 No. Description Status Additional Comments Resp Org/Person

2. Instrumentation RAI List (Knuettel) Ongoing RAI Responses Eng/Hilmes (Smith) 5/27/11 Provide proprietary Westinghouse presentation 6/8/11 Provide requested WINCISE Proprietary Documents 6/17/11 Provide non-prop versions 5/20/11 NRC review draft RAIs for deletions
3. Resolve Licensing Basis Preservation 5/27/11 TVA to provide QA audit results Eng/Freeman Self Assessment PERs (Crouch) (Smith)
4. Status of GSI 199 Eastern Seismicity 6/12/11 TVA/NRR (Crouch)
5. Complete Implementation (Hemmer) RAI Response Respond to RAI Hemmer 3/29/11A (Smith)

Implement two unit commitments.

RAI Clarification Provide updated information for tables contained in for Fuel the 6/29/07 and 7/1/10 letters.

Question 2 5/9/10A Letter did not address Phase I commitments Diesel 6/1/11 Pump Relocation 6/17/11 Procedures Issued 6/30/11 Inspection -

August 2011

Page 3 of 6 No. Description Status Additional Comments Resp Org/Person Phase I commitments 2/11/11

6. Provide feedback on the status of NRC SSER 23 NRC to provide status of review in SSER 23 NRR review of Integrated Safeguards Test submittal
7. Document Control Issues for two letters 6/15/11 7/15, 10/5, 10/21 and 10/29 letters. NRC to reprint Licensing/Boyd 7/15 letter and provide to NRC Document control.

TVA/Bechtel to provide non-proprietary version of documents that can be released to the public. TVA to provide revised letter that says non-prop once prop documents removed. NRC action to contact Kenny Nguyen, NRC Document Control regarding A102.

8. Chapter 15.5 RAIs 12/10/10A Additional question regarding meteorology data from Wastrack RAI response 2008-2009 (Bryan) 6/5/11
9. Fire Protection Report Questions 3/31/11A Justification Criteria ENG/Hilmes regarding OMA Set 3 Set 3 RAIs (Crouch) 5/6/11A FPR Rev FPR 5/18/11 Justifications Justifications

???

5/27/11 Set 4A RAIs 6/7/11 Set 4B Set 5

??? Set 5 RAIs

10. IST Tech Spec Change 5/27/11 TVA Corporate Licensing (Smith)
11. Environmental Phone call to discuss 4/28/11A Responded to RAI and attached revised Impingement Environmental/

intake flow rate/velocity at IPS and Report Hopping SCCW in EIS versus NPDES. (Bryan)

12. Tech Spec Revisions from latest T/S 5/10/11A Meeting Licensing/Elton

Page 4 of 6 No. Description Status Additional Comments Resp Org/Person markup and NRC Review comments (Bryan) 5/24/11 Submittal

13. ASME III to XI transition Need NRC When does ISI program begin with partial plant N-3? Eng/Helms Letter Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation.
14. Chapter 15 RAI on Dose calc basis 5/24/11 Bechtel (Fredrick) preparing answer. Eng/Koontz (Bryan)
15. Chapter 11/12 RAIs 5/11/11A Public Meeting 5/11/11 Chem/Woods (Bryan) 5/20/11 Chapter 11 Letter 5/20/11 EIS Letter 5/27/11 X/Q info in FSAR 5/20/11 Chapter 11 RAI List 5/20/11 X/Q to 50 miles
16. Hydrology sand bag question 4/20/11A Five RAI questions Corp/Selman 5/11/11A NRC Visit to Knoxville/TVA dam 5/20/11 NRC Info Request
17. Letter to notify NRC when Vital Area 5/31/11 Date for schedule Lic/Crouch Boundary returned to original location
18. Part 70 License 6/10/11 NRC to issue Part 70 license. Milano NRC question related to dry versus wet storage.

4/29/11 TVA issued letter regarding placement of new Unit 2 fuel in new fuel vault and SFP.

19. ACRS Topics Improvements, Inspection status, Refurb status, Construction Status, Japan, IST Re-Presentation, Cyber Security
20. SAMDA RAIs 05/11/11A Meeting on 5/11/11

Page 5 of 6 No. Description Status Additional Comments Resp Org/Person 05/13/11A 1st Submittal 5/27/11 2nd Submittal

21. SSER 22/23 Open Items Response 5/27/11 Addresses 15 Open Items
22. Chapter 12 RAI on Instrument Channel 6/24/11 ENG/Hilmes Operability Tests
23. Transient Analysis issues ENG/Koontz Overpressurization 4/1/11A WEC/Morgan Boron Info 3/25/11A Inadvertent SI 4/29/11A CVCS Malfunction 4/29/11A 5/13/11A Steam line break Proprietary review of audit report 4/22/11A Audit Report Response 5/13/11A Audit Report Follow up Questions 5/26/11
24. Sump Strainer Loads RAI 4/28/11A Eng/Helms (Bryan)
25. Sump Strainer Flow RAI 4/28/11A Eng/Helms (Bryan)
26. NRR/Region assign SSER 22 items 1, 4, 5/17/11 1 pm telecon if required Milano 7, 9, 11, 19, 21, 38
27. FSAR A104 5/27/11 Lic/Stockton
28. IEB 88-02 SG Tube Cracking TBD What are the SG inspection plans in light of the Corp SG/

experience with a French reactor exhibiting SG tube Webber cracking early? Is TVA planning to change the ISI/Tinley inspection plan due to this operating experience?

29. Develop list of planned License 9/1/11 Review Unit 1 SER for exemptions. NRR/TVA Conditions, Exemptions and Relief (Bryan)

Requests (Crouch)

Page 6 of 6 No. Description Status Additional Comments Resp Org/Person

30. Submit final REP prior to fuel load Complete NRR to determine if submittal has to occur before EP/

(Spink) Item 1 License rather than before fuel load. Detchemendy (Bryan) 10/1/11 1. Fix Section 6.0, Event 6.2 in Rev 92xx.

Item 2

2. Submit Final REP and EPIPs 180 days prior to OL.
31. Issue two Unit Offsite Dose Calculation 9/1/11 Chemistry/

Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)

32. Copy of Site Plan for NSR TBD Fire Ops/Sterchi (Smith)
33. Issue Unit 2 Completion Letter (Crouch) 3/1/12 Licensing (Crouch)
34. Combined U1/U2 FSAR (Stockton) 3/1/12 Licensing (Crouch)
35. Submit final as-constructed FSAR 10/1/11 Licensing/

figures Stockton (Crouch)

36. Verify Tech Spec Setpoints match calcs 8/1/11 Eng/Hilmes (Bryan)
37. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch)
38. Discuss IPS velocity calc at 5/11 mtg 5/11/11A Discussed at meeting Lic (Bryan) 5/20/11 Provide submittal to describe intake configuration
39. Provide date of Unit 1 PASS T/S 5/3/11A Provide NRC SER to NRR via e-mail Licensing/

submittal and NRC SER date Stockton (Crouch)

40. Provide feedback on need to revise 5/4/11A See e-mail from Crouch dated 5/2/11. Milano submittal regarding testing of non-EQ hand switches. NRR reviewed determined no need to revise submittal or NRC July 2 letter.