May 19, 2011

Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT: ERRATA FOR D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC TEMPORARY INSTRUCTION 2515/183 INSPECTION REPORT 05000315/2011011; 05000316/2011011

Dear Mr. Weber:

On May 13, 2011, the U. S. Nuclear Regulatory Commission (NRC) issued Temporary Instruction (TI) 2515/183 Inspection Report 05000315/2011011; 05000316/2011011 (ML111320302). Section 03.04.a was inadvertently duplicated as Section 03.03.b in the Inspection Results. Please be advised that there is no Section 03.03.b. Section 03.04.a is correct as stated. We apologize for any inconvenience to you and your staff.

Sincerely,/RA by Julio Lara for/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ May 19, 2011 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT: ERRATA FOR D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC TEMPORARY INSTRUCTION 2515/183 INSPECTION REPORT 05000315/2011011; 05000316/2011011

Dear Mr. Weber:

On May 13, 2011, the U. S. Nuclear Regulatory Commission (NRC) issued Temporary Instruction (TI) 2515/183 Inspection Report 05000315/2011011; 05000316/2011011 (ML111320302). Section 03.04.a was inadvertently duplicated as Section 03.03.b in the Inspection Results. Please be advised that there is no section 03.03.b. Section 03.04.a is correct as stated. We apologize for any inconvenience to you and your staff.

Sincerely,/RA by Julio Lara for/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\TI Reports\Cook 2011 011 Errata.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy See Previous Concurence OFFICE RIII RIII NAME TBriley:drp JCameron*JLara for DATE 5/19/2011 5/19/2011 OFFICIAL RECORD COPY Letter to from J. Cameron dated May 19, 2011.

SUBJECT: ERRATA FOR D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC TEMPORARY INSTRUCTION 2515/183 INSPECTION REPORT 05000315/2011011; 05000316/2011011 DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource