ML11116A197

From kanterella
Jump to navigation Jump to search
PSEG Nuclear LLC, Docket 50-394, Hope Creek Generating Station Renewed Facility Operating License
ML11116A197
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/20/2011
From: Leeds E
License Renewal Projects Branch 1
To: Joyce T
Public Service Enterprise Group
Cunanan, A D, NRR/DLR, 415-3897
References
Download: ML11116A197 (16)


Text

PSEG NUCLEAR LLC DOCKET 50-354 HOPE CREEK GENERATING STATION RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-57

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A. The application for a renewed license filed by the PSEG Nuclear LLC (the licensee), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Hope Creek Generating Station (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-120 and the application, as amended, the provisions of the Act and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D below);

D. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D below);

E. PSEG Nuclear LLC is technically qualified to engage in the activities authorized by this renewed license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; F. The licensee has satisfied the applicable provisions of 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements, of the Commissions regulations; G. The issuance of this renewed license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Renewed Facility Operating License No. NPF-57, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied; Renewed License No. NPF-57

I. The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this renewed license will be in accordance with the Commissions regulations in 10 CFR Parts 30, 40 and 70; J. The receipt, production, possession, transfer, and use of Cobalt-60 as authorized by this renewed license will be in accordance with the Commissions regulations in 10 CFR Part 30; and K. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1), and (2) time-limited aging analyses that require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, Definitions, for the facility, and that any changes made to the facilitys current licensing basis to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations.

2. Based on the foregoing findings and approval by the Nuclear Regulatory Commission at a meeting on July 21, 1986, the License for Fuel Loading and Low-Power Testing, License No. NPF-50, issued on April 11, 1986, is superseded by Renewed Facility Operating License No. NPF-57 hereby issued to PSEG Nuclear LLC (the licensee), to read as follows:

A. This renewed license applies to the Hope Creek Generating Station, a boiling water nuclear reactor, and associated equipment (the facility) owned by PSEG Nuclear LLC. The facility is located on the licensees site on the east bank of the Delaware River in Lower Alloways Creek Township, Salem County, New Jersey.

The facility is located approximately eight miles southwest of Salem, New Jersey and is described in the PSEG Nuclear LLC Final Safety Analysis Report, as supplemented and amended, and in the Environmental Report, as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1) PSEG Nuclear LLC, pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the above designated location in Salem County, New Jersey, in accordance with the procedures and limitations set forth in this renewed license; (2) Deleted (3) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for Renewed License No. NPF-57

reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation.

(7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 188, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Renewed License No. NPF-57

(3) Inservice Testing of Pumps and Valves (Section 3.9.6, SSER No. 4)*

This License Condition was satisfied as documented in the letter from W. R. Butler (NRC) to C. A. McNeill, Jr. (PSE&G) dated December 7, 1987. Accordingly, this condition has been deleted.

(4) Inservice Inspection (Section 6.6, SER; Sections 5.2.4.3 and 6.6.3, SSER No. 5)

a. PSE&G shall submit an inservice inspection program in accordance with 10 CFR 50.55a(g)(4) for staff review by October 11, 1986.
b. Pursuant to 10 CFR 50.55a(a)(3) and for the reasons set forth in Sections 5.2.4.3 and 6.6.3 of SSER No. 5, the relief identified in the PSE&G submittal dated November 18, 1985, as revised by the submittal dated January 20, 1986, requesting relief from certain requirements of 10 CFR 50.55a(g) for the preservice inspection program, is granted.

(5) Solid State Logic Modules PSEG Nuclear LLC shall continue, for the life of the plant, a reliability program to monitor the performance of the Bailey 862 SSLMs installed at Hope Creek Generating Station. This program should obtain reliability data, failure characteristics, and root cause of failure of both safety-related and non-safety-related Bailey 862 SSLMs. The results of the reliability program shall be maintained on-site and made available to the NRC upon request.

(6) Fuel Storage and Handling (Section 9.1, SSER No. 5)

a. No more than a total of three (3) fuel assemblies shall be out of approved shipping containers, NRC-approved dry spent fuel storage systems, fuel assembly storage racks or the reactor at any one time.
b. The above three (3) fuel assemblies as a group shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array and the storage rack array.
c. Fresh Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three (3) containers high.

The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Renewed License No. NPF-57

(7) Fire Protection (Section 9.5.1.8, SSER No. 5; Section 9.5.1, SSER No. 6)

PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility through Amendment No. 15 and as described in its submittal dated May 13, 1986, and as approved in the SER dated October 1984 (and Supplements 1 through 6) subject to the following provision:

PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(8) Solid Waste Process Control Program (Section 11.4.2, SER; Section 11.4, SSER No. 4)

PSEG Nuclear shall obtain NRC approval of the Class B and C solid waste process control program prior to processing Class B and C solid wastes.

(9) Emergency Planning (Section 13.3, SSER No. 5)

In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agencys final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR 50.54(s)(2) will apply.

(10) Initial Startup Test Program (Section 14, SSER No. 5)

Any changes to the Initial Startup Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

(11) Partial Feedwater Heating (Section 15.1, SER; Section 15.1, SSER No. 5; Section 15.1, SSER No. 6)

The facility shall not be operated with reduced feedwater temperature for the purpose of extending the normal fuel cycle unless analyses supporting such operation are submitted by the licensee and approved by the staff.

(12) Detailed Control Room Design Review (Section 18.1, SSER No. 5)

Renewed License No. NPF-57

a. PSE&G shall submit for staff review Detailed Control Room Design Review Summary Reports II and III on a schedule consistent with, and with contents as specified in, its letter of January 9, 1986.
b. Prior to exceeding five percent power, PSE&G shall provide temporary zone markings on safety-related instruments in the control room.

(13) Safety Parameter Display System (Section 18.2, SSER No. 5)

Prior to the earlier of 90 days after restart from the first refueling outage or July 12, 1988, PSE&G shall add the following parameters to the SPDS and have them operational:

a. Primary containment radiation
b. Primary containment isolation status
c. Combustible gas concentration in primary containment
d. Source range neutron flux (14) Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 135, are hereby incorporated into this renewed license.

PSEG Nuclear LLC shall operate the facility in accordance with the Additional Conditions.

(15) PSE&G to PSEG Nuclear LLC License Transfer Conditions

a. PSEG Nuclear LLC shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application, the requirements of the Order Approving Transfer of License and Conforming Amendment, dated February 16, 2000, and the related Safety Evaluation dated February 16, 2000.
b. The decommissioning trust agreement shall provide that:
1) The use of assets in both the qualified and non-qualified funds shall be limited to expenses related to decommissioning of the unit as defined by the NRC in its regulations and issuances, and as provided in the units renewed license and any amendments thereto. However, upon completion of decommissioning, as defined above, the assets may be used for any purpose authorized by law.
2) Investments in the securities or other obligations of PSE&G or affiliates thereof, or their successors or assigns, Renewed License No. NPF-57

shall be prohibited. In addition, except for investments tied to market indexes or other non-nuclear sector mutual funds, investments in any entity owning one or more nuclear power plants shall be prohibited.

3) No disbursements or payments from the trust shall be made by the trustee until the trustee has first given the NRC 30 days notice of the payment. In addition, no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the Director, Office of Nuclear Reactor Regulation.
4) The trust agreement shall not be modified in any material respect without prior written notification to the Director, Office of Nuclear Reactor Regulation.
5) The trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a prudent investor standard, as specified in 18 CFR 35.32(3) of the Federal Energy Regulatory Commissions regulations.
c. PSEG Nuclear LLC shall not take any action that would cause PSEG Power LLC or its parent companies to void, cancel, or diminish the commitment to fund an extended plant shutdown as represented in the application for approval of the transfer of this license from PSE&G to PSEG Nuclear LLC.

(16) Mitigation Strategy The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread Renewed License No. NPF-57
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders (17) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

(18) Upon implementation of Amendment No. 173 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by Surveillance Requirement 4.7.2.2.a, in accordance with TS 6.16.c.(i), the assessment of CRE habitability as required by Specification 6.16.c.(ii), and the measurement of CRE pressure as required by Specification 6.16.d, shall be considered met.

Following implementation:

a. The first performance of Surveillance Requirement 4.7.2.2.a, in accordance with Specification 6.16.c.(i), shall be within the specified frequency of 6 years, plus the 18 month allowance of Surveillance Requirement 4.0.2, as measured from July 29, 2001, the date of the most recent successful tracer gas test, as stated in the December 9, 2003 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
b. The first performance of the periodic assessment of CRE habitability, Specification 6.16.c(ii), shall be 3 years, plus the 9 month allowance of Surveillance Requirement 4.0.2, as measured from July 29, 2001, the date of the most recent successful tracer gas test, as stated in the December 9, 2003 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.
c. The first performance of the periodic measurement of CRE pressure, Specification 6.16.d, shall be within 18 months, plus the 138 days allowed by Surveillance Requirement 4.0.2, as measured from April 5, 2006, the date of the most recent Renewed License No. NPF-57

successful pressure measurement test, or within 138 days if not performed previously.

(19) Leak rate tests required by Surveillance Requirement 4.6.1.2.a and 4.6.1.2.h to be performed in accordance with the Primary Containment Leakage Rate Testing Program are not required to be performed until their next scheduled performance, which is due at the end of the first test interval that begins on the date the test was last performed prior to implementation of Amendment No. 174.

(20) Top Guide Beams Until there is more detailed guidance regarding the inspections of the top guide beams or the issue is resolved by the BWRVIP generically, the following license condition applies to Hope Creek to preclude the loss of the components intended function:

Enhanced visual testing (EVT-1) of the top guide grid beams will be performed in accordance with GE SIL 554 following the sample selection and inspection frequency of BWRVIP-47 for CRD guide tubes. That is, inspections will be performed on 5 percent of the population within six years, and 10 percent of the total population of cells within twelve years.

The sample locations selected for examination will be in areas that are exposed to the highest fluence. This inspection plan will be implemented beginning with the first RFO following EPU operation.

Renewed License No. NPF-57

(21) Vibration Acceptance Criteria for SRVs PSEG Nuclear LLC shall provide the Level 1 main steam safety relief valve vibration acceptance criteria to the NRC staff prior to increasing power above 3339 MWt.

(22) Steam Dryer This license condition provides for monitoring, evaluating, and taking prompt action in response to potential adverse flow effects as a result of power uprate operation on plant structures, systems, and components (including verifying the continued structural integrity of the stream dryer).

1. The following requirements are placed on initial operation of the facility at power levels above 3339 MWt to 3840 MWt for the power ascension:
a. PSEG Nuclear LLC shall monitor hourly the main steam line (MSL) strain gage data during power ascension above 3339 MWt for increasing pressure fluctuations in the steam lines.
b. PSEG Nuclear LLC shall hold the facility at 105 percent and 110 percent of 3339 MWt to collect data from the MSL strain gages required by Condition 1.a, conduct plant inspections and walkdowns, and evaluate steam dryer performance based on these data; shall submit the evaluation to the NRC staff upon completion of the evaluation; and shall not increase power above each hold point until 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> after submitted to the NRC.
c. If any frequency peak from the MSL strain gage data exceeds any of the Level 1 limit curves, PSEG Nuclear LLC shall return the facility to a lower power level at which the limit curve is not exceeded. PSEG Nuclear shall resolve the uncertainties in the steam dryer analysis, evaluate the continued structural integrity of the steam dryer, and submit that evaluation to the NRC staff.
d. In addition to evaluating the MSL strain gage data, PSEG Nuclear LLC shall monitor reactor pressure vessel water level instrumentation and MSL piping accelerometers on an hourly basis during power ascension above 3339 MWt. If resonance frequencies are identified as increasing above nominal levels in proportion to strain gage instrumentation data (including consideration of the EPU bump-up factor),

PSEG Nuclear LLC shall stop power ascension, evaluate the Renewed License No. NPF-57

continued structural integrity of the steam dryer, and submit that evaluation to the NRC staff.

2. PSEG Nuclear LLC shall implement the following actions for the initial power ascension at power levels above 3339 MWt to 3840 MWt:
a. In the event that acoustic signals are identified that challenge the limit curves during power ascension above 3339 MWt, PSEG Nuclear LLC shall evaluate dryer loads and re-establish the limit curves based on the new strain gage data, and shall perform a frequency-specific assessment of ACM uncertainty at the acoustic signal frequency including application of 65 percent bias error and 10 percent uncertainty to all the SRV acoustic resonances.
b. After reaching 111.5 percent of 3339 MWt, PSEG Nuclear LLC shall obtain measurements from the MSL strain gages and establish the steam dryer flow-induced vibration load fatigue margin for the facility, update the dryer stress report, and reestablish the limit curves with the updated ACM load definition, which will be submitted to the NRC staff.
c. After reaching 115 percent of 3339 MWt, PSEG Nuclear LLC shall obtain measurements from the MSL strain gages and establish the steam dryer flow-induced vibration load fatigue margin for the facility, update the dryer stress report, and re-establish the limit curves with the updated ACM load definition, which will be submitted to the NRC staff.
d. During power ascension above 3339 MWt, if an engineering evaluation is required because a Level 1 acceptance criterion is exceeded, PSEG Nuclear LLC shall perform the structural analysis to address frequency uncertainties up to

+/-10 percent and assure that peak responses that fall within this uncertainty band are addressed.

e. PSEG Nuclear LLC shall revise plant procedures to reflect long-term monitoring of plant parameters potentially indicative of steam dryer failure; to reflect consistency of the facilitys steam dryer inspection program with BWRVIP-139; and to identify the NRC Project Manager for the facility as the point of contact for providing power ascension testing information during power ascension.

Renewed License No. NPF-57

f. PSEG Nuclear LLC shall submit the final EPU steam dryer load definition for the facility to the NRC staff upon completion of the power ascension test program.
g. PSEG Nuclear LLC shall submit the flow-induced vibration related portions of the EPU startup test procedure to the NRC staff, including methodology for updating the limit curves, prior to initial power ascension above 3339 MWt.
3. PSEG Nuclear LLC shall prepare the EPU startup test procedure to include:
a. the stress limit curves to be applied for evaluating steam dryer performance;
b. specific hold points and their duration during EPU power ascension;
c. activities to be accomplished during hold points;
d. plant parameters to be monitored;
e. inspections and walk downs to be conducted for steam, FW, and condensate systems and components during the hold points;
f. methods to be used to trend plant parameters;
g. acceptance criteria for monitoring and trending plant parameters, and conducting the walkdowns and inspections;
h. actions to be taken if acceptance criteria are not satisfied; and
i. verification of the completion of commitments and planned actions specified in its application and all supplements to the application in support of the EPU license amendment request pertaining to the steam dryer prior to power increase above 3339 MWt.

PSEG Nuclear LLC shall provide the related EPU startup test procedure sections to the NRC staff prior to increasing power above 3339 MWt.

4. The following key attributes of the program for verifying the continued structural integrity of the steam dryer shall not be made less restrictive without prior NRC approval:

Renewed License No. NPF-57

a. During initial power ascension testing above CLTP, each test plateau increment shall be approximately 5 percent of 3339 MWt;
b. Level 1 performance criteria; and
c. The methodology for establishing the stress spectra used for the Level 1 and Level 2 performance criteria.

Changes to other aspects of the program for verifying the continued structural integrity of the steam dryer may be made in accordance with the guidance of NEI 99-04.

5. During the first scheduled refueling outage after Cycle 15 and during the first two scheduled refueling outages after reaching full EPU conditions, a visual inspection shall be conducted of all accessible, susceptible locations of the steam dryer in accordance with BWRVIP-139 inspection guidelines.
6. The results of the visual inspections of the steam dryer shall be reported to the NRC staff within 90 days following startup from the respective refueling outage. The results of the power ascension testing to verify the continued structural integrity of the steam dryer shall be submitted to the NRC staff in a report within 60 days following the completion of all Cycle 15 power ascension testing.

A supplement shall be submitted within 60 days following the completion of all EPU power ascension testing.

(23) Irradiated GE14i fuel bundles shall be stored at least four feet from the wall of the Spent Fuel Pool.

(24) PSEG Nuclear LLC may make changes to the programs and activities described in the UFSAR supplement, submitted pursuant to 10 CFR 54.21(d), as revised during the license renewal application review process, provided the licensee evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

(25) Appendix A of NUREG-2102, Safety Evaluation Report Related to the License Renewal of Hope Creek Generating Station, dated June 2011, and the licensee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d), as revised on May 19, 2011, describes certain future programs and activities to be completed before the period of extended operation. PSEG Nuclear LLC shall complete these activities no later than April 11, 2026, and shall notify the NRC in writing when implementation of these activities is complete.

Renewed License No. NPF-57

(26) The licensee will establish drainage capability from the bottom of the drywell air gap on or before June 30, 2015. The licensee will divide the drywell air gap into four approximately equal quadrants. Drainage consists of one drain in each quadrant for a total of four drains. Each drain will be open at the bottom of the drywell air gap and be capable of draining water from the air gap.

Until drainage is established from all four quadrants, the licensee will perform the following actions each refueling outage:

a. Perform boroscope examination of the bottom of the drywell air gap through penetrations located at elevation 93-0 in four quadrants, 90 degrees apart. The personnel performing the boroscope examination shall be certified as VT-1 inspectors in accordance with ASME Section XI, Subsection IWA-2300, requirements. The examiners will look for signs of water accumulation and drywell shell corrosion. Adverse conditions will be documented and addressed in the corrective action program.
b. Perform ultrasonic thickness (UT) measurements of the drywell shell between elevations 86-11 (floor of the drywell concrete) and 93-0 (bottom of penetration J13) below penetration J13 area. In addition, UT measurements shall be performed around the full 360 degree circumference of the drywell between elevations 86-11 and 88-0 (underside of the torus down comer vent piping penetrations). The results of the UT measurements shall be used to establish a corrosion rate and demonstrate that the effects of aging will be adequately managed such that the drywell can perform its intended function until April 11, 2046. Evidence of drywell shell degradation will be documented and addressed in the corrective action program.
c. Monitor penetration sleeve J13 daily for water leakage when the reactor cavity is flooded up. In addition, perform a walkdown of the torus room to detect any leakage from other drywell penetrations. These actions shall continue until corrective actions are taken to prevent leakage through J13.
d. Within 90 days of completion of each refueling outage, submit a report to the NRC staff in accordance with 10 CFR 50.4 summarizing the results from the boroscope examinations, UT measurements, leakage detected from penetrations, and if appropriate, corrective action.

(27) After drainage has been established from the bottom of the air gap in all four quadrants, the licensee will:

Renewed License No. NPF-57

a. Submit a report to the NRC staff in accordance with 10 CFR 50.4 describing the final drain line configuration and summarizing the testing results that demonstrate drainage has been established for all four quadrants.
b. Monitor penetration sleeve J13 daily for water leakage when the reactor cavity is flooded up. In addition, perform a walkdown of the torus room to detect any leakage from other drywell penetrations. These actions shall continue until corrective actions are taken to prevent leakage through J13 or through the four air gap drains.
c. Perform UT measurements of the drywell shell between elevation 86-11 (floor of the drywell concrete) and elevation 93-0 (bottom of penetration J13) below penetration J13 area during the next three refueling outages. In addition, UT measurements shall be performed around the full 360 degree circumference of the drywell between elevations 86-11 and 88-0 (underside of the torus down comer vent piping penetrations). The results of the UT measurements will be used to identify drywell surfaces requiring augmented inspections in accordance with IWE requirements for the period of extended operation, establish a corrosion rate, and demonstrate that the effects of aging will be adequately managed such that the drywell can perform its intended function until April 11, 2046. Within 90 days of completion of each refueling outage, submit a report to the NRC staff in accordance with 10 CFR 50.4 summarizing the results from the UT measurements and if appropriate, corrective action.

D. The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70. An exemption from the criticality alarm requirements of 10 CFR 70.24 was granted in Special Nuclear Material License No. 1953, dated August 21, 1985. This exemption is described in Section 9.1 of Supplement No. 5 to the SER. This previously granted exemption is continued in this renewed operating license. An exemption from certain requirements of Appendix A to 10 CFR Part 50, is described in Supplement No. 5 to the SER.

This exemption is a schedular exemption to the requirements of General Design Criterion 64, permitting delaying functionality of the Turbine Building Circulating Water System-Radiation Monitoring System until 5 percent power for local indication, and until 120 days after fuel load for control room indication (Appendix R of SSER 5). Exemptions from certain requirements of Appendix J to 10 CFR Part 50, are described in Supplement No. 5 to the SER. These include an exemption from the requirement of Appendix J, exempting main steam isolation valve leak-rate testing at 1.10 Pa (Section 6.2.6 of SSER 5); an exemption from Appendix J, exempting Type C testing on traversing incore probe system shear valves (Section 6.2.6 of SSER 5); an exemption from Appendix J, Renewed License No. NPF-57

exempting Type C testing for instrument lines and lines containing excess flow check valves (Section 6.2.6 of SSER 5); and an exemption from Appendix J, exempting Type C testing of thermal relief valves (Section 6.2.6 of SSER 5).

These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. These exemptions are hereby granted. The special circumstances regarding each exemption are identified in the referenced section of the safety evaluation report and the supplements thereto. These exemptions are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, submitted by letter dated May 19, 2006 are entitled: Salem-Hope Creek Nuclear Generating Station Security Training and Qualification Plan, and Salem-Hope Creek Nuclear Generating Station Security Contingency Plan. The plans contain Safeguards Information protected under 10 CFR 73.21.

F. DELETED G. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

H. This renewed license is effective as of the date of issuance and shall expire at midnight on April 11, 2046.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Eric J. Leeds, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A - Technical Specifications (NUREG-1202)
2. Appendix B - Environmental Protection Plan
3. Appendix C - Additional Conditions Date of Issuance: July 20, 2011 Renewed License No. NPF-57