Notice of Public Meeting with Licensee
ML111101187
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/20/2011
From: Glenn Dentel
Reactor Projects Branch 1
To:
Constellation Energy Group
Dentel, G RGN-I/DRP/BR1/610-337-5233
Shared Package
ML110610680 List:
References
MN 11-012
Download: ML111101187 (5)


Text

VIN No: 11-012 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING WITH LICENSEE ApriL 20, 20lL Constellation Energy Facility: R. E. Ginna Nuclear Power Plant Docket No. 50-244 Date and Time: Thursday, May 5, 2011, from 6:00 p.m. - 8:00 p.m.

Location: Ginna Emergency Operations Facility 1255 Research Forest Rd.

Macedon, NY, 14502

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will conduct a public meeting with Constellation Energy to discuss the NRC's annual assessment of licensee performance at R. E. Ginna Nuclear Power Plant for 2010, as described in the annual assessment letter, dated March 4, 2011. There will be a series of brief presentations starting at 6:00 p.m.

Following the presentations, the NRC will be available to address questions on specific performance issues at the plant and our role in ensuring safe plant operations.

Attendees:

NRC: D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Projects Branch 1, Region I G. Hunegs, Senior Resident lnspector, Ginna L. Casey, Resident Inspector, Ginna J. Hawkins, Project Engineer Constellation: J. Carlin, Vice President Ginna Station J. Packer, Plant General Manager D. Bierbrauer, Manager, Nuclear Safety & Security T. Paglia, Manager, Integrated Work Management T. Harding, Director Licensing Public Participation*: This is a Category 1 meeting. The public is invited to attend this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: qlenn.dentel@nrc.qov

2 The NRC's Annual Assessment Letter for R. E. Ginna Nuclear Power Plant can be located in ADAMS with Accession Number ML110620557. ADAMS is accessible from the NRC Web Site at: http:i/www. n rc. qov/read ng-rm/adams. htm l.

i Additional information relative to the NRC's AnnualAssessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at:

www. n rc. q ov/N R R/OVE RS G HT/ASS E SS/i ndex. htm l.

I The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.oov/readino-rm/doc-collections/commission/policy/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ

2 The NRC's Annual Assessment Letter for R. E. Ginna Nuclear Power Plant can be located in ADAMS with Accession Number ML110620557. ADAMS is accessible from the NRC Web Site at: http ://www. n rc. q ov/read n q -rm/ada ms. htm l.

i Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at:

www. n rc. o ov/N R R/OVE RS G HT/ASS ESS/l ndex. htm l.

I The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/readinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by

/RA/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution: (see attached)

DOCUMENT NAME: G:\DRP\BRANCHI\ROP Assessment\2011 ROP EOC\GiNNA AAM NOtiCE 11.dOCX SUNSI Review Complete: JRH (Reviewer's Initials)

After declaring this document'An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenVenclosure "N" = No copy ML111101187

)FFICE 1I/DRP lhp RI/DRP RYDRP

,IAME JHawkins/JRH GDentel/GTD 04t20 t1'l 04t20t11 OFFICIAL RECORD COPY

NRC's Annual Assessment Meeting R. E. Ginna Nuclear Power Plant May 5,2011 6:00 p.m. - 8:00 Ginna Emergency Operations Facility 1255 Research Forest Rd.

Macedon, NY, 14502 Formal Meetino Introduction Discussion of R. E. Ginna Nuclear Power Plant performance in 2010 ........... (10 minutes)

R. E. Ginna Nuclear Power Plant response and remarks (10 minutes)

Break (5 minutes)

Discussion of U.S. plant safety operations in light of Japan event........ (10 minutes)

NRC to address public questions (as needed)

Closing Remarks ....... (5 minutes)

4 Distribution:

Executive Director for Operations, OEDO (RTDSEDOMATLCENTER)

Deputy Executive Director for Reactor Programs, OED (RTDSEDOMATLCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RTDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation NRR (RTDSNRROD)

Director, Division of Inspection & Regional Support, NRRyDIRS (RTDSNRRDTRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RTDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement, OGC (RTDSOGCMATLCENTER)

W. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard, Rl OEDO G. Hunegs, DRP L. Casey, DRP M. Rose, DRP N. $heehan, PAO D. Screnci. PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl Receptionist ROPreports Resou rce@n rc. gov PMNS