UNITED STATES N UCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANlA 19406-1 41 5 May 26, ZOLL MEETING SUMMMARY MN No:

11-012 LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OFTHE MAY5, 2011 ANNUALASSESSMENTMEETING On May 5,2011, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted an AnnualAssessment Nlleeiing at the R. E. Ginna Emlrgency operations Facility in Macedon' NY' The NRC requestej tne melting with Constellation Energy management to discuss the NRC's assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for 2010' The NRC presented and discussed its assessment of the safety performance at Ginna for the period of january 1 through Decembe_r 3i,2010. The NRC presentation included information on the Reactor oversigni-process (RoP) and the results of NRC's performance assessment for Ginn". As part of thisiegulatory performance meeting, Constellation presented its perspective regarding the plant's performance and operational goals for 2011.

The public was invited to observe this meeting. At the end of the meeting between the NRC and constellation, the NRC discussed u.s. nuclear plant safety in light of the recent Japanese events. The public attendees were then offered the opportunity to communicate with the NRC regarding constellation's performance at Ginna and the role of the agency in ensuring safe piint opJrations. euestions from the public and local officials were addressed by the NRC' The NRC,s assessment letter for Ginna can be found in ADAMS with accession number ML110620557. Th; meeting notice, issued on April 20, 2011, was posted on the NRC's externaf (public) webpage "id ""n be found in ADAMS with accession number ML111110187 '

The NRC meeting slidel can be found in ADAMS with accession number ML111360546' The Ginna meeting slides can be found in ADAMS with accession number ML111450250' Additional information relative to the NRC's annual assessment process and the safety performance of Ginna can be found on the NRC's website at:

www.nrc.qovitrtRRIOVEnStGHtASSeSS/index.ntmt.

ADAMS is accessible from the NRC website at http://www. nrc.qov/readinq-rm/adams' htfnl' Sincerely,

&Lf ilH Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Attachment:

List of Attendees

MEETING SUMMMARY May 26,2011 MN No:

11-012 LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE MAY 5, 201 1 ANNUAL ASSESSMENT MEETING On May 5,2011, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted an AnnualAssessment Meeting at the R. E. Ginna Emergency Operations Facility in Macedon, NY.

The NRC requested the meeting with Constellation Energy management to discuss the NRC's assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for 2010.

The NRC presented and discussed its assessment of the safety performance at Ginna for the period of January 1 through December 31,2010. The NRC presentation included information on the Reactor Oversight Process (ROP) and the results of NRC's performance assessment for Ginna. As part of this regulatory performance meeting, Constellation presented its perspective regarding the plant's performance and operational goals for 2011.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Constellation, the NRC discussed U.S. nuclear plant safety in light of the recent Japanese events. The public attendees were then offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations. Questions from the public and local officials were addressed by the NRC.

The NRC's assessment letter for Ginna can be fourld in ADAMS with accession number ML110620557. The meeting notice, issued on April 20,2011, was posted on the NRC's external (public) webpage and can be found in ADAMS with accession number M1111110187.

The NRC meeting slides can be found in ADAMS with accession number ML1'l 1360546.

The Ginna meeting slides can be found in ADAMS with accession number ML111450250 Additional information relative to the NRC's annual assessment process and the safety performance of Ginna can be found on the NRC's vfebsite at:

www.nrc.oov/NRR/OVERSIGHT/ASSESS/lndex.htrinl.

ADAMS is accessible from the NRC website at http://vvrrvw. nrc.qovlreadinq-rm/adams. htfnl.

Sincerely, IRAI Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution: (see attached)

SUNSI Review Complete:

JRH (Reviewer'$ Initials)

DOCUMENT NAME: G:\\DRP\\BRANCHl\\ROP Assessment\\2011 ROP EOC\\Glnna 2011 AAM Summary.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a topy of this document, indicate in the box: "C" = Copy without attachmenUenclosure "E" = Copy MLl11 12 OFFICE RI/DRP llhp RI/DRP RI/DRP NAME JHawkins/JRH GDenteI/GTD DATE 05124111 05126l't1 OFFICIAL RECORD COPY with attachmenUenclosure 'N" = No copy

Distribution (via email)

W. Ddan, RA D. Lew, DRA D. Roberts. DRP J. Clifford. DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard, Rl OEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP K. Cronk, DRP N. Floyd, DRP G. Hunegs, DRP, SRI L. Casey, DRP, Rl M. Rose, DRP, OA D. Screnci, PAO N. Sheehan. PAO N. McNamara, SLO D. Tifft. SLO L. Larche. DRM RidsNrrPMREGinna Resource RidsNrrDorlLpll -1 Resourc'e ROPreports Reso u rce@nrc. g ov

LIST OF R. E. GINNA NUCL POWER PLANT ANNUAL ENT MEETING MAY 2011 NAME Anne Lithiluxa Jeff Hanson Carey Fleming Fred Rion Joe Sullivan Joe Pacher Steve Orr George Bisted Maria Hudson Al lsselhard Sue Higgins Cindy Switt Dr. Norman Loomin Richard Watts Dennis Landry Todd Chapman ORGANIZATION YNN News YNN News CENG Monroe County CENG CENG Democratic Chronicle Wayne County CENG Interested Public Message Post Media Interested Public Town of Ontario Monroe County Walworth Webster Ridge Runners Attachment