july 21, 2010 No.10-023 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee:
Constellation Energy Facility:
R. E. Ginna Nuclear Power Plant Docket No.
50-244 Date and Time:
August 4, 2010 5:00 p.m. to 6:00 p.m.
Location:
Ontario Town Hall 1850 Ridge Rd Ontario, NY, 14519
Purpose:
Supplemental Inspection Exit and Regulatory Performance Meeting with Constellation management. NRC will present the results of the 95002 supplemental inspection and discuss with Constellation issues associated with two "white" findings and one "white" Performance Indicator (PI) for the R. E. Ginna Nuclear Power Plant regarding the turbine-driven auxiliary feedwater (TDAFW) pump failures that occurred between December 2008 and July 2009.
Attendees:
NRC:
J. Clifford, Acting Director. Division of Reactor Projects. Region I G. Dentel, Chief, Projects Branch 1, Region I D. Werkheiser, Senior Resident Inspector, 95002 Team Lead G. Hunegs, Senior Resident Inspector, R. E. Ginna Station L. Casey, Resident Inspector, R. E. Ginna Station Constellation: M. Korsnick, eNO, Senior Vice President - Chief Operations Officer J. Carlin, Site Vice President, R. E. Ginna Station E. Larson, Plant General Manager P. Swift, Manager Engineering A. Smith, Acting Manager Nuclear Safety & Security D. Bierbrauer. Nuclear Safety Excellence Team Lead T. Harding, Director Licensing J. Sullivan, Manager Operations M. Giacini, Manager Maintenance
2 Public Partlcipation*: This is a Category 1 Meeting. The public is invited to observe this meeting, and will have an opportunity to communicate with the NRC staff before the meeting is adjourned regarding Constellation's performance.
The NRC will also be available to answer questions including those related to the results of the 95002 supplemental inspection that reviewed Constellation's performance and corrective actions associated with the recent TDAFW pump failures that occurred between December 2008 and July 2009, at Ginna.
This meeting notice can also be located in ADAMS with accession number ML102010415 ADAMS is accessible at: http://www.nrc.gov/reading-rm/adams.html. The NRC's assessment of performance related to the recent issues associated with the two white findings and one white performance indicator (PI) for the R. E. Ginna Nuclear Power Plant TDAFW pump will be documented in supplemental inspection report 05000244/2010007. This inspection was conducted in accordance with the guidance of NRC Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area," and will be issued within 45 days of this meeting.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002. applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov. and contains information regarding visitors and security.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at:
www.nrc.gov/NRRlOVERSIGHTJASSESS/index.html.
Meeting
Contact:
Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: glenn.dentel@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by August 2, 2010, via telephone to the NRC meeting contact.
Approved by:
~/~~/
Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects
2 Public Participation*: This is a Category 1 Meeting. The public is invited to observe this meeting, and will have an opportunity to communicate with the NRC staff before the meeting is adjourned regarding Constellation's performance.
The NRC will also be available to answer questions including those related to the results of the 95002 supplemental inspection that reviewed Constellation's performance and corrective actions associated with the recent TDAFW pump failures that occurred between December 2008 arid July 2009, at Ginna.
This meeting notice can also be located in ADAMS with accession number ML102010415.
ADAMS is accessible at: http://www.nrc.gov/reading-rm/adams.html. The NRC's assessment of performance related to the recent issues associated with the two white findings and one white performance indicator (PI) for the R. E. Ginna Nuclear Power Plant TDAFW pump will be documented in supplemental inspection report 05000244/2010007. This inspection was conducted in accordance with the guidance of NRC Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area," and will be issued within 45 days of this meeting.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov, and contains information regarding visitors and security.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESSlindex.html.
Meeting
Contact:
Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: glenn.dentel@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by August 2,2010, via telephone to the NRC meeting contact.
Approved by:
RA by Raymond J. Powell Acting For Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects SUNSI Review Complete: _-=JR....H-'--__ (Reviewer's Initials)
ML102010415 DOCUMENT NAME: G:\\DRP\\BRANCH1\\Ginna 95002\\Exit and RegPerf Mtg Preps\\Ginna 2010 __95002 Meeting Notice.doc After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" =Copy without attachment/enclosure "E" =Copy with attachment/enclosure "N" = No copy OFFICE RIIDRP jlhp RI/ORA I
RIIDRP I
NAME DWerkheise/dw DScrenci/ds GDentel/~for DATE 07/20/10 07/20/10 07/21/10 OFFICIAL RECORD COPY