Letter Sequence Other |
---|
TAC:ME4319, (Approved, Closed) TAC:ME4320, (Approved, Closed) TAC:ME4321, (Approved, Closed) TAC:ME4322, (Approved, Closed) TAC:ME4323, (Approved, Closed) TAC:ME4324, (Approved, Closed) TAC:ME4325, (Approved, Closed) |
|
MONTHYEARML1020100912010-07-12012 July 2010 Units 2 & 3 and North Anna & Surry, Units 1 & 2 - Supplement to Request for Approval of the Cyber Security Plan Project stage: Supplement ML1021602322010-07-29029 July 2010 Regarding ME4319-25, Dominion Fleet Cyber Security Plan Amendment Submittals, with the Addition of ML101900201, Guidance on Implementation Schedule Project stage: Other ML1021602272010-07-29029 July 2010 Regarding ME4319-25, Dominion Fleet Cyber Security Plan Amendment Submittals Project stage: Other ML1021602022010-07-29029 July 2010 ME4319-25 - Dominion Acceptance Conference Call Project stage: Other ML1022102842010-08-0505 August 2010 Supplement to Request for Approval of the Cyber Security Plan Project stage: Supplement ML1026706412010-09-23023 September 2010 Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope Project stage: Request ML1031604222010-11-10010 November 2010 Scope of Systems Clarification Project stage: Request ML1032703572010-11-22022 November 2010 Fleet (Kewaunee, Millstone 2 & 3, North Anna 1 & 2, Surry 1 & 2) Nuclear Plants Email - Cyber Security Plan (License Amendment (TAC No. ME4319, ME4320,4321, ME4322, 4323, and ME4324, 4325) Project stage: Other ML1035600832010-12-13013 December 2010 Response to Request for Additional Information on Cyber Security Plan Project stage: Response to RAI ML1106303592011-03-0707 March 2011 Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan Project stage: RAI ML1109606652011-04-0404 April 2011 Cyber Security Plan, Response to Request for Additional Information Project stage: Response to RAI ML11143A0632011-05-17017 May 2011 Submittal of Consolidated Cyber Security Plan and RAI Response Project stage: Other ML11200A2222011-07-19019 July 2011 NRR E-mail Capture - ME4319 - Pertaining to Kewaunee Power Station - State Consultation Project stage: Other ML11222A0832011-08-0404 August 2011 Cyber Security Plan License Condition Project stage: Other ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants Project stage: Approval ML1120310832011-09-30030 September 2011 Issuance of Amendments Cyber Security Plan Project stage: Approval 2010-09-23
[Table View] |
Fleet (Kewaunee, Millstone 2 & 3, North Anna 1 & 2, Surry 1 & 2) Nuclear Plants Email - Cyber Security Plan (License Amendment (TAC No. ME4319, ME4320,4321, ME4322, 4323, and ME4324, 4325)ML103270357 |
Person / Time |
---|
Site: |
Millstone, Kewaunee, Surry, North Anna ![Dominion icon.png](/w/images/b/b0/Dominion_icon.png) |
---|
Issue date: |
11/22/2010 |
---|
From: |
V Sreenivas Plant Licensing Branch II |
---|
To: |
Heacock D Virginia Electric & Power Co (VEPCO) |
---|
Sreenivas V.NRR/DORL/LPL2-1 415-2597 |
References |
---|
TAC ME4319, TAC ME4320, TAC ME4321, TAC ME4322, TAC ME4323, TAC ME4324, TAC ME4325, FOIA/PA-2011-0115 |
Download: ML103270357 (2) |
|
|
---|
Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR 2024-02-01
[Table view] |
Text
From: Sreenivas, V To: "david.heacock@dom.com" Cc: Tom Shaub; Margaret.Earle@dom.com; Cotton, Karen; Sanders, Carleen; Kulesa, Gloria; Feintuch, Karl
Subject:
DOMINION FLEET (KEWAUNEE, MILLSTONE 2 & 3, NORTH ANNA 1 & 2, SURRY 1 & 2) NUCLEAR PLANTS -
CYBER SECURITY PLAN (LICENSE AMENDMENT (TAC NO. ME4319, ME4320/4321, ME4322/4323, AND ME4324/4325)
Date: Monday, November 22, 2010 3:59:00 PM REQUEST FOR ADDITIONAL INFORMATION By letter dated July 12, 2010 (Agencywide Documents Access and Management System (ADAMS),
Accession No. ML1020100910), Dominion (Kewaunee, Millstone 2 & 3, North Anna 1 & 2, Surry 1 &
- 2) (the licensee) submitted a request to amend the Facility Operating License (DPR-43, DPR-65, NPF-49, NPF-4/7, DPR-32/37 respectively) for the Dominion sites. Per the proposed license amendment, the licensee requested approval of Dominion's Cyber Security Plan (CSP),
(ML1020100920), provided a proposed CSP Implementation Schedule, and included a proposed revision to the Facility Operating License to incorporate the provisions for implementing and maintaining in effect the provisions of the approved CSP. The licensees amendment request was based on a generic template developed by the Nuclear Energy Institute (NEI) in concert with the industry.
The NRC is in the process of reviewing the CSP and the proposed CSP Implementation Schedule. The NRC staff requests that additional information is required to complete its technical review. A supplemental request for additional information is the following:
Section: 4 Establishing, Implementing, and Maintaining the Cyber Security Program, Vulnerability Scanning:
One of the requirements of 10 CFR 73.54(c)(1) requires the cyber security program to implement security controls to protect the assets identified by paragraph 73.54(b)(1) from cyber attacks.
The CSP is based on the template contained in NEI 08-09, Revision 6. In Section 4.4.3.2, Vulnerability Scans, of the Dominion CSP the following text adverse impact to SSEP functions was omitted although this text is included in the NEI 08-09 template. The Dominion CSP notes in its deviation table that there are conditions other than adverse impact on SSEP functions when vulnerability scanning cannot be performed.
Please explain these other conditions when vulnerability scanning cannot be performed. If you have any questions, please contact me at 301-415-2597 or Karl Feintuch at 301-415-3079.
V. Sreenivas, PH.D., C.P.M.,
Project Manager, Rm.#O8F6, LPL2-1 North Anna Power Reactors, Units 1 and 2 Division of Operating Reactor Licensing-NRR (301) 415-2597, v.sreenivas@nrc.gov
- This email message, and any files transmitted with it, may contain confidential, non-public, sensitive and proprietary data intended solely for the person(s) to whom this email message is directly addressed. Unauthorized use of the data contained in this message is prohibited. If you are not the intended recipient of this message or have received this message in error, please notify the sender immediately by telephone or email Reply and delete the original message and any attachments without keeping a copy***