Summary of Telephone Conference Call Held on September 23, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition Activitie
ML102920561
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/22/2010
From: Mahesh Chawla
Plant Licensing Branch III
To:
Entergy Operations
Chawla M, NRR/DORL, 415-8371
References
TAC ME0072
Download: ML102920561 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 22, 2010 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 23,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The enclosure provides the status of each task and shows several tasks as complete. The licensee reported that Palisades NFPA 805 Team is targeting license amendment request completion by December 31, 2010; however, all contingency time has been consumed. The licensee is bringing additional resources to support this date. The NRC staff stressed upon the licensee to ensure that meeting the scheduled date does not affect the quality of the submittal. The NRC staff participated in the final fire Probabilistic Risk Assessment (PRA) peer review during the week of August 22,2010. The licensee is planning to schedule an additional fire PRA review in December 2010.

Background

On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

UJ2~JYvL-Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ

9/23/10 Palisades NFPA 805 Project Milestones NEI Task Milestone Start Title Status' No. Date' Date' Transition of Nuclear Safety Performance Criteria (NEI See Task 1:

04-02 Table B-2) 10106/10 Comments Fundamental Fire Protection Program & Design See Task 2:

Elements INEI 04-02 Table B-1\

10106/10 Comments Radioactive Release Transition Task 3:

IINEI 04-02 Table G-1\

- Complete -

Nuclear Safety Analysis Transition See Task 4:

IINEI 04-02 Table B-3}

11/10/10 -

Comments ST4.1.1 Off-Site Power Cable Selection and Analysis 11/01/10 On Track -

ST 4.1.2 Other Power Cable Selection and Analysis - Complete -

ST 4.1.3 Subsequent Cablellnstrument Identification & Analysis - Complete -

Non-Power Operational Modes Transition See Task 5: 10/13/10 -

NEI 04-02 Table F-1\ Comments Task 6: Internal Events PRA 11/12110 On Track -

ST 6.2.1 Prepare LERF Model - Complete -

ST6.2.2 Update Flooding Analysis - Complete -

ST6.3 Thermal Hydraulic Analysis for MSO/HRA - Complete -

ST6.4 Intemal Events PRA Peer Review - Complete -

See Task 7: Fire PRA 11/15/10 Comments ST 7.6.4 R3 Intemal Events Model - Complete -

ST7.7 Quantification Risk Screening - Complete -

ST7.8 Scoping for Fire Modeling - Complete -

ST7.9/10 Circuit Failure Mode Likelihood Analysis - Complete -

See ST7.12 Post Fire HRA 10/19/10 Comments ST 7.13 Seismic Fire Interaction Assessment - Complete -

See ST7.14 Fire Risk Quantification 10101/10 Comments See ST7.15 Uncertainty and Sensitivity Analysis 10/15/10 Comments ST 7.17.4 In-Process Fire PRA Peer Review - Complete -

See ST7.17.5 Final Fire PRA Peer Review 12115/10 Comments See Task 8: NFPA 805 Fire Risk 1 Change Evaluations 11/16/10 Comments See ST 8.1 Fire Risk 1 Change Evaluations 11/01/10 Comments See ST8.2 Non-Compliance Risk Evaluations 11/11/10 10104/10 Comments See Task 10: Transition Report 11/19/10 Comments Task11: License Amendment Request (LAR) 12131/10 On Track -

Noles:

1 The current schedule (B05 T4-7 a 13SEP10) dales were validated to be on or before these dales unless otherwise noted.

2 "On Track- means that the task current percentage completed is <!: the expected completion percent and the expected completion date for the task is projected to be mel.

3 Start dates provided are estimates and may vary contingent upon predecessor completion and available resources at that time. Even if this start date is adjusted, the completion date is still expected to be met unless indicated otherwise.

Comments:

Tasks 1, 2, & 5 are in final review.

Task 4 - Completionextended due to incorporation of commentsfrom independentPRA review associatedwith cable circuit analysis, fire risk evaluations, and evaluation of variances from deterministic requirements.

Task 7 - Completionextended due to extensionof Subtasks7.14 & 7.15 based on alignment with Task 4 extension.

Task 8 & 10 - Task 7 is pushing out Task 8 & 10 as the Fire Risk Evaluations(FRE's) & Transition Report (TR) can not be completeduntil the DeterministicFire PRA is complete.

Task 11 - The PalisadeNFPA 805 Team is targeting LAR completionby 12131/2010; however,all contingencytime has been consumed. Additional resourceshave been obtainedto support this date.

Enclosure 1 E:\Palisades\PLP\Enforcemenl Extension\NRC Conf calls\Milestone Itrs\NRC Milestones 09-23-10.xls

TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.

LIST OF PARTICIPANTS SEPTEMBER 23, 2010 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief Harrv Barrett Senior Fire Protection Enaineer ENTERGY Jim Miksa Engineering Programs Manager Paula Anderson Licensing Manager Brian Bogan PRA Lead Tom Swiecicki Fire Protection Lead Engineer Roger Stobert Contract Project Manager Chad Main Project Manager Jim Kuemin Licensing Engineer Enclosure 2

ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

Mahesh Chawla, Project Manager IRAJ Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via Listserv Distribution:

PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TTaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarrett, NRR RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEliegood, Rill DMerzke, EDO R-III CSteger, NRR ADAMS Accession No'.. ML102920561 OFFICE LPL3-1/PM LPL3-1/LA DRAlAFPB/BC LPL3-1/BC NAME MChawla BTuily AKlein RPascarelli DATE 10/21/10 10/20/10 10/21/10 10/22/10