UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 12, 2010 LICENSEE:
Entergy Operations, Inc.
FACILITIES: Palisades Nuclear Plant SUB..IECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 27,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee reported that further schedule delays have occurred due to increase in the work scope and the availability of the resources. The licensee has also changed the final completion date for the project from August 20, 2010, to September 30, 2010. Enclosure 2 provides the list of all attendees.
Background
On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
~~~
Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\\10. 50-255
Enclosures:
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ
1/27/2010 Palisades NFPA 805 Project Milestones NEI Task No.
Title Milestone Date' Status' Start Date Task 1:
Transition of Nuclear Safety Performance Criteria (NEI 04-02 Table B-2\\
03/12/10 See Comments Task 2:
Fundamental Fire Protection Program & Design Elements (NEI 04-02 Table B-1\\
04/13/10 See Comments Task 3:
Radioactive Release Transition (NEI 04-02 Tabl G-1\\
05/21/10 See Comments Task 4:
Nuclear Safety Analysis Transition (NEI 04-02 Table B-3) 07/21/10 See Comments ST 4.1.1 Off-Site Power Cable Selection and Analysis 07/21/10 See Comments ST 4.1.2 Other Power Cable Selection and Analysis Complete ST 4.1.3 Subsequent Cablellnstrument Identification &
Analysis 03/19/10 See Comments Task 5:
Non-Power Operational Modes Transition NEI 04-02 Table F-1\\
04/07/10 See Comments Task 6:
Internal Events PRA 08/17110 See Comments ST 6.2.1 Prepare LERF Model Complete ST 6.2.2 Update Flooding Analysis Complete ST6.3 Thermal Hydraulic Analysis for MSOIHRA 03108/10 See Comments ST 6.4 Internal Events PRA Peer Review Complete Task 7:
Fire PRA 06/21/10 See Comments ST 7.6.4 R3 Internal Events Model Complete ST 7.7 Quantification Risk Screening Complete ST 7.8 Scoping for Fire Modeling Complete ST 7.9/10 Circuit Failure Mode Likelihood Analysis Complete ST7.12 Post Fire HRA 03/11/10 See Comments ST7.13 Seismic Fire Interaction Assessment Complete ST 7.14 Fire Risk Quantification 04/07/10 See Comments ST7.15 Uncertainty and Sensitivity Analysis 04/15/10 See Comments ST7.17.4 In-Process Fire PRA Peer Review Complete ST 7.17.5 Final Fire PRA Peer Review 06/30/10 On Track Task 8:
NFPA 805 Fire Risk 1Change Evaluations 07/07/10 See Comments ST 8.1 Fire Risk 1Change Evaluations 06/14/10 See Comments ST 8.2 Non-Compliance Risk Evaluations 07/07/10 See Comments 06/15/10 Task 9:
Palisades Mapping of Post Transition Procedures & Document Revisions 05/21/10 See Comments 02/22/10 Task 10:
Transition Report 08/06/10 See Comments Task 11:
License Amendment Request (LAR) 09/30/10 See Comments Notes:
1 The original milestone datesper schedule PLP 80551-3 WIFe Schedule 12NOV08 andare subject to change. The current schedule (80ST1*2C 18JAN10) dateswere validated to be on or beforethesedales unlessotherwise noted.
2 "OnTrack"meansthatthe task currentpercentagecompleted ill the expected completion percentandthe expectedcompletion date forthe task is projected to be met.
3 Startdates provided are estimatesandmay vary contingent uponpredecessor completion and availableresources at thattime. Even if thisstartdate is adjusted, the completion date is stillexpected 10be met unlessindicated otherwise.
Comments:
All uncompleted task dates have been extended as a result of resource leveling and the additional scope resulting from FAQ's and the pilot plant RAI's. To ensure a quality submittal, these task dates will continue to evolve as the expectations for the submittal crystallize and to ensure the submittal is within 6 months after the second pilot plant SER.
E:IPalisadeslPLPIEnlorcement ExtensionlNRC ConI callslMilestone ItrslNRC Milestones 01*27*10.xls
TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.
LIST OF PARTICIPANTS JANUARY 27,2010 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief Harrv Barrett Senior Fire Protection Enaineer Alan Dahbur Electrical Engineer REGION ENTERGY Bob VanWagner Program Engineering Manager PALISADES NUCLEAR PLANT Tom Swiecicki Fire Protection Lead Roger Stobert Contract Project Manager NFPA 805 Chad Main Project Manager Brian Bogan PRA Lead Frank Yanik Contract PRA Paula Anderson Licensing Manager Jim Miksa Assistant Operations Manager Jim Kuemin Licensing Engineer
ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
Mahesh Chawla, Project Manager IRAJ Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosures:
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via Listserv Distribution:
PUBLIC LPL3-1 rtf RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TIaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarretl, NRR RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEliegood, Rill SBagley, EDO R-III CTucci, NRR ADAMS Accession No'.. ML100550661 OFFICE LPL3-1/PM DRAlAFPB/BC LPL3-1/BC NAME LPL3-1/LA MChawla BTuily AKlein RPascarelli DATE 02/25/10 02/25/10 03/02/10 03/12/10