UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 Jillle 8, 2010 LICENSEE:
Entergy Operations. Inc.
FACILITIES: Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MARCH 30, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The enclosure provides the status of each task and shows several of the tasks as complete. The licensee reported that all the tasks were on track and there were no other concerns with respect to meeting the final LAR issuance date of December 31, 2010. Enclosure 2 provides the list of all attendees.
Background
On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML083260577). NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
~??!ML Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosures:
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ
3/30/10 Palisades NFPA 805 Project Milestones NEI Task No.
Title Milestone Date' Status' Start Date3 Task 1:
Transition of Nuclear Safety Performance Criteria INEI 04-02 Table B-2\\
09/24/10 On Track Task 2:
Fundamental Fire Protection Program & Design Elements IINEI 04-02 Table B-1\\
09/23/10 On Track Task 3:
Radioactive Release Transition (NEI 04-02 Table G-1) 09/23/10 On Track Task 4:
Nuclear Safety Analysis Transition (NEI 04-02 Table B-3) 11/01/10 On Track ST 4.1.1 Off-Site Power Cable Selection and Analysis 11/01/10 On Track ST 4.1.2 Other Power Cable Selection and Analysis Complete ST 4.1.3 Subsequent Cable/Instrument Identification & Analysis 06/18/10 On Track Task 5:
Non-Power Operational Modes Transition IINEI 04-02 Table F-1\\
09/23/10 On Track Task 6:
Intemal Events PRA 11/12/10 On Track ST 6.2.1 Prepare LERF Model Complete ST 6.2.2 Update Flooding Analysis Complete ST6.3 Thermal Hydraulic Analysis for MSO/HRA Complete ST6.4 Intemal Events PRA Peer Review Complete Task 7:
Fire PRA 10/12110 On Track ST 7.6.4 R3 Internal Events Model Complete ST7.7 Quantification Risk Screening Complete ST7.8 Scoping for Fire Modeling Complete ST 7.9/10 Circuit Failure Mode Likelihood Analysis Complete ST7.12 Post Fire HRA 08/27/10 On Track ST7.13 Seismic Fire Interaction Assessment Complete ST 7.14 Fire Risk Quantification 08/06/10 On Track ST 7.15 Uncertainty and Sensitivity Analysis 08/06/10 On Track ST 7.17.4 In-Process Fire PRA Peer Review Complete ST7.17.5 Final Fire PRA Peer Review 06/25/10 On Track Task 8:
NFPA 805 Fire Risk / Change Evaluations 09/23/10 On Track ST 8.1 Fire Risk / Change Evaluations 09/23/10 On Track ST 8.2 Non-Compliance Risk Evaluations 09/23/10 On Track OS/24/10 Task 10:
Transition Report 11/15/10 On Track Task 11:
License Amendment Request (LAR) 12/31/10 On Track Notes:
1 The currentschedule(805 T2-2N 22MAR10) dates were validatedto be on or before these dates unlessotherwisenoted.
2 "OnTrack"means that the task currentpercentagecompletedill the expected completion percentand the expected completion date for the task is projectedto be met.
3 Start dates providedare estimatesand may vary contingentupon predecessorcompletion and availableresourcesat that time. Even if thisstart date is adjusted.the completion date is slill expected to be met unless indicated otherwise.
Comments:
None.
E:IPalisadeslPLPIEnforcement Extension\\NRC Conf callslMilestone Itrs\\NRC Milestones 03-30-10.xls
TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.
LIST OF PARTICIPANTS MARCH 30, 2010 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Mahesh Chawla Proiect Manaaer HEADQUARTERS Harrv Barrett Senior Fire Protection Enaineer ENTERGY Paula Anderson Licensina Manaaer Jim Kuemin Licensing Engineer Tom Swiecicki Fire Protection Lead Chad Main Project Manager Brian Bogan PRA Lead Roger Stobert Contract Project Manager NFPA 805 Alan Blind Engineering Director Frank Yanik PRA Engineer
ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
Mahesh Chawla, Project Manager IRA!
Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosures:
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via Listserv Distribution:
PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TTaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarrett, NRR RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEllegood, Rill SBagJey, EDO R-1I1 CSteger, NRR ADAMS Accession No" ML101440247 OFFICE LPL3-1/PM LPL3-1/LA DRNAFPB/BC LPL3-1/BC NAME MChawia BTully AKlein RPascarelli DATE OS/27/10 06/08/10 06/01/10 06/08/10