Fitness for Duty Program Performance Report for Period of January 1, 2008 Through June 30, 2008
ML082410124
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/27/2008
From: Lahti L
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML082410124 (5)


Text

Entergy Nuclear O perations, Inc.

--- Eritergy Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 August 27, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Duty Program Performance Report

Dear Sir or Madam:

Entergy Nuclear Operations, Inc, (ENO) is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2008, through June 30, 2008.

Enclosures 1 and 2 summarize the test results at the PNP.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Laurie A. Lahti Licensing Manager Palisades Nuclear Plant Enclosures (2)

CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ENCLOSUREI PALISADES NUCLEAR PLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January 1 through June 30, 2008

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, a total of 291 random tests were conducted with the following results:

Donor Group Random Tests Results Employees 201 Random testing identified no positive drug/alcohol results.

Contractors 90 Random testing identified no positive drug/alcohol results.

The percentage of random tests conducted during this period was 32%.

The positive drug/alcohol rate for 2008 indicates a stable trend for employees and contractors. There was no negative trend during the analysis.

Random Tests Positive Rate Leading Substance Employees C/V's Employees C/V's Cocaine THC 1998 767 208 0.5% 0.0% -- 3 1999 496 140 0.2% 0.0% 1 --

2000 536 53 0.0% 0.0% -- --

2001 438 131 0.0% 0.0% -- --

2002 482 122 0.0% 0.0% -- --

2003 366 156 0.3% 0.0% 1 2004 390 219 0.2% 0.0% -- 1 2005 157 77 0.0% 0.0% -- --

2006 350 186 0.3% 0.0% -- 1 2007 283 279 0.0% 0.0% -- --

2008 201 90 0.0% 0.0% --

B. PRE-ACCESS TESTING A total of 235 pre-access tests were conducted during this reporting period.

Page 1 of 2

C. FOR CAUSE/POST-ACCIDENT TESTING Two post-accident tests were administered during the reporting period. One of the test results was negative, the other was positive.

D. FOLLOW-UP TESTING No individuals tested positive during follow-up testing.

E. APPEALS The appeals process was initiated once during this reporting period.

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no fitness for duty events that required reporting in accordance with 10 CFR 26.73.

Page 2of2

ENCLOSURE2 PALISADES NUCLEAR PLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA January 1 through June 30, 2008 Entergy Nuclear Operations, In c. June LD8 Company 6 Months Ending Palisades Nuclear Plant Location 269-764-2565 Ph one (incl ud e A rea o e Mike Nock Contact Name Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana 100 15 Amphetamines 1000 /500 / -

Cocaine 300 / 150 Phencyclidine 25 / 25 Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04

  • Anv detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Personnel Employees Personnel Average Number With Unescorted Access 545 N/A 341

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access 91 0 --- --- 146 0 FOR Post- 0 0 --- --- 2 1 CAUSE Accident Observed 0 0 --- --- 0 0 Behavior Random 201 0 --- --- 90 0 Follow-up 19 0 --- --- 19 0 Other 0 0 --- --- 0 0 TOTAL 311 0 --- --- 257 1 Page 1 of 2

Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees Long-Term Contractors Short-Term Contractors 1 Total 1 1 _J Page 2of2