January 14, 2009 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 7, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES (TAC NO. ME0072)

A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted Palisades NFPA 805 Project Milestones table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Since some of the tasks were listed as Not Started, NRC staff made a recommendation to add the startup dates for all the tasks. The licensee will submit an updated table prior to the status call next month. Enclosure 2 provides the list of all attendees.

Background

On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconferences with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

Mahesh Chawla, Project Manager /RA/

Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1. Table - Palisades NFPA 805 Project Milestones
2. Table - List of Attendees cc w/encls: Distribution via ListServ

ML090080421 *via e-mail dated 1/08/09 OE/Enforcement OFFICE LPL3-1/PM LPL3-1/LA DRA/AFPB/BC LPL3-1/BC Specialist NAME MChawla BTully GGulla

  • AKlein
  • LJames DATE 01/13/09 01/13/09 01/08/09 01/08/09 01/14/09 January 7, 2009 Palisades NFPA 805 Project Milestones NEI Task Milestone Title Status No. Date¹ Transition of Nuclear Safety Performance Criteria Task 1: 03/04/09 On Track (NEI 04-02 Table B-2)

Fundamental Fire Protection Program & Design Elements Task 2: 07/13/09 On Track (NEI 04-02 Table B-1)

Task 3: Radioactive Release Transition 04/06/09 Not Started Nuclear Safety Analysis Transition Task 4: 09/30/09 On Track (NEI 04-02 Table B-3)

ST 4.1.1 Off-Site Power Cable Selection and Analysis 02/15/09 On Track ST 4.1.2 Other Power Cable Selection and Analysis 03/15/09 On Track Non-Power Operational Modes Transition Task 5: 05/26/09 On Track (NEI 04-02 Table F-1)

Task 6: Internal Events PRA 02/17/10 On Track ST 6.2.1 Prepare LERF Model 07/31/09 On Track ST 6.2.2 Update Flooding Analysis 07/31/09 On Track ST 6.3 Thermal Hydraulic Analysis for MSO/HRA 03/15/09 On Track Task 7: Fire PRA 12/22/09 On Track ST 7.6.4 R3 Internal Events Model 04/01/09 On Track ST 7.7 Quantification Risk Screening 05/15/09 Not Started ST 7.8 Scoping for Fire Modeling 07/15/09 Not Started ST 7.9/10 Circuit Failure Mode Likelihood Analysis 07/15/09 Not Started ST 7.12 Post Fire HRA 07/15/09 Not Started ST 7.13 Seismic Fire Interaction Assessment 07/31/09 Not Started ST 7.14 Fire Risk Quantification 09/15/09 Not Started ST 7.15 Uncertainty and Sensitivity Analysis 09/15/09 Not Started Task 8: NFPA 805 Change Evaluations 02/01/10 Not Started ST 8.1 Change Evaluations 12/01/09 Not Started ST 8.2 Non-Compliance Risk Evaluations 12/01/09 Not Started Palisades Mapping of Post Transition Procedures & Document Task 9: 01/08/10 Not Started Revisions Task 10: Transition Report 03/18/10 Not Started Task 11: License Amendment Request (LAR) 03/19/10 Not Started

¹Original milestone dates per schedule PLP 805 S1-3 WIFC Schedule 12NOV08 and are subject to change.

Enclosure 1

TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.

LIST OF PARTICIPANTS JANUARY 7, 2009 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Mahesh Chawla Project Manager HEADQUARTERS Alex Klein Branch Chief Harold Barrett Senior Fire Protection (FP) Engineer Gerald Gulla Enforcement Specialist John Ellegood Senior Resident Engineer REGION 3 Alan Dahbur Electrical Engineer ENTERGY Laurie Lahti Licensing Manager PALISADES NUCLEAR PLANT Alan Blind Acting Engineering Director Tom Swiecicki FP Engineer Brian Brogan Probabilistic Safety Assessment (PSA)

Engineer Frank Yanik PSA Engineer Bob VanWagner Programs Engineering Manager Jim Kuemin Licensing Engineer Roger Stobert Contractor Pablo Guardado Corporate FP Engineer Enclosure 2