Other: 3F0311-09, Review of License Renewal Application (TAC No. ME0278) - Submittal of Florida Department of Environmental Protection Document Requested, 3F1109-06, License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-6, 3F1209-04, Response to Follow-up to Progress Energy RAI Responses on CR-3 SAMA Evaluation, ML090350657, ML090420362, ML090780840, ML091200415, ML091590006, ML091760512, ML100050166, ML100980517, ML100980519, ML100980520, ML100980523, ML100980524, ML100980525, ML100980526, ML100980527, ML100980528, ML101320401, ML101460577, ML103070380, ML110460629, ML110820185, ML11140A100, ML11180A275, ML12213A058
|
MONTHYEARHNP-09-016, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors2009-02-26026 February 2009 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Project stage: Request ML0907808402009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant (TAC No ME0278) FRN Project stage: Other ML0903506572009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0912004152009-05-22022 May 2009 Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0509-07, License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information2009-05-22022 May 2009 License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information Project stage: Supplement ML1013204012009-05-31031 May 2009 093-89529, Environmental Support Document South Cooling Tower Laydown Area Citrus County, Florida Project stage: Other ML0904203622009-06-10010 June 2009 Nuclear Generating Plant License Renewal Review Project stage: Other ML0915900062009-07-0202 July 2009 License Amendment, Adoption of Technical Specifications Taskforce (TSTF) Standard Technical Specification Change Traveler TSTF-447, Elimination of Hydrogen Recombiners & Change to Hydrogen & Oxygen Monitors Project stage: Other ML0917605122009-07-14014 July 2009 Environmental Site Audit Regarding Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other ML0919700682009-08-10010 August 2009 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML1009805272009-08-28028 August 2009 State of Florida Department of Environmental Protection, Conditions of Certification Project stage: Other ML0926705232009-10-0606 October 2009 Request for Additional Information Regarding the Review of the License Renewal Application for the Crystal River, Units 3 Nuclear Generating Plant Project stage: RAI 3F1009-03, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives2009-10-0909 October 2009 Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Project stage: Response to RAI ML1009805282009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Non-Radiological Waste Radiation Protection, Socioeconomics Terrestrial Ecology Project stage: Other ML1009805232009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, Additional References, Through AR-3, Page 7 Project stage: Other 3F1109-04, Response to Request for Additional Information Re Review of License Renewal Application for Environmental Review2009-11-0505 November 2009 Response to Request for Additional Information Re Review of License Renewal Application for Environmental Review Project stage: Response to RAI ML1009805202009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology (Except AQ-3), Archaeology Project stage: Other ML1009805192009-11-0505 November 2009 Nuclear Generating Plant License Renewal, Revised Environmental Site Audit Needs List, Air, Meteorology, Climate Project stage: Other ML1009805242009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Aquatic Ecology AQ-3 Project stage: Other ML1009805252009-11-0505 November 2009 Plant Operating Manual AI-571, Sea Turtle Rescue and Handling Guidance Project stage: Other ML1009805182009-11-0505 November 2009 Response to Request for Additional Information Regarding the Review of the License Renewal Application - Revised Environmental Site Audit Needs List Project stage: Response to RAI ML1009805172009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List Hydrology (Additional Reference 8 Through 16) Project stage: Other ML1009805262009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Hydrology (Through Additional Reference 6) Project stage: Other 3F1109-06, License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-62009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-6 Project stage: Other 3F1209-04, Response to Follow-up to Progress Energy RAI Responses on CR-3 SAMA Evaluation2009-12-18018 December 2009 Response to Follow-up to Progress Energy RAI Responses on CR-3 SAMA Evaluation Project stage: Other ML1000501662010-01-25025 January 2010 Revised Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0210-01, Revised Environmental Site Audit Needs List (TAC No. ME0278) - Supplemental Documents2010-02-0808 February 2010 Revised Environmental Site Audit Needs List (TAC No. ME0278) - Supplemental Documents Project stage: Supplement ML1005702082010-03-0505 March 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0410-03, Response to Request for Additional Information for Review of License Renewal Application - Environmental Review2010-04-0101 April 2010 Response to Request for Additional Information for Review of License Renewal Application - Environmental Review Project stage: Response to RAI ML1013204002010-04-0101 April 2010 Response to Request for Additional Information for the Review of the License Renewal Application - Environmental Document Request Project stage: Response to RAI ML1013804082010-06-0303 June 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0610-07, Response to Request for Additional Information for Review of License Renewal Application TAC ME0278 - Environmental Review2010-06-28028 June 2010 Response to Request for Additional Information for Review of License Renewal Application TAC ME0278 - Environmental Review Project stage: Response to RAI ML1021502722010-06-28028 June 2010 Response to Request for Additional Information for Review of License Renewal Application - Environmental Document Request Project stage: Response to RAI ML1014605772010-08-12012 August 2010 Revised Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML1030703802010-11-0505 November 2010 Revised Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML1104606292011-02-15015 February 2011 E-mail Dated 2/15/11, CR-3 License Renewal NPDES and South Cooling Tower Update Project stage: Other ML1103200902011-02-17017 February 2011 Schedule Revision for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Approval ML1104904622011-03-21021 March 2011 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Approval ML1108201852011-03-23023 March 2011 E-mail Crystal River, Unit 3 Scoping Summary Report Distribution Project stage: Other 3F0311-09, Review of License Renewal Application (TAC No. ME0278) - Submittal of Florida Department of Environmental Protection Document Requested2011-03-24024 March 2011 Review of License Renewal Application (TAC No. ME0278) - Submittal of Florida Department of Environmental Protection Document Requested Project stage: Other ML11090A0052011-05-26026 May 2011 Florida Power Corporation, Crystal River, Unit 3, Notice of Availability of Draft Supplement 44 to GEIS for License Renewal of Nuclear Plants & Public Meetings ML11139A1532011-05-31031 May 2011 NUREG-1437 Supp 44 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Crystal River Unit 3 Nuclear Generating Plant (Draft for Comment). Project stage: Draft Other ML11140A1002011-06-0101 June 2011 Essential Fish Habitat Assessment for License Renewal of Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML11112A1222011-06-10010 June 2011 Request for Additional Information and Schedule Revision for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML11180A2752011-06-28028 June 2011 Preliminary Site-Specific Results of the License Renewal Environmental Review for Crystal River Unit 3 Project stage: Other ML1119403622011-06-28028 June 2011 License Renewal Public Meeting Evening Session Project stage: Meeting ML1119402862011-06-28028 June 2011 Transcript of Crystal River, Unit 3, Environmental Review, Afternoon Session, 06/28/2011, Pages 1-81 Project stage: Request ML11187A1902011-07-18018 July 2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Crystal River 3 Nuclear Generating Plant License Renewal Application Project stage: Meeting 3F0711-05, Comments on the Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Draft Report for Comment (NUREG-1437, Supplement 44)2011-07-20020 July 2011 Comments on the Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Draft Report for Comment (NUREG-1437, Supplement 44) ML12213A0582012-08-0707 August 2012 Project Manager Change for the License Renewal of Crystal River Unit 3 Project stage: Other 2010-03-05
[Table View] |
Text
June 3, 2010 Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT, LICENSE RENEWAL APPLICATION (TAC NO. ME0278)
Dear Mr. Franke:
By letter dated December 16, 2008, Florida Power Corporation submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating license for Crystal River Unit 3 Nuclear Generating Plant, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the environmental report submitted with the license renewal application and has identified, in the enclosure, additional information which is needed to complete the review.
Items in the enclosure were discussed with Mr. Michael Heath, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-8517 or by e-mail at elaine.keegan@nrc.gov.
Sincerely,
/RA/
Elaine M. Keegan, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/encl: See next page
ML101380408 OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NAME EKeegan YEdmonds DWrona EKeegan DATE 05/27/10 05/27/10 06/03/10 06/03/10
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION FOR CRYSTAL RIVER UNIT 3 DOCKET NO. 50-302 This enclosure provides the requests for additional information that is needed by the U.S.
Nuclear Regulatory Commission (NRC) staff to complete its review of the Crystal River Nuclear Generating Plant, Unit 3 (CR-3) application for license renewal and prepare the draft supplemental environmental impact statement. To support the staffs continued review of the CR-3 environmental report (ER), please provide the information and documents described below.
RAI 1 Provide a status of plans to study elevated levels of Na, As, Ra-226 and Ra-228, and gross alpha in some monitoring wells associated with Industrial Wastewater Permit No.
FLA016960, including a description of study plan (Geosyntec).
RAI 2 Provide annual groundwater use data from 2000 to 2009 in a spreadsheet format.
RAI 3 Provide summary of design features for two coal runoff ponds, including bottom and top areas, bottom and top elevations, peak inflow and outflow, peak storage, and fact that they are lined with a geosynthetic clay liner.
RAI 4 Provide a brief documentation that the oil storage tanks were cleaned, closed (including date), and converted to warehouse facilities.
RAI 5 Provide Progress Energys response to RAI from Florida Department of Environmental Protection on NPDES Major Permit Modification Application - Units 1, 2, and 3.
DOCUMENTS:
1 EnHydro, 2009, Progress Energy - Crystal River Energy Complex Aquifer Performance Test Plan, Conditions of Certification PA-77-09K, revised February 18, 2009. (As required by Special Condition #15 of COC; Wells 5, 6, 7, 8, 9, and 10).
2 EnHydro, 2009, New and Rehabilitated Production Wells - Capacity Testing Results Progress Energy Florida - Crystal River Energy Complex, Crystal River, Florida, letter from H. Cliff Harrison, EnHydro to Michael Scrader, Lead Environmental Specialist, Progress Energy Florida, Inc., September 8, 2009. (Including cover letter) 3 Progress Energy, 2010, CCP and Solid Waste Management Plan - Crystal River Energy Complex, revised April 14, 2010.
4 Florida Department of Environmental Protection Solid Waste Management Facility Inspection Checklist, 2009, WACS No. 97667 - Inspection Report for CRECs Ash Management Areas - two pages, with narrative and signature; dated February 5, 2009.
2 5 EnHydro, 2006, Water Use Feasibility and Impact Assessment Report, submitted to the SFWMD in support of a modification to Power Plant Site Certification PA77-09, June 5, 2006.
6 EnHydro, 2006, Response to Request for Additional Information (RAI) Water Use Permit Application No. 20003672.001, Site Certification PA77-06, CREC, letter from EnHydro to Michael Shrader, Lead Environmental Specialist, Progress Energy Florida, Inc.,
November 26, 2006.
7 EnHydro and Quest Ecology, 2009, Baseline Wetland Assessment Procedure (WAP)
Report SWFMD Permit #20003672.001, Conditions of Certification PA77-09K, May 27, 2009.
8 Geraghty and Miller, Inc., 1979, Hydrogeologic Report of Florida Power Corporations Proposed Well Field of Supply Water to Units 4 and 5 at Crystal River, Florida, October 15. NOTE: Cited in the ER (Chapter 4).
9 TtNUS (Tetra Tech NUS), 2008, Groundwater Drawdown Calculation Package, Aiken, South Carolina, October 2008. NOTE: Cited in the ER (Chapter 4); include model input files for independent verification of results.
10 Progress Energy, 2010, NPDES Permit Renewal Application (Electronic Version) - Units 1, 2, and 3 - April 2010, including all attachments and application reports (i.e., 2008 Fish Impingement Study and 2008 ReMetrix Sea Grass Study).
11 Progress Energy, 2010, NPDES Permit Renewal Application (Electronic Version) - Units 4 and 5 - January 2010, including Parts 1, 2, and 3.
12 Progress Energy, 2009, NPDES Major Permit Modification Application (Electronic Version) - Units 1, 2, and 3 - submitted to FDEP by Michael Shrader, Lead Environmental Specialist, on September 11, 2009.
13 Progress Energy, 2008, Monitoring Report for the month of August 2008 (Permit PA 77-09 and NPDES FL0036366-Major; Units 4 and 5) with cover letter from Larry Hatcher, Plant Manager, Crystal River Fossil Plant & Fuel Operations, dated September 25, 2008.
14 Progress Energy, 2004, Monitoring Report for the month of September 2004 (3rd Quarter) for Units 1, 2, and 3.
Letter to J. Franke from E. Keegan dated June 3, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT, LICENSE RENEWAL APPLICATION (TAC NO. ME0278)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter E Keegan RKuntz DBrittner DLogan AJones, OGC LLake, RII MSykes, RII TMorrissey, RII
Crystal River Unit 3 Nuclear Generating Plant cc:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, FL 33733-4042 Mr. James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Mr. Ruben D. Almaguer, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, FL 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Daniel R. Westcott Supervisor, Licensing & Regulatory Programs Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 Mr. Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. David T. Conley Associate General Counsel II - Legal Dept.
Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551 Mr. Michael P. Heath Supervisor, License Renewal Progress Energy 8470 River Road, SE Southport, NC 28461 Mr. Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Robert J. Duncan II Vice President, Nuclear Operations Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551
Crystal River Unit 3 Nuclear Generating Plant cc:
Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551 Mr. Brian Moore 5559 Cactus Circle Spring Hill, FL 34606 Ms. Gail Grimm 1007 W. Main Street Inverness, FL 34450 Mr. John H. Ring 220 N. Big Oaks Point Lecanto, FL 34461 Mr. Andrija (Andy) Vukmir 1498 N. Endicott Point Crystal River, FL 34423 Mr. Dixie Hollins Citrus County Chamber of Commerce P.O. Box 277 Crystal River, FL 34423 Mr. Gary W. Maidhof Department Director Citrus County Government 3600 W. Sovereign Path Suite 109 Lecanto, FL 34461