ML12054A062

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Fire Protection
ML12054A062
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/13/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Poole J
References
Download: ML12054A062 (3)


Text

...~",I\ REGu~ UNITED STATES

~~v ~o." NUCLEAR REGULATORY COMMISSION

! ~0 WASHINGTON, D.C. 20555-0001

<C

~

~

""1-" ~ March 13, 2012

~o

        • i' LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF NOVEMBER 3,2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT SUBMITTALS On November 3,2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.

The NRC staff and TVA discussed information regarding the review of the Fire Protection Report, outstanding issues in FSAR Section 9 Auxiliary Systems, and the Individual Plant Examination for External Events (IPEEE) report review.

During the discussion on the Fire Protection Report (FPR), the NRC and TVA staff discussed a new version of the FPR changes table and whether it contained an adequate level of detail.

TVA stated that they would submit to the NRC the TVA generated summary of each of the changes for each revision of the FPR, as well as the summary and conclusions of the TVA documents justifying the changes (i.e., Safety Analyses-Safety Evaluations, License Condition Impact Evaluations).

For the discussions on FSAR Section 9, TVA provided additional information on the design of the spent fuel pool cooling, component cooling water, and essential raw cooling water systems for duel unit operation as a followup to the meeting held on October 12, 2010.

The NRC staff and TVA went over proposed requests for additional information on IPEEE.

-2 Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv

- 2 Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB R/F PMNS Resources RidsNrrlLABClayton (Hard copy) RidsOpaMail Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource MKotzala, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource JLedford, RII CSteger, N RR RHanna, RII ADAMS Accession -

No'.. MI 12045A062 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 03/07/12 03/07/12 03/13/12 OFFICIAL RECORD COpy