ML101031395

From kanterella
Jump to navigation Jump to search
Summary of the March 2010 Annual Assessment Meeting with Constellation Energy Regarding Safety Performance of the R. E. Ginna Nuclear Power Plant for 2009
ML101031395
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/13/2010
From: Glenn Dentel
Reactor Projects Branch 1
To:
Shared Package
ML100541651 List:
References
Download: ML101031395 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 13. 2010 MEETING SUMMMARY LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE MARCH 2010 ANNUAL ASSESSMENT MEETING WITH CONSTELLATION ENERGY On March 23, 2010, at 5:00 p.m., the NRC conducted an Annual Assessment Meeting at the Ontario Town Hall in Ontario, NY. The NRC requested the meeting with Constellation Energy management to discuss the NRC's assessment of thE~ safety performance of the R. E. Ginna Nuclear Power Plant for 2009.

The NRC presented and discussed its assessment of the safety performance of Ginna for the period between January 1 through December 31,2009. The NRC presentation included information on the Reactor Oversight Process (ROP) and the results of NRC's performance assessment for Ginna. As part of this regulatory performance meeting, Constellation presented its perspective regarding the plant's performance and operational goals for 2010.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Constellation, public attendees were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations. Questions from the public and Jocal officials were addressed by the NRC.

The NRC's assessment letter can be found in ADAMS with an Accession Number of ML100620833. The annual assessment meeting notice can be found in ADAMS package ML100541651. The NRC slides can be located in ADAMS with an Accession Number of ML100680735. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html.

SJL-~M Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Attachment:

List of Attendees

I I

l April 13, 2010 MEETING SUMMMARY LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE MARCH 2010 ANNUAL ASSESSMENT MEETING WITH ]!,'

CONSTELLATION ENERGY On March 23,2010, at 5:00 p.m., the NRC conducted an Annual Assessment Meeting at the Ontario It" Town Hall in Ontario, NY. The NRC requested the meeting with Constellation Energy management to discuss the NRC's assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for I' 2009.

The NRC presented and discussed its assessment of the safety performance of Ginna for the period between January 1 through December 31, 2009. The NRC presentation included information on the Reactor Oversight Process (ROP) and the results of NRC's performance assessment for Ginna. As part of this regulatory performance meeting, Constellation presented its perspective regarding the plant's performance and operational goals for 2010.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Constellation, public attendees were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations.

Questions from the public and local officials were addressed by the NRC.

The NRC's assessment letter can be found in ADAMS with an Accession Number of ML100620833.

I, The annual assessment meeting notice can be found in ADAMS package ML100541651. The NRC slides can be located in ADAMS with an Accession Number of ML100680735. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRAJ Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Attach ment: List of Attendees SUNSI Review Complete: GTD (Reviewer's Initials)

DOCUMENT NAME: G:\DRP\BRANCH1\ROP Assessment Prc;cess Documents\2010 ROP EOC\Annual Assessment Ltrs & 'I Mtgs\Ginna 2010 MM Summary. doc After declaring this document "An Official Agency Record" it will be released to the Public. ML101031395

To receive a copy of this document, indicate in the box: "e" Copy without attachment/enclosure "E" Copy with

=

attachment/enc!osure "N" No copy OFFICE RIIDRP I RIIDRP I I NAME JHawkins.JSMcCarver for GDentel/GD DATE 04113/10 04113/10

LIST OF ATTENDEES R. E. GINNA NUCLEAR POWER PLANT MARCH 2010 ANNUAL ASSESSMENT MEETING TUESDAY, MARCH 23, 2010 NAME ORGANIZATION Bob Kelsch Town of Ontario I Jack Torbitt Ginna Carey Fleming Constellation Energy Nuclear Group. LLC Mark Giacini Michael Annett Ginna Ginna It Joe Sullivan Ginna L Mark Headley Ginna Mark Leszczynski Monroe County OEM Larry Miroles Ginna Gary Bastedo Wayne County H. Loomis Town Officer Rick Nudd Cindy Swift