STATE OF NEBRASKA Dave Heineman DEPARTMENT OF NATURAL RESOURCES Governor Brian P. Dunnigan, P.E.
Director Mach 9, 20M IN REPLY TO:
David L Maton. Branch Chief Projwb Branch I Division of ns Renewal Ofi of Nue Reactor Regl ion UnW State ROVlaoy Commission Washigtn DC 20555 Der Mr. p..on:
A letter sent by you hb" 4A2009. to the Nd f D of Natural Resources is being nmnm 7W10afeqm a1W f poteced wie. 7 apropaeNembrak agency for awques is thO Neba* Gam and Pks C such msso t he :
- followingadd Krism SWtor Nebraska Game and Pads Commission P.O. Box 30370 Lincoln, NE 6SS03470 Ifw. can b of a to yau in oior plow fed ftc to contim a Sincwmy,
,. -r ./ -
. :-kanAngI n Fnclosur cc: Kfital Stoner, NOWC
-"_S" 301 Centennial Mall South, 4th Floor
- PO. Box 94676
- Lincoln, Nebraska 68509-4676 An Equal Opportunity/AffirmativeAction Employer Printed with soy ink on recycled paper
- Phone (402) 471-2363
-
- Telefax (402) 471-2900 A
UNITED STATES KLp NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 04, 2009 RECEIVED Ms. Ann Salomon Bleed, Director FEB-0 9 2009 Nebraska Department of Natural Resources 301 Centennial Mall South DEPARTMENT OF P.O. Box 94676 NATURALRESOURCES Lincoln, NE 68509-4676
SUBJECT:
REQUEST FOR LIST OF PROTECTED SPECIES WITHIN THE AREA UNDER EVALUATION FOR THE COOPER NUCLEAR STATION, UNIT 1 LICENSE RENEWAL APPLICATION REVIEW
Dear Ms. Bleed:
The U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing an application submitted by the Nebraska Public Power District (NPPD) for the renewal of the operating license for Cooper Nuclear Station (CNS) Unit 1. Cooper Nuclear Station (CNS), located in Nemaha County, Nebraska (NE), on the west bank of the Missouri River at river mile (RM) 532.5. The Village of Brownville, NE is located approximately 2.25 miles northwest of the site, and Lincoln, NE, is located approximately 60 miles west northwest of the site. As part of the review of the license renewal application (LRA), the NRC is preparing a Supplemental Environmental Impact Statement (SEIS) under the provisions of Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51), the NRC's regulation that implements the National Environmental Policy Act (NEPA) of 1969. The SEIS includes an analysis of pertinent environmental issues, including endangered or threatened species and impacts to fish and wildlife. This letter is being submitted under the provisions of the Endangered Species Act of 1973, as amended, and the Fish and Wildlife Coordination Act of 1934, as amended.
The site surroundings are predominantly agricultural with zero population within a one-half mile radius of the plant. Brownville, NE, is the nearest developed community, at a distance of approximately 2.25 miles from the site, and a 2005 population of approximately 137. The largest town with industry within 10 miles is Auburn, .NE, located to the west, with a 2005 population of approximately 3,076. Maryville, Missouri, located approximately 40 miles east of the plant, is the largest community within 50 miles and had a 2005 population of approximately 10,567.
Over 99 percent of the acreage in Nemaha County is used for agriculture and farming. Farming is the major activity for the rest of the area within a 50-mile radius as well. The site is located on a constructional plain bordering the west bank of the Missouri River. It is situated on the first bottomland of the broad, nearly level, flood plain, which is approximately six miles wide at the site. The U.S. Army Corps of Engineers (USACE) has stabilized the channel by use of pile dikes and bank protection. Earthen levees run parallel with the Missouri River, on both sides of the river.
A. Bleed The station site grade level of 903 feet above mean sea level (AMSL) has been raised 13 feet above the natural grade level of 890 feet AMSL, in order to bring final grade one foot above the existing 902 feet AMSL levee constructed by the USACE. The6 ,site slopes generally east, with surface drainage toward the Missouri River.
The CNS property includes 239 acres on the east side of the Missouri River in Atchison County, Missouri, the most northwestern county in Missouri, bounded on the west by the Missouri River.
The eastern bank of the Missouri River is chiefly a densely forested land similar to the un-farmable bluffs that run parallel to the Missouri River. To the west there are bluffs that peak at 1,100 feet, but average 1,000 feet along the stretch of river from Brownville to Nemaha Beyond the bluffs, the land is a gently rolling flood plain.
There are several Native American lands within a 50-mile radius of CNS. These include the Sac and Fox Reservation, Iowa Reservation, and Kickapoo Reservation. There are also several local and county parks, golf courses, forest lands, wildlife areas, and other public recreation lands within a 50-mile radius of CNS.
Flow of the Missouri River at CNS is largely controlled by the Gavins Point Dam located about 200 miles upstream in Yankton, South Dakota. The flow is highly channelized with swift flows and heavy sediment transport. Wing dams are located on the Missouri side of the river near CNS to force the flow into a central channel.
The USACE constructed and operates six of the seven mainstem dams on the Missouri River; the U.S. Bureau of Reclamation operates the seventh, Canyon Ferry Dam, east of Helena, Montana. When the USACE constructed five of the Missouri River mainstem dams in the 1950s and 1960s after passage of the Pick-Sloan Plan, goals for dam and reservoir operations were to reduce flood damages, enhance navigation, generate hydroelectric power, and store water for irrigation.
Missouri River reservoirs and river segments presently contain populations of exotic fishes, including cisco, several salmon and trout species, and several Asian carp species. Some of these species have contributed to the development of economically important recreational fisheries.
CNS cooling is classified as a circulating water system that uses water taken from the Missouri River. Water passes through trash racks and then through traveling screens. A major portion of the flow is directed to the circulating water pumps, which deliver water to the main condenser. A smaller portion of the Missouri River water is used by the service water pumps. The discharge from the condenser and from the service water system is returned via the discharge channel to the river. The circulating water intake structure (CWIS) is located on the west shoreline. In front
A. Bleed of theOWIS is a guide wall and submerged weir constructed of steel sheet piling that runs parallel to and at distance of 14.25,.feet (ft) from the face of the intake.
Four circulating water pumps provide the circulating water for the facility. Each pump can draw 159,000 gpm. The pump design water level is at El. 875.0 ft, with a minimum submergence level at El. 865.0 ft. There are four service water pumps providing a combined flow of 32,000 gpm. Velocities in the intake structure are 1.1 ft/sec under the curtain wall, 0.7 ft/sec at the trash racks, and approximately 2.0 ft/sec at the traveling water screens., These velocities were calculated at low water levels (El. 874.5 ft) and maximum circulating water pump flow (159,000 gpm per pump). The flow is highly channelized with swift flows and heavy sediment transport.
To minimize the effects of sedimentation on the intake, turning vanes and a low sheetpile wall are located in front of the intake bays. Wing dams are located on the Missouri side of the river to force the flow into a central channel. During the winter, ice is very common on the river. To prevent ice damage, ice deflector barges are installed during the winter months. To prevent the formation of frazzle ice, some of the main condenser discharge water (25-30 percent) is re-circulated through the ice control tunnel and released in front of the trash rack within the CWlS while the remaining water is discharged about 1,300 ft downstream of the intake via a discharge canal.
The chlorination system connection is located on the common inlet to Screen Wash Pump A and B from the service water system. Bacteria that occur naturally in the Missouri River may contribute to the growth of biological film fouling of the main condenser tubes. The station is proceeding with a study to determine if routine chemical injection (chlorine, bromine, etc.) will be effective in eliminating the microbiological film on the interior walls of the condenser tubes.
Water leaves the pump house and circulates through the condenser, where it is collected from the condenser section through a large manifold. It then travels through concrete tunnels to the seal well structure and the discharge canal. At the rated circulating water flow of 631,000 gpm through the condenser and at design power on the turbine generator, the temperature rise through the condenser is approximately 17.8 0 F. From the seal well and gate control structure, the water is directed into a discharge canal that is approximately 1,000 ft long; it then enters the river at a slight angle. The velocity of discharge is about 1 fps during average water levels of 879.4 ft AMSL and 35,000 cfs flow, and increases to about 2.5 fps as the water surface elevation is reduced to 874.5 ft AMSL and flows near 11,000 cfs.
The transmission lines which were constructed to connect CNS to the grid for purposes of power distribution includes (1) NPPD line TL3501 (345 kV energized in August 1.969) 63.6 miles in length from CNS to the Mark T. Moore substation near Hallam, Nebraska, (2) NPPD line TL3502 (345 kV energized in July 1970) 82.6 miles in length from the Mark T. Moore substation to the Grand Island substation, (3) Omaha Public Power District (OPPD) Line "60," which was already planned when CNS was constructed, and (4) NPPD line TL3504 was energized as a 345 kV line in July 1970 and is 0.64 miles in length from CNS to the center of the Missouri River.
.\ -~
A. Bleed The transmission line "K-Towers" are supported by two wooden poles that are 26 feet apart.
Therefore, the farming activity adjacent to and under the towers and lines continues essentially unimpeded with the only land removed from service being that upon which transmission poles physically rest. No cultivated land along the transmission route has been removed from service as a result of rights-of-way, and access for repairs and maintenance is requested on an individual basis from each property owner. For the remainder of the transmission line route, which passes over non-cultivated land, the right-of-way (ROW) is cleared only of woody plants that have a growth pattern that would cause them to grow into or fall onto the line conductors.
Thereafter, control of these species is maintained; however, all of the natural grasses and low growing bushy, woody plants are allowed to grow.
There are no densely forested areas on the transmission route, and the land beneath the transmission lines is allowed to return to its natural state. Steel towers are used for the lines crossing the Missouri River and in the immediate vicinity of the station. Based on NPPD clearance practices, the required minimum ground clearance is 29.3 feet.
Provided for your information is the CNS Site Layout (Enclosure 1) and Transmission Line Map (Enclosure 2). To support the SEIS preparation process and to ensure compliance with Section 7 of the Endangered Species Act, the NRC requests information on State-listed, proposed, and candidate species and critical habitat that may be in the vicinity of CNS and its associated transmission line rights-of-way. In addition, please provide any information you consider appropriate under the provisions of the Fish and Wildlife Coordination Act.
The NRC staff plans to hold two public license renewal and environmental scoping meetings on February 25, 2009. There will be two sessions, an afternoon and evening session, to accommodate interested parties. The first session will be held at the Brownville Concert Hall at 126 Atlantic St., Brownville, NE 68321 telephone (402) 825-3331, and will convene at 1:30 p.m.
and will continue until 4:30 p.m., as necessary. The second session will be held at the Auburn Senior Center at 1101 J St., Auburn, NE 68305, telephone (402) 274 3420, and will convene at 7:00 p.m., with a repeat of the overview portions of the meeting and will continue until 10:00 p.m., as necessary. In addition, during the week of March 30, 2009, the NRC plans to conduct a site audit. You and your staff are invited to attend both the public meetings and the site audit.
Your office will receive a copy of the draft SEIS along with a request for comments.
A. Bleed The anticipated publication date for the draft SEIS is December 2009. If you have any questions concerning the NRC staff's-review of this license renewal application, please contact NRC's Project Managers, Tam Tran, by telephone,1-800-368-5642, extension 3617, or by email to the NRC at tam.tran(cnrc.qov, or Emmanuel Sayoc, by telephone, 1-800-368-5642, extension 1924, or by email to the NRC at emmanuel.savocanrc.qov.
Sincerely, id L'. Pelton, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. Site Layout
- 2. Transmission Line Map cc w/encls: See next page
- ' * *,*1 ,T**
Cooper Nuclear Station cc:
Mr. Ronald D. Asche Mr. H. Floyd Gilzow President and Chief Executive Officer Deputy Director for Policy Nebraska Public Power District Missouri Department of Natural Resources 1414 15th Street P.O. Box 176 Columbus, NE. 68601 Jefferson City, MO 65102-0176.
Mr. Gene Mace Senior Resident Inspector Nuclear Asset Manager U.S. Nuclear Regulatory Commission Nebraska Public Power District. P.O. Box 218 P.O. Box 98 Brownville, NE 68321 Brownville, NE 68321 Regional Administrator, Region IV Mr. John C. McClure U.S. Nuclear Regulatory Commission Vice President and General Counsel 612 E. Lamar Blvd., Suite 400 Nebraska Public Power District Arlington, TX 76011-4125 P.O. Box 499 Columbus, NE 68602-0499 Director, Missouri State Emergency Management Agency Mr. David Van Der Kamp P.O. Box 116 Licensing Manager Jefferson City, MO 65102-0116 Nebraska Public Power District P.O. Box 98 Chief, Radiation and Asbestos Brownville, NE 68321 Control Section Kansas Department of Health Mr. Michael J. Linder, Director and Environment Nebraska Department of Environmental Bureau of Air and Radiation Quality 1000 SW Jackson P.O. Box 98922 Suite 310 Lincoln, NE 68509-8922 Topeka, KS 66612-1366 Chairman Ms. Melanie Rasmussen Nemaha County Board of Commissioners Radiation Control Program Director Nemaha County Courthouse Bureau of Radiological Health 1824 N Street Iowa Department of Public Health Auburn, NE 68305 Lucas State Office Building, 5th Floor 321 East 12th Street Ms. Julia Schmitt, Manager Des Moines, IA 50319 Radiation Control Program Nebraska Health & Human Services R & L Mr. Keith G. Henke, Planner Public Health Assurance Division of Community and Public Health 301 Centennial Mall, South Office of Emergency Coordination P.O. Box 95007 930 Wildwood P.O. Box 570 Lincoln, NE 68509-5007 Jefferson City, MO 65102
Cooper Nuclear Station Cc:
Mr. Art Zaremba, Director of Nuclear Garry Young Safety Assurance License Renewal Manager Nebraska Public Power District Entergy Nuclear P.O. Box 98 1448 S.R. 333, N-GSB-45 Brownville, NE 68321 Russellville, AK 72802 Mr. John F. McCann, Director Alan Cox Licensing, Entergy Nuclear Northeast License Renewal Technical Manager Entergy Nuclear Operations, Inc. Entergy Nuclear 44Q Hamilton Avenue 1448 S.R. 333, N-GSB-45 White Plains, NY 10601-1813 Russellville, AK 72802 Steward Minahan Dave Lach Vice President LRP Entergy Project Manager Nuclear and Chief Nuclear Officer Entergy Nuclear Cooper Nuclear Station 1448 S.R. 333, N-GSB-45 72676 - 648A Avenue Russellville, AK 72802 Brownville, NE 68321 Jerry Perry Mike Boyce 500 S. Main Street Cooper Strategic Initiatives Manager Rock Port, MO 64482 Cooper Nuclear Station 72676 - 648A Avenue Yolanda Peck Brownville, NE 68321 1008 Central Ave.
Auburn, NE 68305 Dave Bremer License Renewal Project Manager Kendall Neiman Cooper Nuclear Station 830 Central Ave.
72676 - 648A Ave'nue Auburn, NE 68305 Brownville, NE 68321 Annie Thomas Bill Victor 1522 1 Street License Renewal Project Licensing Lead Auburn, NE 68305 Cooper Nuclear Station 72676 - 648A Avenue John Chaney Brownville, NE 68321 1101 1 7 th Street Auburn, NE 68305 Jim Loynes License Renewal Project Engineer Darrell Kruse Cooper Nuclear Station 2415 McConnell Ave.
72676 - 648A Avenue Auburn, NE 68305 Brownville, NE 68321 Daryl J. Obermeyer 64381 727A Road Brownville, NE 68321
'I.
Cooper Nuclear Station cc:
Sherry Black, Director Mark Miles Auburn Memorial Library State Historic Preservation Officer 1810 Courthouse Ave. Department of Natural Resources Auburn, NE 68305 P.O. Box 176 Jefferson City, MO 65102 Board of Brownville, NE Attn: Chairman Marty Hayes Michael J. Smith P.O. Box 67 State Historic Preservation Officer 223 Main Street Nebraska State Historical Society Brownville, NE 68321 P.O. Box 82554 Lincoln, NE 68501 Bob Engles Mayor of Auburn, NE Robert Puschendorf 1101 J Street Nebraska State Historical Society Auburn, NE 68305 1500 R Street, P.O. Box 82554, Jo Stevens Lincoln, NE 68501-2554 Mayor of Rock Port, MO 500 S. Main Street Rock Port, MO 64482 John Cochnar U.S. Fish and Wildlife Service Ecological Services Nebraska Field Office 203 West Second Street Grand Island, NE 68801 John Askew Regional Administrator U.S. EPA Region 7 901 N. 5 th Street Kansas City, KS 66101 Joann Scheafer, Director Nebraska Department of Health & Human Services 301 Centennial Mall South Lincoln, NE 68509 Doyle Childers, Director Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102
6 MlIl Raq us, NEBRASKA '1,QprNu!. ear S~aiion
- MISSOU RI Re LA4~c! 2 3 4 I~4~;~
44~Milos Cooper Nuclear Station Site Map - 6 Mile Radius ENCLOSURE 1
,4,,*, *,*!*,,*
, i'.
I Transmission Lines Lincoln, NE I Omaha, NE Cooper Nuclear Station Transmission Lines ENCLOSURE 2
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555-0001 OFFICIAL BUSINESS 02 IM 0004230860
$01 FEBC MAILED FROM ZIP COD)
Ms. Ann Salomon Bleed, Director Nebraska Department of Natural Resources 301 Centennial Mall South RECEIVED P.O. Box 94676 Lincoln, NE 68509-4676 FEB 09 2009 DEPARTMENT OF NATURAL RESOURCES