2/19/09 Public Meeting Handout: Draft Topical Report Prioritization Scheme
ML090650242
Person / Time
Site: Nuclear Energy Institute, Boiling Water Reactor Owners Group, PROJ0669, PROJ0700, PROJ0694
Issue date: 03/12/2009
From: Tanya Mensah
NRC/NRR/DPR/PSPB
To:
Mensah, T M, NRR/DPR, 415-3610
Shared Package
ML090680284 List:
References
TAC MD4832
Download: ML090650242 (2)


Text

DPR (applicable PM) follows up with the responsible branch to determine/discuss the basis.

NO No need to prioritize the incoming TR.

Continue to process TR per LIC-500.

YES The responsible branch can begin its acceptance review within 3 months of TR receipt?

Branch uses prioritization scheme (on page 2) to prioritize incoming TRs (prioritization not applicable to existing TR reviews, unless the TR is needed to support plant safety).

Branch informs their senior management of TR priority via a formal memo (copy DPR/PSPB). DPR to provide a template for the memo.

DPR PM informs the applicable vendor/OG of the incoming TR status.

Pre-submittal or pre-planning meetings between NRC staff and industry representatives are held to discuss incoming TR submittals (i.e.

proposed schedule, resources, required technical expertise/data).

TR Submitted To the NRC DPR PM opens a TAC (as soon as fee waiver requests are resolved).

Safety 4 possible points Standardization 4 possible points Specialized Resource Availability 4 possible points 1

Generic Safety Issue Emergent Technical Issue Plant Outage 2

1 Industry-wide initative Applicable only to entire groups of licensees (BWROG, PWROG, BWRVIP, etc)

Applicable only to partial groups of licensees 2

1 1

NRC staff expertise is readily available Technical Data is Available/Readily Accessible (if confirmatory calcs are needed to validate codes or info in the TR, this could require the use of a contractor, which takes longer) 1.5 1

TR is not complex (The review does not impact other technical areas).

1 TR approval is needed by a certain date to support industry activity. (i.e.

marketing)

.5 Resource Efficiency 4 possible points Resource Savings to the NRC Resource Savings to industry Resource Savings to the NRC and industry 1

2 1

Implementation 4 possible points Approved TR involves TS changes which need to be coordinated via the TSTF process to support licensee use.

1 Approved TR does not involve TS changes and can be referenced in a LAR by the licensee.

3