Enclosure 9, CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 1
ML081750084
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/30/2008
From: Bilanin A
Continuum Dynamics
To:
Office of Nuclear Reactor Regulation, Tennessee Valley Authority
References
00053157, TVA-BFN-TS-418, TVA-BFN-TS-431 CDI Report 08-04NP
Download: ML081750084 (154)


Text

ENCLOSURE9 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1,2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 EXTENDED POWER UPRATE (EPU)

CDI REPORT NO. 08-04NP, "ACOUSTIC AND LOW FREQUENCY HYDRODYNAMIC LOADS AT CLTP POWER LEVEL ON BROWNS FERRY NUCLEAR UNIT 1 STEAM DRYER TO 250 HZ" (NON-PROPRIETARY VERSION)

Attached is the Non-Proprietary Version of CDI Report No. 08-04, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz."

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information C.D.I. Report No. 08-04NP Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz Revision 1 Prepared by Continuum Dynamics, Inc.

34 Lexington Avenue Ewing, NJ 08618 Prepared under Purchase Order No. 00053157 for TVA / Browns Ferry Nuclear Plant Nuclear Plant Road, P. 0. Box 2000 PAB-2M Decatur, AL 35609 Approved by Alan J. Bilanin Prepared by Milton E. Teske June 2008

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information Executive Summary Measured strain gage time-history data in the four main steam lines at Browns Ferry Nuclear Unit 1 (BFNl) were processed by a dynamic model of the steam delivery system to predict loads on the full-scale steam dryer. These measured data were first converted to pressures, then positioned on the four main steam lines and used to extract acoustic sources in the system. A validated acoustic circuit methodology was used to predict the fluctuating pressures anticipated across components of the steam dryer in the reactor vessel. The acoustic circuit methodology included a low frequency hydrodynamic contribution, in addition to an acoustic contribution at all frequencies. This pressure loading was then provided for structural analysis to assess the structural adequacy of the steam dryer in BFN 1.

This effort provides BFNI with a dryer dynamic load definition that comes directly from measured BFNI full-scale data and the application of a validated acoustic circuit methodology, at a power level where data were acquired.

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information Table of Contents Section Page Executive Summary ...................................................

Table of Contents....................................................... 11 I. Introduction ............................................................ I1

2. Modeling Considerations ................................................ 2 2.1 Helmholtz Analysis ............................................... 2 2.2 Acoustic Circuit Analysis .......................................... 3 2.3 Low Frequency Contribution....................................... 4
3. Input Pressure Data ..................................................... 5
4. Results ................................................................ 13
5. Uncertainty Analysis................................................... 20
6. Conclusions............................................................ 22
7. References ............................................................. 23 ii

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information

1. Introduction In Spring 2005 Exelon installed new stream dryers into Quad Cities Unit 2 (QC2) and Quad Cities Unit 1. This replacement design, developed by General Electric, sought to improve dryer performance and overcome structural inadequacies identified on the original dryers, which had been in place for the last 30 years. As a means for confirming the adequacy of the steam dryer, the QC2 replacement dryer was instrumented with pressure sensors at 27 locations. These pressures formed the set of data used to validate the predictions of an acoustic circuit methodology under development by Continuum Dynamics, Inc. (C.D.I.) for several years [1].

One of the results of this benchmark exercise [2] confirmed the predictive ability of the acoustic circuit methodology for pressure loading across the dryer, with the inclusion of a low frequency hydrodynamic load. This methodology, validated against the Exelon full-scale data and identified as the Modified Bounding Pressure model, is used in the effort discussed herein.

This report applies this validated methodology to the Browns Ferry Nuclear Unit I (BFN1) steam dryer and main steam line geometry. Strain gage data obtained from the four main steam lines were used to predict pressure levels on the BFN1 full-scale dryer at Current Licensed Thermal Power (CLTP).

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information

2. Modeling Considerations The acoustic circuit analysis of the BFNI steam supply system is broken into two distinct analyses: a Helmholtz solution within the steam dome and an acoustic circuit analysis in the main steam lines. This section of the report highlights the two approaches taken here. These analyses are then coupled for an integrated solution.

2.1 Helmholtz Analysis A cross-section of the steam dome (and steam dryer) is shown below in Figure 2.1, with BFN1 dimensions as shown [3]. The complex three-dimensional geometry is rendered onto a uniformly-spaced rectangular grid (with mesh spacing of approximately 1.5 inches to accommodate frequency from 0 to 250 Hz in full scale), and a solution, over the frequency range of interest, is obtained for the Helmholtz equation a2p alp2 lp )2 2

+- = V p +---P = 0 2 2 aX2 a 22 a a*

where P is the pressure at a grid point, (o is frequency, and a is acoustic speed in steam.

R

__T i

e f i g I

Nominal

<f Water level Figure 2.1. Cross-sectional description of the steam dome and dryer, with the BFNI dimensions of a' = 16.0 in, b = 16.0 in, c' = 24.0 in, c = 14.5 in, d = 17.5 in, e =

15.5 in, f= 74.0 in, g = 163.0 in, i = 97.5 in, j = 189.0 in, k = 121.0 in, and R =

125.7 in (dimensions deduced from [3] to within 1.5 inches).

2

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information This equation is solved for incremental frequencies from 0 to 250 Hz (full scale), subject to the boundary conditions dP-0 dn normal to all solid surfaces (the steam dome wall and interior and exterior surfaces of the dryer),

dP Ocio) dn a normal to the nominal water level surface, and unit pressure applied to one inlet to a main steam line and zero applied to the other three.

2.2 Acoustic Circuit Analysis The Helmholtz solution within the steam dome is coupled to an acoustic circuit solution in the main steam lines. Pulsation in a single-phase compressible medium, where acoustic wavelengths are long compared to transverse dimensions (directions perpendicular to the primary flow directions), lend themselves to application of the acoustic circuit methodology. If the analysis is restricted to frequencies below 250 Hz, acoustic wavelengths are approximately 8 feet in length and wavelengths are therefore long compared to most components of interest, such as branch junctions.

Acoustic circuit analysis divides the main steam lines into elements which are each characterized, as sketched in Figure 2.2, by a length L, a cross-sectional area A, a fluid mean density p, a fluid mean flow velocity U, and a fluid mean acoustic speed a.

- A - element cross-sectional area U, ý, 5 0 D XnL Figure 2.2. Schematic of an element in the acoustic circuit analysis, with length L and cross-sectional area A.

3

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information Application of acoustic circuit methodology generates solutions for the fluctuating pressure P. and velocity Un in the nth element of the form Pn = [An eiklnxn + Bneik2nXn' i(Ot Un =- I L(o+Unkln )AneiklnXn + ('O+/- 2 2 k 2 n)Bneik2nXn eiWt On -- p 2 kin k2n where harmonic time dependence of the form e i(t has been assumed. The wave numbers k1 n and kzn are the two complex roots of the equation 2

kn +i -2 (.0+ Unkn) -2 (0) =0 Dna a where fn is the pipe friction factor for element n, Dn is the hydrodynamic diameter for element n, and i = V-ii . An and Bn are complex constants which are a function of frequency and are determined by satisfying continuity of pressure and mass conservation at element junctions.

The solution for pressure and velocity in the main steam lines is coupled to the Helmholtz solution in the steam dome, to predict the pressure loading on the steam dryer.

The main steam line piping geometry is summarized in Table 2.1.

Table 2.1. Main steam line lengths at BFN1. Main steam line diameter is 26 inch (ID = 24.0 in).

Main Steam Line Length to First Length to Second Strain Gage Strain Gage Measurement (ft) Measurement (ft)

A 9.5 34.5 B 9.5 34.5 C 10.0 34.5 D 9.5 34.5 2.3 Low Frequency Contribution RE (3)))

4

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information

3. Input Pressure Data Strain gages were mounted on the four main steam lines of BFN1. Three data sets were examined in this analysis. The first data set recorded the strain at Current Licensed Thermal Power (100% power level or CLTP), the second data set recorded the strain at near-zero voltage on the strain gages (EIC noise at CLTP, and the third data set recorded the strain at 9% power level. The data were provided in the following files:

Data File Name Power Level Voltage 20070608155619 100% 10.0 V 20070608155258 100% 0.01 V (EIC) 20070527180210 9% 10.0 V The strain gage signals were converted to pressures by the use of the conversion factors provided in [4] and summarized in Table 3.1. Exclusion frequencies were used to remove extraneous signals, as also identified in [4] and subsequent emails, and summarized in Table 3.2.

The electrical noise was removed by applying the function PS( 0)= PSN(0) 1 - P"_N0)]

where Ps(o) is the CLTP signal PSN(cO) corrected for electrical noise PN(O0), computed as a function of frequency co, and IPN(Co)/PsN(0O)I can be no larger than 0.5. These signals were further processed by the coherence factor and mean filtering as described in [2]. Coherence at CLTP conditions is shown in Figure 3.1.

The resulting main steam line pressure signals may be represented in two ways, by their minimum and maximum pressure levels, and by their PSDs. Table 3.3 provides the pressure level information, while Figures 3.2 to 3.5 compare the frequency content at the eight measurement locations. The frequency content around 218 Hz has been removed from the signals plotted here, in anticipation of the use of inserts in the blank standpipes on main steam lines A and D [5] to mitigate this load.

5

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information Table 3.1. Conversion factors from strain to pressure at CLTP conditions [4]. Channels are averaged to give the average strain; blank sensors indicate that the sensor was inoperative.

Strain to Pressure Channel Channel Channel Channel (psid/tstrain) Number Number Number Number MSL A Upper 2.997 1 2 3 4 MSL A Lower 3.027 5 6 7 8 MSL B Upper 3.034 9 10 11 12 MSL B Lower 2.993 13 14 15 16 MSL C Upper 2.912 17 18 19 20 MSL C Lower 2.962 21 22 23 24 MSL D Upper 2.959 25 26 27 28 MSL D Lower 3.007 29 30 31 32 Table 3.2. Exclusion frequencies for BFN1 strain gage data, as suggested in [4] and a subsequent email. VFD = variable frequency drive. Recirc = recirculation pumps.

Frequency Range (Hz) Exclusion Cause 0-2 Mean 59.8 - 60.2 Line Noise 119.9 - 120.1 Line Noise 179.8 - 180.2 Line Noise 239.9 - 240.1 Line Noise 51.3-51.7 VFD (lx) 127.0 - 128.5 Recirc Pumps A, B Speed (5x) 217.5 - 220.0 Standpipe Excitation Table 3.3. Main steam line (MSL) pressure levels in BFNI.

CLTP Minimum CLTP Maximum CLTP RMS Pressure (psid) Pressure (psid) Pressure (psid)

MSL A Upper -1.83 1.92 0.43 MSL A Lower -1.92 2.08 0.47 MSL B Upper -1.92 2.33 0.47 MSL B Lower -2.08 2.21 0.52 MSL C Upper -2.21 2.41 0.53 MSL C Lower -2.43 2.38 0.58 MSL D Upper -2.06 2.07 0.51 MSL D Lower -1.96 2.26 0.46 6

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information BFN1 CLTP: MSL A 1

0.8 C.)

a.) 0.6 0.4 0.2 0 50 100 150 200 250 Frequency (Hz)

BFN1 CLTP: MSL B 1

0.8 r) 0.6 0

a) 0.4 0.2 0 50 100 150 200 250 Frequency (Hz)

Figure 3.1a. Coherence between the upper and lower strain gage readings at BFNI: main steam line A (top); main steam line B (bottom).

7

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information BFN1 CLTP: MSL C 1

0.8 C.)

0.6 0 0.4 0.2 0 50 100 150 200 250 Frequency (Hz)

BFN1 CLTP: MSL D 1

0.8 0

0 0.6 0

0 0.4 U

0.2 0 50 100 150 200 250 Frequency (Hz)

Figure 3.lb. Coherence between the upper and lower strain gage readings at BFNI: main steam line C (top); main steam line D (bottom).

8

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information BFNI: MSL A Upper 0.1 0.01 N

0.001 C*4 0.4 0.0001 10-5 10-6 0 50 100 150 200 250 Frequency (Hz)

BFNI: MSL A Lower 0.1 0.01 N

0.001 0.0001 10.5 10-6 0 50 100 150 200 250 Frequency (Hz)

Figure 3.2. PSD comparison of pressure measurements on main steam line A at strain gage locations upper (top) and lower (bottom), for CLTP conditions.

9

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information BFNI: MSL B Upper 0.1 0.01 N

0.001 0.0001 10-5 10-6 0 50 100 150 200 250 Frequency (Hz)

BFNI: MSL B Lower 0.1 N 0.01

ý4 N 0.001 CA3 0.0001 10-5 10"6 0 50 100 150 200 250 Frequency (Hz)

Figure 3.3. PSD comparison of pressure measurements on main steam line B at strain gage locations upper (top) and lower (bottom), for CLTP conditions.

10

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information BFNI: MSL C Upper 0.1 0.01 N

0.001 0.0001 P-4 10-5 10-6 0 50 100 150 200 250 Frequency (Hz)

BFNI: MSL C Lower 0.1 0.01 N

-e 0.001 N-'

0.0001 C,)

10-5 10-6 0 50 100 150 200 250 Frequency (Hz)

Figure 3.4. PSD comparison of pressure measurements on main steam 1ine C at strain gage locations upper (top) and lower (bottom), for CLTP conditions.

11

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information BFNI: MSL D Upper 0.1 0.01 N

z~

0.001 0.0001 10-5 10-6 0 50 100 150 200 250 Frequency (Hz)

BFNI: MSL D Lower 0.1 0.01 N

0.001 0.0001 cai) 10-5 10-6 0 50 100 150 200 250 Frequency (Hz)

Figure 3.5. PSD comparison of pressure measurements on main steam line D at strain gage locations upper (top) and lower (bottom), for CLTP conditions.

12

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information

4. Results The measured main steam line pressure data were used to drive the validated acoustic circuit methodology for the BFN1 steam dome coupled to the main steam lines to make a pressure load prediction on the BFN1 dryer. A low resolution load, developed at the nodal locations identified in Figures 4.1 to 4.4, produces the maximum differential and RMS pressure levels across the dryer as shown in Figure 4.5. PSDs of the peak loads on either side of the dryer are shown in Figure 4.6.

13

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information 40 61 51"J 56 66 72 82 88

/14 96 3 7 23 291 39 45 55[ 65] 71[ 81 87 95 101 94

\12 86 221 80 70

_.44 sol 541 64 Figure 4.1. Bottom plates pressure node locations (low resolution), with pressures acting downward in the notation defined here.

14

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information 75 r'27 17 AI1 10 16 26 321 4ý 19 15 125 891 S41 T 5'

Figure 4.2. Top plates pressure node locations (low resolution), with pressures acting downward in the notation defined here.

15

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information Figure 4.3. Vertical plates: Pressures acting left to right on panels 6-11, 22-27, 38-43, and 50-54; acting right to left on panels 64-69, 80-85, and 94ý99 (low resolution).

16

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information I__ - 35

~rv-'r-1y 77 'N%

U 5V9 9 E'K 2541 1 34 60 Figure 4.4. Skirt plates: Pressure acting outward on the outer dryer 00/180' surfaces and the skirt (low resolution).

17

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information (3

Figure 4.5. Predicted loads on the low resolution grid identified in Figures 4.1 to 4.4, as developed by the Modified Bounding Pressure model, to 250 Hz. Low-numbered nodes are on the C-D side of the dryer, while high-numbered nodes are on the A-B side of the dryer.

18

This Document Does Not Contain Continuum Dynamics, Inc. Proprietary Information

((I (3)))

Figure 4.6. PSD of the maximum pressure loads predicted on the C-D side of the BFN1 dryer (top) and A-B side of the BFN I dryer (bottom).

19

This Document Contains Continuum Dynamics, Inc. Proprietary Information

5. Uncertainty Analysis The analysis of potential uncertainty occurring at BFNI consists of several contributions, including the uncertainty from collecting data on the main steam lines at locations other than the locations on Quad Cities Unit 2 (QC2) and the uncertainty in the Modified Bounding Pressure model. QC2 dryer data at Original Licensed Thermal Power (OLTP) conditions were used to generate an uncertainty analysis of the Acoustic Circuit Methodology (ACM) [2] for BFNI.

The approach taken for bias and uncertainty is similar to that used by Vermont Yankee for power uprate [6]. In this analysis, six "averaged pressures" are examined on the instrumented replacement dryer at QC2: averaging pressure sensors PI, P2, and P3; P3, P5, and P6; P7, P8, and P9; Pl0, P11, and P12; P18 and P20; and P19 and P21. These pressure sensors were all on the outer bank hoods of the dryer, and the groups are comprised of sensors located vertically above or below each other.

Bias is computed by taking the difference between the measured and predicted RMS pressure values for the six "averaged pressures", and dividing the mean of this difference by the mean of the predicted RMS. RMS is computed by integrating the PSD across the frequency range of interest and taking the square root Z (RMSmeasured

-RMSpredicted)

BIAS- N = 51 RMapredicted (5.1) where RMSmeasured is the RMS of the measured data and RMSpredicted is the RMS of the predicted data. Summations are over the number of "averaged pressures", or N = 6.

Uncertainty is defined as the fraction computed by the standard deviation X1Z (RIMSmcasurcd - RPMSprcdictcd )2 UNCERTAINTY = 1 (5.2) 1N Z Mpredicted ACM bias and uncertainty results are compiled for specified frequency ranges of interest, as directed by [7] and summarized in Table 5.1. Other random uncertainties, specific to BFN1, are summarized in Table 5.2 and are typically combined with the ACM results by SRSS methods to determine an overall uncertainty for BFN 1.

20

This Document Contains Continuum Dynamics, Inc. Proprietary Information Table 5.1. BFNl bias and uncertainty for specified frequency intervals. A negative bias indicates that the ACM overpredicts the QC2 data in that interval.

R[

(3)11 Table 5.2. Bias and uncertainty contributions to total uncertainty for BFN 1 plant data.

(3)))1 21

This Document Contains Continuum Dynamics, Inc. Proprietary Information

6. Conclusions The C.D.I. acoustic circuit analysis, using full-scale measured data for BFNI:

a) [(3)))

b) Predicts that the loads on dryer components are largest for components nearest the main steam line inlets and decrease inward into the reactor vessel.

22

This Document Contains Continuum Dynamics, Inc. Proprietary Information

7. References
1. Continuum Dynamics, Inc. 2005. Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes (Rev. 6). C.D.I. Report No. 04-09 (C.D.I. Proprietary).
2. Continuum Dynamics, Inc. 2007. Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with the Inclusion of a Low Frequency Hydrodynamic Contribution (Rev. 0). C.D.I. Report No. 07-09 (C.D.I. Proprietary).
3. Browns Ferry Unit 1 Drawings. 2006. Files: 729E229-1.tif, 729E229-2.tif, and 729E229-3.tif. BFNl Email from G. Nelson dated 07 March 2006.
4. Structural Integrity Associates, Inc. 2007. Browns Ferry Unit 1 Main Steam Line 100%

CLTP Strain Data Transmission. SIA Letter Report No. KKF-07-012.

5. Continuum Dynamics, Inc. 2007. Onset of Flow-Induced Vibration in the Main Steam Lines at Browns Ferry Unit 1: A Subscale Investigation of Standpipe Behavior (Rev. 0). C.D.I.

Report No. 08-01 (C.D.I. Proprietary).

6. Communication from Enrico Betti. 2006. Excerpts from Entergy Calculation VYC-3001 (Rev. 3), EPU Steam Dryer Acceptance Criteria, Attachment I: VYNPS Steam Dryer Load Uncertainty (Proprietary).
7. NRC Request for Additional Information on the Hope Creek Generating Station, Extended Power Uprate. 2007. TAC No. MD3002. RAI No. 14.67.
8. Structural Integrity Associates, Inc. 2007. Evaluation of Browns Ferry Unit 1 Strain Gage Uncertainty and Pressure Conversion Factors (Rev. 0). SIA Calculation Package No. BFN-12Q-302.
9. Continuum Dynamics, Inc. 2005. Vermont Yankee Instrument Position Uncertainty. Letter Report Dated 01 August 2005.
10. Exelon Nuclear Generating LLC. 2005. An Assessment of the Effects of Uncertainty in the Application of Acoustic Circuit Model Predictions to the Calculation of Stresses in the Replacement Quad Cities Units 1 and 2 Steam Dryers (Revision 0). Document No. AM-21005-008.
11. Continuum Dynamics, Inc. 2007. Finite Element Modeling Bias and Uncertainty Estimates Derived from the Hope Creek Unit 2 Dryer Shaker Test (Rev. 0). C.D.I. Report No. 07-27 (C.D.I. Proprietary).
12. NRC Request for Additional Information on the Hope Creek Generating Station, Extended Power Uprate. 2007. RAI No. 14.79.

23

This Document Contains Continuum Dynamics, Inc. Proprietary Information

13. NRC Request for Additional Information on the Hope Creek Generating Station, Extended Power Uprate. 2007. RAI No. 14.110.

24

ENCLOSURE 10 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1,2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 EXTENDED POWER UPRATE (EPU)

CDI REPORT NO. 08-16NP, "STRESS ASSESSMENT OF BROWNS FERRY NUCLEAR UNIT 2 STEAM DRYER WITH TIE-BAR MODIFICATIONS" (NON-PROPRIETARY VERSION)

Attached is the Non-Proprietary Version of CDI Report No. 08-16, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Tie-Bar Modifications."