MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:Report
MONTHYEARML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information ML23025A0752023-01-25025 January 2023 American Society of Mechanical Engineers, Section XI, Third 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report Cycle . ML22363A3922022-12-28028 December 2022 Cycle 14 Mellla+ Eigenvalue Tracking Data CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval CNL-22-100, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information ML22154A4042022-06-0303 June 2022 Unit 3 Cycle 20 Mellla+ Eigenvalue Tracking Data CNL-22-057, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use ML21277A1232021-10-0404 October 2021 Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation ML21246A2942021-09-29029 September 2021 Enclosufinal Ea/Fonsi for Tva'S Initial and Updated Triennial Decommissioning Funding Plans for Browns Ferry Nuclear Plant ISFSIs ML21246A2952021-09-29029 September 2021 Memo to File CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User ML20309A5052020-11-0303 November 2020 Inspector Notes Cover Sheet ML20255A0002020-09-24024 September 2020 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML20112F4852020-05-0606 May 2020 Staff Assessment of Flooding Focused Evaluation CNL-19-074, Extended Power Uprate - Flow Induced Vibration Summary Report2019-09-0404 September 2019 Extended Power Uprate - Flow Induced Vibration Summary Report CNL-19-004, Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2019-06-0707 June 2019 Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-19-041, Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report2019-04-16016 April 2019 Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information2019-03-13013 March 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report2018-11-29029 November 2018 Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report ML18283B5472018-10-10010 October 2018 Responding to Letter of 11/18/1977 from E. G. Case to G. Williams, Providing Environmental Qualification Information for Electrical Connectors in Reference of IE Bulletins 77-05 & 77-05A CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report2018-09-13013 September 2018 Extended Power Uprate - Flow Induced Vibration Summary Report CNL-18-060, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-05-31031 May 2018 Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test2018-04-16016 April 2018 Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus ML17222A3282017-09-0505 September 2017 Flood Hazard Mitigation Strategies Assessment ML17170A0732017-06-15015 June 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 9233 ML17114A3712017-04-20020 April 2017 Errata for BWRVIP-271NP: BWR Vessel and Internals Project, Testing and Evaluation of the Browns Ferry, Unit 2, 120 Degree Capsule ML17033B1642017-02-0202 February 2017 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement - Cycle 11 Operation Programs ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision ML16196A0882016-08-0505 August 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation ML16146A0182016-05-25025 May 2016 Special Report 296/2016-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML16028A2952016-01-29029 January 2016 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration ML16027A0592016-01-27027 January 2016 Snubbers Added to Lnservice Testing Program ML15356A6542015-12-22022 December 2015 Submittal of 10 CFR 50.46 30-Day Report PLA-7414, Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-11-19019 November 2015 Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 ML15321A4542015-11-13013 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask NL-15-2010, E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B2015-11-0202 November 2015 E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B NLS2015128, Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-10-29029 October 2015 Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 ZS-2015-0156, Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask2015-10-26026 October 2015 Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15313A1642015-10-0808 October 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) NL-15-169, Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 72015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 NL-15-169, Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program2015-09-21021 September 2015 Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan2015-09-21021 September 2015 Browns Ferry, Units 1, 2, and 3, Startup Test Plan ML15282A2392015-09-21021 September 2015 Flow Induced Vibration Analysis and Monitoring Program ML15282A2402015-09-21021 September 2015 Startup Test Plan ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 2023-07-31
[Table view] Category:Miscellaneous
MONTHYEARML23025A0752023-01-25025 January 2023 American Society of Mechanical Engineers, Section XI, Third 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report Cycle . CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval CNL-18-060, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-05-31031 May 2018 Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test2018-04-16016 April 2018 Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test ML17170A0732017-06-15015 June 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 9233 ML17033B1642017-02-0202 February 2017 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement - Cycle 11 Operation Programs ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16146A0182016-05-25025 May 2016 Special Report 296/2016-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML16028A2952016-01-29029 January 2016 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration ML15356A6542015-12-22022 December 2015 Submittal of 10 CFR 50.46 30-Day Report PLA-7414, Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-11-19019 November 2015 Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 ML15321A4542015-11-13013 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask NLS2015128, Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-10-29029 October 2015 Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 ZS-2015-0156, Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask2015-10-26026 October 2015 Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15313A1642015-10-0808 October 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15254A5432015-09-11011 September 2015 Submittal of 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al NL-15-1461, Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2015-08-21021 August 2015 Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B PLA-7374, Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-08-20020 August 2015 Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 NRC-15-0085, Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask ZS-2015-0131, Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask2015-08-18018 August 2015 Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask ML15246A1452015-08-11011 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information ML14356A3622015-02-11011 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) CNL-14-210, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-12-22022 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. CNL-14-129, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant2014-08-28028 August 2014 Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant ZS-2014-0271, Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B2014-08-18018 August 2014 Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-0202 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report2013-09-16016 September 2013 10 CFR 71.95 - Cask 8-120B - 60 Day Report NRC-13-0052, CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time2013-09-0909 September 2013 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time NL-13-1898, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-08-30030 August 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B ML13247A0362013-08-20020 August 2013 Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13273A6912013-08-20020 August 2013 Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13177A3522013-07-16016 July 2013 Review of Commitment Submittal for License Renewal Regarding the One-Time Inspection Procedure (TAC ME7797, ME7798, and ME7799) ML13144A5762013-05-22022 May 2013 Watt Bar, Units 1 & 2, Report of Drug Testing Error in Accordance with 10 CFR 26.719(c)(1) ML13115A9552013-05-16016 May 2013 Final ASP Analysis-Browns Ferry Nuclear Plant, Unit 3, Reactor Trip and Subsequent Loss of Offsite Power Due Failure of Unit Station System Transformer Differential Relay (LER 296/12-004) ML13092A3922013-03-27027 March 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition - Transition Report ML12356A1762012-11-30030 November 2012 Kld TR-505, Rev. 1, Development of Evacuation Time Estimates, Part 6 of 8 ML12335A3402012-11-27027 November 2012 Tennessee Valley Authority - Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review of ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages ML1100502872010-06-22022 June 2010 Investigation of Tritium Releases to Groundwater ML1019304172010-05-0606 May 2010 Tritium Database Report ML12171A1892010-03-31031 March 2010 Integrated Resource Plan, Tva'S Environmental & Energy Future ML1008800282010-03-24024 March 2010 Day Report of Emergency Core Cooling System Evaluation Model Changes ML1002010162010-01-15015 January 2010 Gnf 0000-0111-8036-R0-NP, GE14 Fuel Thermal-Mechanical Information ML1002010152010-01-15015 January 2010 NEDO-32484, Rev. 7, Browns Ferry Nuclear Plant Units 1, 2, and 3 SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis. 2023-01-25
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 29, 2016 10 CFR 71.95 ATTN : Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket No. 50-259, 50-260, and 50-296
Subject:
10 CFR 71.95 Notification Associated With the Failure to Observe Certificate of Compliance Condition of the 8-1208 Secondary Lid Test Port Configuration
Reference:
Letter from EnergySolutions to TVA, "ES-CD-0-2015-006: 10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-120B secondary lid test port configuration ," dated September 21 , 2015 In accordance with 10 CFR 71.95(a), the Tennessee Valley Authority (TVA) is reporting the use of model 8-120B casks which were not in compliance with Certificate of Compliance (CoC) No. 9168. EnergySolutions submitted a report to TVA on September 21 , 2015, provid ing information with respect to the non-compliance with the CoC No. 9168 for the model 8-120B cask. The referenced EnergySolutions letter noted that the 8-120B-6 secondary lids used by Browns Ferry Nuclear Plant (BFN) did not comply with approved 8-120B Safety Analysis Report (SAR) drawings. The secondary lids were fabricated with a cladding tube inside the test port hole, but the tube is not shown on the SAR license drawings referenced by the CoC. This is a documentation only issue, and EnergySolutions documents in the referenced letter that there were no safety consequences due to the as-built test volumes with tubes installed in the secondary lid meeting the basis for the pre-shipment leak rate test hold time.
The 8-120B-6 casks contained Class A radioactive waste with a dose rate greater than one (1) Rem per hour at three (3) meters, which required the use of Type B packages for shipment.
U.S. Nuclear Regulatory Commission Page 2 January 29, 2016 BFN shipped an 8-1208 cask as a Type B package on five separate occasions:
- February9, 2015 (#150204)
- February 18, 2015 (#150210)
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact J. L. Paul, Nuclear Site Licensing Manager, at (256) 729-2636.
Enclosure:
Letter from EnergySolutions to TVA, "ES-CD-0-2015-006: 10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-1208 secondary lid test port configuration ," dated September 21 , 2015 cc (w/ Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant
ENCLOSURE Browns Ferry Nuclear Plant Units 1, 2, and 3 Letter from EnergySolutions to TVA, "ES-CD-0-2015-006: 10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-1208 secondary lid test port configuration," dated September 21 , 2015 See Enclosed
September 21, 2015 Letter ID: ES-CD-O-2015-006
Subject:
10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-120B secondary lid test port configuration.
Dear Valued Customer:
During a recent NRC audit performed September 8-10, 2015 assessing implementation of EnergySolutions 10CFR71 program at our Columbia, SC and Barnwell, SC facilities, the NRC inspection team identified that four out of eight 8-120B secondary lids (Subject Secondary Lid ID numbers 8-120B-5, -6, -7 and -8) did not comply with approved 8-120B SAR drawings referenced in the current revision of the Certificate of Compliance 9168 (CoC).
The subject secondary lids were fabricated with a cladding tube inside the test port hole, but the tube is not shown on the SAR licensing drawings referenced by the CoC. Based on this, the conditions of approval in the CoC were not observed for any Type B shipments of radioactive material made in 8-120B casks utilizing the subject secondary lids. Subject secondary lids were entered into service between October - December, 2014 and have been used for a total of 52 shipments by licensees. The condition was determined not to have a safety consequence because the as-built test volumes with tubes installed in subject secondary lids met the basis for the pre-shipment leak rate test hold time.
Although, cladding tubes were part of the original NRC approved cask configuration in the old 8-120B secondary lids (used before August 31, 2013), they were inadvertently omitted in the new secondary lids design entered into service in September, 2013. Due to this condition, EnergySolutions suspended the use of the 8-120B casks with subject secondary lids. Further, EnergySolutions, on September 16, 2015, submitted a CoC amendment request to NRC requesting authorized usage of the subject secondary lids. EnergySolutions will retrofit all 8-120B secondary lids with the tube design at the earliest opportunity. We expect that the NRC will grant a new CoC (Rev.22) shortly and the use of the affected 8-120B casks with subject secondary lids will resume. All our 8-120B users will be provided with a separate notification and an updated 8-120B cask book which will clarify the status of the affected CoC that the 8-120B casks can operate under.
Please see EnergySolutions attached report containing the information required by 10 CFR 71.95. In the report, EnergySolutions describes the cause of the occurrence and provides information that supports that there is no safety significance associated with this condition.
We expect that the information required for individual users to make their own notifications is contained within this report. Reference to this report in individual user reports is appropriate, if you so choose.
1
We sincerely apologize for any inconvenience this issue may have caused within your organization. Our corrective actions as a result of this issue are intended to prevent recurrence of similar issues and to ensure the highest quality of products and services that we provide.
For additional details, please contact Aleksandr Gelfond at axgelfond@energysolutions.com or 803-587- 9117.
Sincerely, Mark S. Lewis General Manager, Cask Logistics Logistics, Processing and Disposal EnergySolutions, LLC : EnergySolutions Report associated with Failure to Observe Certificate of Compliance Conditions for the 8-120B Secondary Lid Test Port Configuration (4 pages) cc: Dan Shum (EnergySolutions) cc: Aleksandr Gelfond (EnergySolutions) 2
Failure to Observe Certificate of Compliance Conditions for the 8-120B Secondary Lid Test Port Configuration September 18, 2015
- 1) Abstract During a recent NRC inspection of EnergySolutions facility in Columbia, SC, the inspection team identified that the secondary lids of four 8-120B casks1 did not comply with the approved SAR drawings referenced by the latest revision of the Certificate of Compliance 9168 (CoC). The secondary lids on the subject casks were fabricated with a cladding tube inside the test port hole, but the tube is not shown on the SAR drawing referenced by the CoC. The conditions of approval in the CoC were therefore not observed for any shipments of Type B quantities of radioactive material made using the subject secondary lids.
Attachment 1 illustrates the secondary lid test port and tube configurations.
The purpose of the secondary lid test port tube is to isolate the pre-shipment test volume from the interspace between the two 3 1/4" thick plates that make up the secondary lid. The isolation of the test volume provided by the tube assures that the test volume does not exceed the limit on which the hold time for the pre-shipment leak rate test is based. However, if the free volume in the interspace between the plates is negligible, then the isolation function of the tube is not necessary.
The tube was shown as a design feature in the 8-120B SAR drawings referenced by Revision 17 of the CoC, and previous revisions, but the tube was not credited with any safety function in the SAR. The tube was inadvertently omitted when the lids were redesigned for operational enhancements in CoC Revision 19. The omission was identified by EnergySolutions corrective action system while the subject lids were still in fabrication. A corrective action was assigned to measure the as-built test volumes, which included the void space between the thick plates since there were no tubes installed. The test volumes were found to exceed the volume basis for pre-shipment leak rate test hold time calculated in the SAR. The tubes were therefore installed, and the lids were placed on QA-hold using EnergySolutions noncompliance procedure because they did not meet the lid configuration authorized by the CoC in effect at that time (i.e., CoC, Rev. 20). EnergySolutions subsequently made a determination that prior NRC authorization was not required (because the tubes had been part of the previous NRC-approved 8-120B cask design and were inadvertently omitted from the new secondary lid design), cleared the hold, and released the lids for use. The tubes were restored to the SAR drawings as part of a broader license amendment request submitted in May 2014, but the request was withdrawn for unrelated reasons. A new license amendment request submitted to the NRC on 9/16/2015 reintroduces the tubes to the secondary lid design.
The presence of the tubes in the subject secondary lid test ports has no safety consequence because the as-built test volume meets the basis for the pre-shipment leak rate test hold time.
1 Secondary lid numbers 8-120B-5, -6, -7, and -8.
1
- 2) Narrative Description of the Event a) Status of Components All of the 8-120B casks operating with the secondary lids that have the tube installed in the test port (i.e., secondary lid numbers 8-120B-5, -6, -7, and -8) have been removed from service until CoC No. 9168 is amended to include the tube.
b) Dates of Occurrences Casks with the secondary lids that have the tube installed in the test port (i.e., secondary lid numbers 8-120B-5, -6, -7, and -8) were entered into service between October 2014 and December 2014 and have been used for a total of 52 Type B shipments (by all licensees).
c) Cause of Error EnergySolutions cleared the hold and released the subject secondary lids for use, believing that prior NRC authorization was not required because the tubes had been part of the previously NRC-approved 8-120B cask design and were inadvertently omitted from the new secondary lid design.
d) Failure Mode, Mechanism, and Effects Not applicable.
e) Systems or Secondary Functions Affected Not applicable.
f) Method of Discovery of the Error The error was identified by the NRC inspection team during an audit at the EnergySolutions facility in Columbia, SC.
- 3) Assessment of Safety Consequences The presence of the tubes in the subject secondary lid test ports has no safety consequence because the as-built test volume meets the basis for the pre-shipment leak rate test hold time.
The secondary lid test port configuration of the subject lids is similar to the design previously authorized for use prior to CoC Revision 19.
- 4) Planned Corrective Actions The following corrective actions are planned by EnergySolutions:
EnergySolutions has removed 8-120B casks with the secondary lids that have the tube installed in the test port (i.e., secondary lid numbers 8-120B-5, -6, -7, and -8) from service until authorized to resume their use.
2
EnergySolutions has evaluated the condition for reportability under 10 CFR 71.95 and has concluded that it is reportable.
EnergySolutions will notify the licensees (cask users) that have made shipments using the 8-120B casks with the affected secondary lids and advise them to evaluate reportability under 10 CFR 71.95.
EnergySolutions has prepared and submitted an application to NRC to amend CoC No. 9168 to include the test port tube in the four subject secondary lids as an authorized configuration.
EnergySolutions will perform an apparent cause analysis and identify additional corrective actions to prevent recurrence.
- 5) Previous Similar Events Involving the 8-120B No previous similar events have been identified.
- 6) Contact for Additional Information Dan Shrum EnergySolutions Senior Vice President, Regulatory Affairs (801) 649-2109
- 7) Extent of Exposure of Individuals to Radiation or Radioactive Materials None.
3
Atttachment 1 Secondarry Lid Test Port P Seconddary Lid Tesst Port with Cladding C Tubbe without Cladding Tube (subject secondary liids) (current CoC configguration) 4
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 29, 2016 10 CFR 71.95 ATTN : Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket No. 50-259, 50-260, and 50-296
Subject:
10 CFR 71.95 Notification Associated With the Failure to Observe Certificate of Compliance Condition of the 8-1208 Secondary Lid Test Port Configuration
Reference:
Letter from EnergySolutions to TVA, "ES-CD-0-2015-006: 10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-120B secondary lid test port configuration ," dated September 21 , 2015 In accordance with 10 CFR 71.95(a), the Tennessee Valley Authority (TVA) is reporting the use of model 8-120B casks which were not in compliance with Certificate of Compliance (CoC) No. 9168. EnergySolutions submitted a report to TVA on September 21 , 2015, provid ing information with respect to the non-compliance with the CoC No. 9168 for the model 8-120B cask. The referenced EnergySolutions letter noted that the 8-120B-6 secondary lids used by Browns Ferry Nuclear Plant (BFN) did not comply with approved 8-120B Safety Analysis Report (SAR) drawings. The secondary lids were fabricated with a cladding tube inside the test port hole, but the tube is not shown on the SAR license drawings referenced by the CoC. This is a documentation only issue, and EnergySolutions documents in the referenced letter that there were no safety consequences due to the as-built test volumes with tubes installed in the secondary lid meeting the basis for the pre-shipment leak rate test hold time.
The 8-120B-6 casks contained Class A radioactive waste with a dose rate greater than one (1) Rem per hour at three (3) meters, which required the use of Type B packages for shipment.
U.S. Nuclear Regulatory Commission Page 2 January 29, 2016 BFN shipped an 8-1208 cask as a Type B package on five separate occasions:
- February9, 2015 (#150204)
- February 18, 2015 (#150210)
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact J. L. Paul, Nuclear Site Licensing Manager, at (256) 729-2636.
Enclosure:
Letter from EnergySolutions to TVA, "ES-CD-0-2015-006: 10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-1208 secondary lid test port configuration ," dated September 21 , 2015 cc (w/ Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant
ENCLOSURE Browns Ferry Nuclear Plant Units 1, 2, and 3 Letter from EnergySolutions to TVA, "ES-CD-0-2015-006: 10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-1208 secondary lid test port configuration," dated September 21 , 2015 See Enclosed
September 21, 2015 Letter ID: ES-CD-O-2015-006
Subject:
10 CFR 71.95 notification associated with the failure to observe Certificate of Compliance condition of the 8-120B secondary lid test port configuration.
Dear Valued Customer:
During a recent NRC audit performed September 8-10, 2015 assessing implementation of EnergySolutions 10CFR71 program at our Columbia, SC and Barnwell, SC facilities, the NRC inspection team identified that four out of eight 8-120B secondary lids (Subject Secondary Lid ID numbers 8-120B-5, -6, -7 and -8) did not comply with approved 8-120B SAR drawings referenced in the current revision of the Certificate of Compliance 9168 (CoC).
The subject secondary lids were fabricated with a cladding tube inside the test port hole, but the tube is not shown on the SAR licensing drawings referenced by the CoC. Based on this, the conditions of approval in the CoC were not observed for any Type B shipments of radioactive material made in 8-120B casks utilizing the subject secondary lids. Subject secondary lids were entered into service between October - December, 2014 and have been used for a total of 52 shipments by licensees. The condition was determined not to have a safety consequence because the as-built test volumes with tubes installed in subject secondary lids met the basis for the pre-shipment leak rate test hold time.
Although, cladding tubes were part of the original NRC approved cask configuration in the old 8-120B secondary lids (used before August 31, 2013), they were inadvertently omitted in the new secondary lids design entered into service in September, 2013. Due to this condition, EnergySolutions suspended the use of the 8-120B casks with subject secondary lids. Further, EnergySolutions, on September 16, 2015, submitted a CoC amendment request to NRC requesting authorized usage of the subject secondary lids. EnergySolutions will retrofit all 8-120B secondary lids with the tube design at the earliest opportunity. We expect that the NRC will grant a new CoC (Rev.22) shortly and the use of the affected 8-120B casks with subject secondary lids will resume. All our 8-120B users will be provided with a separate notification and an updated 8-120B cask book which will clarify the status of the affected CoC that the 8-120B casks can operate under.
Please see EnergySolutions attached report containing the information required by 10 CFR 71.95. In the report, EnergySolutions describes the cause of the occurrence and provides information that supports that there is no safety significance associated with this condition.
We expect that the information required for individual users to make their own notifications is contained within this report. Reference to this report in individual user reports is appropriate, if you so choose.
1
We sincerely apologize for any inconvenience this issue may have caused within your organization. Our corrective actions as a result of this issue are intended to prevent recurrence of similar issues and to ensure the highest quality of products and services that we provide.
For additional details, please contact Aleksandr Gelfond at axgelfond@energysolutions.com or 803-587- 9117.
Sincerely, Mark S. Lewis General Manager, Cask Logistics Logistics, Processing and Disposal EnergySolutions, LLC : EnergySolutions Report associated with Failure to Observe Certificate of Compliance Conditions for the 8-120B Secondary Lid Test Port Configuration (4 pages) cc: Dan Shum (EnergySolutions) cc: Aleksandr Gelfond (EnergySolutions) 2
Failure to Observe Certificate of Compliance Conditions for the 8-120B Secondary Lid Test Port Configuration September 18, 2015
- 1) Abstract During a recent NRC inspection of EnergySolutions facility in Columbia, SC, the inspection team identified that the secondary lids of four 8-120B casks1 did not comply with the approved SAR drawings referenced by the latest revision of the Certificate of Compliance 9168 (CoC). The secondary lids on the subject casks were fabricated with a cladding tube inside the test port hole, but the tube is not shown on the SAR drawing referenced by the CoC. The conditions of approval in the CoC were therefore not observed for any shipments of Type B quantities of radioactive material made using the subject secondary lids.
Attachment 1 illustrates the secondary lid test port and tube configurations.
The purpose of the secondary lid test port tube is to isolate the pre-shipment test volume from the interspace between the two 3 1/4" thick plates that make up the secondary lid. The isolation of the test volume provided by the tube assures that the test volume does not exceed the limit on which the hold time for the pre-shipment leak rate test is based. However, if the free volume in the interspace between the plates is negligible, then the isolation function of the tube is not necessary.
The tube was shown as a design feature in the 8-120B SAR drawings referenced by Revision 17 of the CoC, and previous revisions, but the tube was not credited with any safety function in the SAR. The tube was inadvertently omitted when the lids were redesigned for operational enhancements in CoC Revision 19. The omission was identified by EnergySolutions corrective action system while the subject lids were still in fabrication. A corrective action was assigned to measure the as-built test volumes, which included the void space between the thick plates since there were no tubes installed. The test volumes were found to exceed the volume basis for pre-shipment leak rate test hold time calculated in the SAR. The tubes were therefore installed, and the lids were placed on QA-hold using EnergySolutions noncompliance procedure because they did not meet the lid configuration authorized by the CoC in effect at that time (i.e., CoC, Rev. 20). EnergySolutions subsequently made a determination that prior NRC authorization was not required (because the tubes had been part of the previous NRC-approved 8-120B cask design and were inadvertently omitted from the new secondary lid design), cleared the hold, and released the lids for use. The tubes were restored to the SAR drawings as part of a broader license amendment request submitted in May 2014, but the request was withdrawn for unrelated reasons. A new license amendment request submitted to the NRC on 9/16/2015 reintroduces the tubes to the secondary lid design.
The presence of the tubes in the subject secondary lid test ports has no safety consequence because the as-built test volume meets the basis for the pre-shipment leak rate test hold time.
1 Secondary lid numbers 8-120B-5, -6, -7, and -8.
1
- 2) Narrative Description of the Event a) Status of Components All of the 8-120B casks operating with the secondary lids that have the tube installed in the test port (i.e., secondary lid numbers 8-120B-5, -6, -7, and -8) have been removed from service until CoC No. 9168 is amended to include the tube.
b) Dates of Occurrences Casks with the secondary lids that have the tube installed in the test port (i.e., secondary lid numbers 8-120B-5, -6, -7, and -8) were entered into service between October 2014 and December 2014 and have been used for a total of 52 Type B shipments (by all licensees).
c) Cause of Error EnergySolutions cleared the hold and released the subject secondary lids for use, believing that prior NRC authorization was not required because the tubes had been part of the previously NRC-approved 8-120B cask design and were inadvertently omitted from the new secondary lid design.
d) Failure Mode, Mechanism, and Effects Not applicable.
e) Systems or Secondary Functions Affected Not applicable.
f) Method of Discovery of the Error The error was identified by the NRC inspection team during an audit at the EnergySolutions facility in Columbia, SC.
- 3) Assessment of Safety Consequences The presence of the tubes in the subject secondary lid test ports has no safety consequence because the as-built test volume meets the basis for the pre-shipment leak rate test hold time.
The secondary lid test port configuration of the subject lids is similar to the design previously authorized for use prior to CoC Revision 19.
- 4) Planned Corrective Actions The following corrective actions are planned by EnergySolutions:
EnergySolutions has removed 8-120B casks with the secondary lids that have the tube installed in the test port (i.e., secondary lid numbers 8-120B-5, -6, -7, and -8) from service until authorized to resume their use.
2
EnergySolutions has evaluated the condition for reportability under 10 CFR 71.95 and has concluded that it is reportable.
EnergySolutions will notify the licensees (cask users) that have made shipments using the 8-120B casks with the affected secondary lids and advise them to evaluate reportability under 10 CFR 71.95.
EnergySolutions has prepared and submitted an application to NRC to amend CoC No. 9168 to include the test port tube in the four subject secondary lids as an authorized configuration.
EnergySolutions will perform an apparent cause analysis and identify additional corrective actions to prevent recurrence.
- 5) Previous Similar Events Involving the 8-120B No previous similar events have been identified.
- 6) Contact for Additional Information Dan Shrum EnergySolutions Senior Vice President, Regulatory Affairs (801) 649-2109
- 7) Extent of Exposure of Individuals to Radiation or Radioactive Materials None.
3
Atttachment 1 Secondarry Lid Test Port P Seconddary Lid Tesst Port with Cladding C Tubbe without Cladding Tube (subject secondary liids) (current CoC configguration) 4